Analysis on the Accuracy of Building Construction Cost Estimation by Activation Function and Training Model Configuration (활성화함수와 학습노드 진행 변화에 따른 건축 공사비 예측성능 분석)

  • Lee, Ha-Neul;Yun, Seok-Heon
    • Journal of KIBIM
    • /
    • v.12 no.2
    • /
    • pp.40-48
    • /
    • 2022
  • It is very important to accurately predict construction costs in the early stages of the construction project. However, it is difficult to accurately predict construction costs with limited information from the initial stage. In recent years, with the development of machine learning technology, it has become possible to predict construction costs more accurately than before only with schematic construction characteristics. Based on machine learning technology, this study aims to analyze plans to more accurately predict construction costs by using only the factors influencing construction costs. To the end of this study, the effect of the error rate according to the activation function and the node configuration of the hidden layer was analyzed.

A Study on the Derivation of Key Management Works by Construction Progress through the Analysis of Construction Supervision Data (건설감리 검측데이터 분석을 통한 공사 진행도별 중점관리공종 도출)

  • Yoo, Na-yeong;Kim, Ha-neul;Kim, Ha-rim;Cho, Hun-Hee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.11a
    • /
    • pp.131-132
    • /
    • 2022
  • The type and proportion of construction work varies depending on the stage of progress, and the frequency of inspection and defect occurrences are different. If it is determined to be defective after the inspection, a delay may occur, and additional manpower and resources are required. Therefore, it is necessary to prevent these risks by classifying, deriving, and managing key management woks according to the progress. This study aims to contribute to the efficiency of the supervisor's inspection work by identifying the types of construction that should be managed intensively for each construction progress and deriving the time when defects occur frequently in each construction type.

  • PDF

Measurement during Construction of Nakdong Bridge by Incremental Launching Method (낙동강교 ILM 가설에 따른 시공 중 계측)

  • Kim, Hyung-Tae;Cho, Nam-So;Jung, Ji-Man;Yang, Sung-Man
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.575-580
    • /
    • 2007
  • As the volume of traffic in southern part of the republic of Korea grew, expansion of transportation was required. In that purpose, the railway between Samnangjin and Gwangyang is being extended to a double-track line. This construction includes Nakdong bridge located across Nakdong river. This truss bridge is constructed in incremental launching method (ILM) and composed of two sections, straight line and curved one. Bridge construction in the method goes with the shift of roller supports which results in the change of structural system. To accomplish safe construction, the measurement during the whole launching stages. The locations of member in severe condition and the corresponding response values were estimated through the preliminary construction stage analysis. Based on the analysis, the measurement during construction was planned. Several sensors and measurement devices were installed at appropriate locations. During the whole launching stages, the measurement was performed and the corresponding data were monitored and stored in real time. The comparison of the responses from the analysis and the measurement showed no indication of yielding of the structural members. Consequently, the construction of Nakdong bridge was concluded to be relevant.

  • PDF

A Study of the Risk Analysis Technique Optimization in the Pre-Project Evaluation Phase of the Development Projects (개발사업 사전평가단계에 적용하는 위험분석기법 최적화 연구)

  • Kim, Han;Kim, Seon-Gyoo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.517-520
    • /
    • 2008
  • The city refreshing development projects in the domestic recently have been performed under leading of public institution laying stress on new city and existing urban district. These development projects are still staying in safety control level despite risk factor management at preliminary estimation stage has been more important factor to success and add value creation. Understanding inaccurately about various risk analysis techniques that can analyze risk factors and the insufficient application of step that can analysis technique s could make projects more difficult. Therefore, this research suggests the more effective methods for risk analysis that can control the risks in the pre-project evaluation stage.

  • PDF

Effect Analysis of Duration and Costs According to Construction Method Selected by Design for Safety - Focused on Structural Frame for Exterior Wall Cladding - (설계 안전성 검토에 의해 선정된 공법의 공기와 공사비 영향 분석 - 외벽 바탕 구조물 공법 사례를 중심으로 -)

  • Kim, Min-Kyu;Kim, Jin-Dong;Lee, Young-Do;Kim, Gwang-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.20 no.3
    • /
    • pp.297-304
    • /
    • 2020
  • Design for Safety(DfS) at the design stage is introduced and executed in order to fundamentally reduce the occurrence of construction safety accidents in Korea. Therefore, in this study, the construction method selected by Design for Safety can reduce safety accidents, but the effects on construction duration and costs were examined to confirm the effectiveness of various aspects. The construction method of the structural frame for the exterior wall cladding of the building, which have the factors for the fall accident, was selected for construction safety and compared and analyzed in terms of construction duration and costs. As a result, it was found to be effective not only in terms of safety, but also in terms of construction duration and costs. Therefore, it is considered that the construction method selected by the Design for Safety at the design stage will have a positive effect on the entire construction project.

An Effective Analysis and Management of Technical Risk to Turn-key based Plant Construction Contracts using Systems Engineering (시스템엔지니어링을 이용한 턴키방식 플랜트 건설계약의 기술적 위험요인 효과적 분석 및 관리)

  • Hong, Dae Geun;Byun, Hee Chul;Suh, Suk-Hwan
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.10 no.2
    • /
    • pp.59-69
    • /
    • 2014
  • In the bidding stage of turn-key based plant construction contracts, owners provide design and performance basis for contractors instead of giving design drawing. To win the bid for a plant construction, the contractors should be obliged to satisfy and ensure owners'requirements such as design and performance basis in a plant construction project, In other words, owners imposes technical risk of the design to the contractors by specifying responsibility for the analysis and verification of the plant construction. Thus, it is very important that contracters make accurate and realistic basic design plan in a short period of time. To deal with such a situation, we propose a systems engineering approach for the analysis and management of the technical risk. Specifically, we first: 1) Analyzes technical risk related with the plant design information for the bidders, followed by 2) Developing stakeholder requirements for the basic engineering design, and 3) System requirements for dealing with technical risk. Also, in this paper, we proposed converting method from MOE(Measure of Effectiveness) to MOP(Measure of Performance) in the risk analysis. To show the effectiveness of the proposed method, we carried out a case study.

Balancing Technic Based on Rotor Dynamics Analysis of Test Rig (Test Rig 동특성 분석에 따른 밸런싱 기술 적용)

  • Hwang, Dukyoung;Jung, Chonwoo;Park, Insun;Shin, Dongmin;Song, Jinseok
    • Transactions of the Korean Society for Noise and Vibration Engineering
    • /
    • v.27 no.2
    • /
    • pp.204-212
    • /
    • 2017
  • The rotor dynamics and balancing technic for rotating equipment during engineering and manufacture stage are to be carefully considered in order to minimize the operation troubles regarding vibration during commissioning stage. In this paper, the test rig, which includes the disks as balancing plane, is designed and manufactured, so that the characteristic of rotor dynamics can be analyzed such as critical speed and mode shape. The critical speed predicted through natural frequency analysis is verified by the actual measurement on bearing housing vibration during start-up condition of test rig. The low speed balancing and the operating speed balancing test are performed respectively with consideration of first critical speed, and the residual unbalance amounts are estimated in accordance with the relevant method described in API standard. In addition, the single and dual plane balancing are carried out on main disk and trim disk depended on phase information at each balancing step.

Object-Parameter Integrated Schematic Estimation Model for Predicting Office Building Interior-finishing Costs (오브젝트-파라미터 통합 오피스 마감공사비 개산견적 모델)

  • Park, Sung-Ho;Koo, Kyo-Jin;Park, Sung-Chul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.11a
    • /
    • pp.159-165
    • /
    • 2008
  • For deciding the profitability and feasibility of the construction project, the schematic estimation has to not only link the design decision-making but also estimate the cost with reliability. The Object-based schematic estimation system was developed for easily linking with design-making and supports to evaluate the design alternatives in the design development stage but didn't consider the cost estimated by object supplementary and parameter work item. This research presents the Integrated Object-Parameter Schematic Estimation Model in the design development stage that can lead to more accurately estimate the cost through analyzing historical data from the high-storied office buildings. For the development of the proposed model for schematic estimation, after analyzing and classifying the work items from the Bills of Quantities(BOQs) and drawings of historical data, this research proposed the methods of estimating cost in accordance with attributes of each work item using regression analysis. In addition, a case study is performed for the effectiveness as comparing the proposed model with the previous estimating model.

  • PDF

An Energy Performance Comparison of University Lecture Facilities for Energy Saving Building Design (에너지 절약형 건축물 설계를 위한 대학 강의동 형태별 에너지 성능 비교에 관한 연구)

  • Kim, Tae-Hoon;Seo, Ji-Hyo;Choo, Seung-Yeon
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.34 no.11
    • /
    • pp.105-112
    • /
    • 2018
  • Global environmental problems are growing, and the importance of buildings with high energy consumption has been emphasized. In Korea, the Ministry of Land, Transport and Maritime Affairs has been promoting the mandatory zero energy building since 2020, and guidelines related to the zero energy building have been developed. In addition, based on the "Energy-saving Design Criteria for Buildings" of the "Green Building Promotion Act" in Korea, the standards for energy-saving design are specified and the energy saving plan is written. Besides, the 'Energy-saving construction standards for eco-friendly houses' also specify insulation, machinery, equipment, and sunshade. Also, there is little consideration about the cost such as construction cost and material cost which should be considered important in the construction stage. Therefore, this study aims at analysis of building type and energy performance versus materials for energy saving building design considering energy performance in planning aspect of initial design stage. In this study, because the variables can not be neglected in this study, it is selected as the lecture facility of the 'K' university campus building which can consider the remaining factors except the passive design element as the control variable, Energy performance analysis.

An Economic Analysis of the Hydrogen Station Enterprise Considering Dynamic Utilization (동적 이용률을 고려한 수소충전소 사업의 경제성 분석)

  • GIM, BONGJIN
    • Transactions of the Korean hydrogen and new energy society
    • /
    • v.28 no.1
    • /
    • pp.47-55
    • /
    • 2017
  • This paper deals with the after-tax economic feasibility analysis of the hydrogen fueling station considering dynamic utilization. We selected an off-site hydrogen station in which the hydrogen is supplied by a central by-product hydrogen plant as a case study. Also, we made some sensitivity analysis by changing input factors such as the discount rate, the hydrogen station construction cost, the hydrogen demand and the hydrogen sale price. As a result, the hydrogen station will not be economical in 2020 due to the relatively high price of the hydrogen station construction cost and the low price of hydrogen sale price. In order to realize the economic feasibility of the hydrogen station in the early stage of the hydrogen economy, the subsidies on the annual operating cost as well as the construction cost are needed.