• 제목/요약/키워드: Construction Site management

검색결과 1,467건 처리시간 0.038초

THE EFFICIENT ESTIMATE OF ENVIRONMENTAL MANAGEMENT COSTS IN THE CONSTRUCTION SITES

  • Hyuk Moon;Sung-Jin Kim;Jae-Jun Kim
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.437-446
    • /
    • 2005
  • Recently as people's values are changing from development phase into running stage after quality of life, so that the needs of environmentally friendly construction are gradually increasing. Also populace discontent about the pollution during construction process such as the noise and vibration caused by construction machinery is increasing. Even though it is impossible to eliminate the construction pollution fully, it is necessary to make efforts to reduce construction pollution to a minimum. In terms of construction site operating, the first possible step for solving these matters directly is that the necessary sum of expenses must be secured as the environmental management costs in the conceptual phase. However, in fact, the environmental management costs have not been secured in the budget. Generally it is the major reason not arising proper activities to prevent the pollution in the construction site. The purpose of this research is to suggest the efficient budgeting method regarding Environmental management costs to ensure the necessary sum of environmental management expenses. To provide an efficient budgeting method, interviews with the person in charge of environment management was conducted. 78 construction sites was surveyed and environmental management costs were analyzed through their historical data from the survey. According to the results of analysis, the ratio of environmental management costs is revealed 0.45% of construction cost as average comparing 0.2% of legal limit. And usually the environmental management cost was appropriated into the safety management budget. So it is needed to isolate environmental management budget securely and modify the ratio of Environmental conservation Costs in Construction Technology Management Act.

  • PDF

현장조건과 사고사례를 반영한 건설사업 근로자의 정량화된 위험도 예측 프로세스 개발 (Development of a Quantified Risk Prediction Process for Workers in Construction Projects ConsideringSite Conditions and Accident Cases)

  • 정창훈;장지영;박상원;한승우
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2019년도 추계 학술논문 발표대회
    • /
    • pp.94-95
    • /
    • 2019
  • Recently, the importance of prevention has emerged for the management of construction safety accidents.. Accordingly, this study collects and quantifies various risk factors at the construction site to represent them as direct risks and to create a predictive process for prevention in advance. These risk figures can be used as comprehensive safety figures to reflect current site conditions and past accidentt cases. The prevention of industrial accidents is managed in advance through the development of applications thatt quantify and predict the risks of individuals working at construction sites. The purpose of the project is to reduce industrial accidents in the construction industry by supporting safety management of site managers and workers.

  • PDF

ENHANCEMENT OF AVAILABILITY OF 4D SIMULATION BASED ON BUILDING INFORMATION MODEL TECHNOLOGY

  • Jong Jin Park;Eon Yong Kim;Hyun Cho;Han Jong Jun
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.579-586
    • /
    • 2009
  • 4D simulation integrates the 3 dimensional model of a building with the construction schedule, and it leads to the possibility of virtually checking the construction process and the building itself in advance. However, the existing problem of 4D simulation is the difference between the demands of architects, engineers, and construction site workers in 4D simulation. This study suggests the possible way to enhance the availability of 4D simulation, considering more the practical demands from the construction site. In order to conduct this study, we build a 3D BIM model of a business-residential complex and link the model with the pre-defined construction schedule in order to make a 4D simulation. This study concludes with the optimized 4D simulation methodology based on BIM model considering the demands in perspective of the construction site. It would contribute to the harmonic collaboration among architects, engineers, and labors in the construction site when using 4D simulation based on BIM model.

  • PDF

복합공종 MEP 천정 선조립 공법 사례조사를 통한 단계별 중점관리사항 도출 (Deriving Critical Management Factors based on Case Studies of Multi-trade MEP Ceiling Rack Prefabrication)

  • 이동민;장세준
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2015년도 추계 학술논문 발표대회
    • /
    • pp.76-77
    • /
    • 2015
  • In construction industry, management of construction factors such as cost, schedule, quality and safety is the most important key for delivering successful projects. According to the Smart Market Report, a magazine specialized in construction industry, recently said 'Off-site Prefabrication' is a significant trend related with construction productivity in global construction industry. It is a kind of practice shift from On-site to Off-site. A lot of general contractors in oversea have been using 'Multi-trade MEP Ceiling Rack Prefabrication' method for getting benefits such as decreased cost & schedule and increased labor productivity. Thus, in this paper, critical management factors at each phase from design to installation was derived by researching case studies. Forwardly, it can be a basic guideline for applying Multi-trade MEP Ceiling Rack Prefabrication in Korea construction industry.

  • PDF

건설안전 분야 평가항목에 대한 연구 -국내 건설공사현장을 중심으로- (Research on construction safety assessment topic areas -Focusing on domestic construction site-)

  • 안광용;강경식
    • 대한안전경영과학회지
    • /
    • 제17권4호
    • /
    • pp.1-12
    • /
    • 2015
  • Recent construction site large disaster occurs in, even normal disaster not be reduced, the efforts of pre-disaster prevention for this is also a need to study the evaluation index. By comprehensive examination zero reform the current lowest bid system has included the social responsibility index is scheduled, objective and quantitative evaluation indicators making construction safety areas that are included in the item of social responsibility is required ing. In this study, the construction, in order to prevent disasters, efforts pre disaster prevention be presented metrics in the construction safety in the field of comprehensive examination system and the evaluation index, it is intended to examine the evaluation items for the evaluation indices.

학교 건축물 내진보강 시공현장 관리를 위한 가이드라인 개발 및 적용에 관한 연구 (Development and Application of Guideline for Construction Management of School Building Seismic Retrofit)

  • 황은아;이병호;박구병
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2020년도 봄 학술논문 발표대회
    • /
    • pp.36-37
    • /
    • 2020
  • The government seismic retrofit project for educational facilities is progressing more actively due to the 2018 Pohang earthquake. It is most important that seismic retrofit constructions are conformed to seismic design to achieve the desired purpose of the project as reduce direct damage caused by earthquake. However, the construction supervision system is not mandatory for the retrofit construction site of small buildings including school buildings according to applicable laws and regulations. The purpose of this study was to develop a guide for constructions management of school building seismic retrofit. In order to achieve this goal, the survey on the construction site was conducted and various problems related to the construction site of school building seismic retrofit was derived Additionally, the systematic checklist was presented according to the user and seismic reinforcement method.

  • PDF

Hazard Recognition and Construction Safety Training Efficacy using Interactive Virtual Reality (VR)

  • Saiyad, Meeranali;Rybkowski, Zofia K.;Suermann, Patrick;Dixit, Manish;Luhan, Gregory;Shanbari, Hamzah
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.1209-1216
    • /
    • 2022
  • The majority of construction site incidents occur due to a lack of hazard awareness among workers on job sites. This lack of awareness is despite mandatory construction safety training, typically in the form of written content (safety manuals) or of images depicting hazards. To reduce job-site injuries and fatalities, general contractors have started adopting Virtual Reality (VR) to impart safety training to job site personnel. VR safety training can take the form of an immersive simulation comprising potential safety hazards intentionally embedded into a virtual job site; users are required to identify these hazards within a specified time frame with the expectation that they will be more adept at recognizing hazards on an actual job-site, resulting in fewer accidents. This research study seeks to identify the actual impacts of VR on construction safety awareness among participants. The research addresses the following question: Does VR improve hazard recognition awareness? The primary objective is to evaluate participants' performance of past construction safety awareness against present construction safety awareness after receiving VR training. Participants were asked to complete a multiple-choice Qualtrics™ questionnaire. The results of the study showed a statistically significant knowledge gain advantage with respect to hazard recognition and construction safety awareness with the use of interactive, immersive VR over a more conventional and passive safety training method.

  • PDF

건설현장 안전사고 빅 데이터 기반 작업자별 프로파일 분석 (Profiling of Workers based on Safety Accident Big Data in Construction Site)

  • 강성원;이기석;유위성;신윤석
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2021년도 봄 학술논문 발표대회
    • /
    • pp.247-248
    • /
    • 2021
  • Recently, the government is pursuing to reduce the serious accidents in most industries, including the construction industry, by enacting laws on punishment. The accident rate tends to be depended on the size and type of construction sites, and the accidents occur frequently due to inadequate implementation of safety management system and management standards, especially, in small and medium-sized sites. This study has performed the profiling of 265,000 accident cases on construction sites by attribute analysis such as the ratio of days lost to work, and pattern of days lost to work compared to the size of the construction. It turned out that the proportion of accident cases was high mainly in small-scale construction sites, and long-term labor losses occurred. Shortly, it is necessary to establish an institutional standard for applying a realistic safety management cost calculation and management system centered on small-scale sites. Therefore, this study is expected to be used as fundamental data or guideline for developing a customized safety management and accident prevention system for a worker reflecting the conditions of a construction site in the future.

  • PDF

키워드 빈도분석을 통한 OSC (Off-Site Construction) 프로젝트의 성공요인 고찰 - 해외연구 문헌고찰을 중심으로 - (A Study on the Critical Success Factors of Off-Site Construction through Keyword Frequency Analysis - A Literature Review of Overseas Research -)

  • 정서영;유정호
    • 한국건설관리학회논문집
    • /
    • 제22권1호
    • /
    • pp.13-26
    • /
    • 2021
  • 국내 OSC가 활성화되기 위해서는 설계 및 엔지니어링, 공장제조, 현장조립 등 각 단계별로 적용되는 기술의 혁신도 중요하지만, 기존 건설 생산방식과 차별화되는 관리 및 운영방식의 개발도 필요하다. 하지만, 현재 국내에서 진행되고 있는 OSC 관련 연구는 공법 개발과 같은 기술개발 측면의 연구가 주를 이루며, OSC 프로젝트의 성공을 위한 관리 방안 도출과 관련한 연구는 미진한 실정이다. 따라서, OSC 프로젝트의 핵심성공요인의 명확한 이해에 기반한 프로젝트 관리 방안 도출에 대한 연구가 요구되는 바이다. 이에 본 연구의 목적은 해외에서 선행된 OSC 프로젝트의 성공요인과 관련한 다수의 연구들을 분석하여 국내 OSC 프로젝트의 성공적 관리를 위한 핵심 시사점을 제시하는 것이다. 이를 통해 향후 국내에서 확산될 OSC 프로젝트의 성공 가능성 제고에 기여하고자 한다.

서중(暑中) 환경에서 현장 콘크리트 시험을 통한 재료 품질관리 방안 (A Study on Concrete Material Quality Management Based on Various Test of Construction Condition under Hot Weather Circumstance)

  • 박신
    • 한국건축시공학회지
    • /
    • 제5권3호
    • /
    • pp.91-99
    • /
    • 2005
  • It is required to study systematical on the concrete quality management to extend structure life because rebuilding effect is reducing under present condition of large sized and high stories structure. Concrete, which shows its intensity by hydrating action and a big change in quality according to hot weather and temperature, produces a lot of qualify problem under hot and cold weather Because of each specification and construction plan which does not have basic standard on site, concrete's quality is irregular and makes some defect. As a result, Daegu is turned out to be the longest area after investigating application period and days focused on 8 cities weather information about relationship between hot weather circumstance and construction environment. Therefore, we first surveyed the concrete material in the region and found out the problem of quality nanagement. Then figure out the way of solution. Moreover, we integrated concrete material quality management, which is applied differently to each site, to have equal quality and to reduce defect from construction site. And then, based on various test of construction condition and analysis of quality management item, we suggest effective concrete quality management to make concrete material construction standard guide and plan under hot weather.