• 제목/요약/키워드: Construction Sequence

검색결과 588건 처리시간 0.023초

VIRTUAL CONSTRUCTION OF TRANSFER FLOORS IN REINFORCED CONCRETE BUILDING USING BIM

  • Kwangho So;Bohwan Oh;Yongjik Lee;Hyungeun Lee;Taehun Ha
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.12-16
    • /
    • 2011
  • Building Information Modeling (BIM) is being widely spread in AEC industry worldwide and also in South Korea. Although the creation of digital model is better to be started at design stage, it can also improve the productivity of construction by simulating the actual construction process and environment. This paper presents application of BIM-based simulations related with design changes to transfer floors in 58-storey reinforced concrete office building. Transfer floor is not only a structurally important part of the building but also a challenging part of the actual construction in terms of sequence and period due to the complexity of the work. Preconstruction of rebar, mechanical, and plumbing is performed to review the construction drawings and to perform clash detection. Each item of application is evaluated for its effectiveness on actual construction and for the development potential.

  • PDF

Significant Progress in Construction Equipment of Super High-Rise Building

  • Zhang, Kun;Wang, Hui;Wang, Kaiqiang;Cui, Jian;Chen, Bo;Li, Di
    • 국제초고층학회논문집
    • /
    • 제7권3호
    • /
    • pp.243-253
    • /
    • 2018
  • The construction of rapid developing super high-rise buildings constantly faces great challenges and the innovation of construction equipment is a focus of these challenges. In this paper, three new inventions including the operation platform, tower crane and hoist are put forward around two of the most important issues of super high-rise building construction: vertical transportation and operation environment. Study background, composition of the equipment, working principles and key technologies are introduced in sequence. In the end, the paper summarizes the main problems in the further development of construction equipment.

시공단계별 영향을 고려한 터널 전력구의 유한요소해석 (Finite Element Analysis of Underground Electrical Power Cable Structures Considering the Effects of Construction Sequence)

  • 김선훈
    • 한국전산구조공학회논문집
    • /
    • 제26권2호
    • /
    • pp.147-155
    • /
    • 2013
  • 본 논문에서는 도심지 지하에 터널 전력구를 건설하는 경우 시공단계별 영향을 고려한 구조해석을 수행하였다. 해석대상의 도심지 지하에는 여러 종류의 다양한 라이프라인 구조체가 설치되어 있다. 터널전력구의 구조해석에는 지반체의 유한요소해석 프로그램인 MPDAP을 사용하였다. 라이프라인 구조체와 터널 전력구 사이의 이격거리가 가장 작은 대표적인 3개의 단면에 대하여 구조해석을 수행하였다. 터널의 굴착단계별 유한요소해석에서 발생되는 평형불균형성 문제는 평형섭동개념을 적용하여 해결하였다. 또한 터널 굴착에 의한 시간의존 변형의 영향은 하중분담율을 사용하여 시공단계별로 고려하였다. 본 연구에서 검토한 3개의 대표단면에서는 터널 전력구 주변 지반체에서 발생하는 최대변위값은 허용변위값이내를 보여주었다.

A Novel Fast Open-loop Phase Locking Scheme Based on Synchronous Reference Frame for Three-phase Non-ideal Power Grids

  • Xiong, Liansong;Zhuo, Fang;Wang, Feng;Liu, Xiaokang;Zhu, Minghua;Yi, Hao
    • Journal of Power Electronics
    • /
    • 제16권4호
    • /
    • pp.1513-1525
    • /
    • 2016
  • Rapid and accurate phase synchronization is critical for the reliable control of grid-tied inverters. However, the commonly used software phase-locked loop methods do not always satisfy the need for high-speed and accurate phase synchronization under severe grid imbalance conditions. To address this problem, this study develops a novel open-loop phase locking scheme based on a synchronous reference frame. The proposed scheme is characterized by remarkable response speed, high accuracy, and easy implementation. It comprises three functional cascaded blocks: fast orthogonal signal generation block, fast fundamental-frequency positive sequence component construction block, and fast phase calculation block. The developed virtual orthogonal signal generation method in the first block, which is characterized by noise immunity and high accuracy, can effectively avoid approximation errors and noise amplification in a wide range of sampling frequencies. In the second block, which is the foundation for achieving fast phase synchronization within 3 ms, the fundamental-frequency positive sequence components of unsymmetrical grid voltages can be achieved with the developed orthogonal signal construction strategy and the symmetrical component method. The real-time grid phase can be consequently obtained in the third block, which is free from self-tuning closed-loop control and thus improves the dynamic performance of the proposed scheme. The proposed scheme is adaptive to severe unsymmetrical grid voltages with sudden changes in magnitude, phase, and/or frequency. Moreover, this scheme is able to eliminate phase errors induced by harmonics and random noise. The validity and utility of the proposed scheme are verified by the experimental results.

Correlation Analysis between Regulatory Sequence Motifs and Expression Profiles by Kernel CCA

  • Rhee, Je-Keun;Joung, Je-Gun;Chang, Jeong-Ho;Zhang, Byoung-Tak
    • 한국생물정보학회:학술대회논문집
    • /
    • 한국생물정보시스템생물학회 2005년도 BIOINFO 2005
    • /
    • pp.63-68
    • /
    • 2005
  • Transcription factors regulate gene expression by binding to gene upstream region. Each transcription factor has the specific binding site in promoter region. So the analysis of gene upstream sequence is necessary for understanding regulatory mechanism of genes, under a plausible idea that assumption that DNA sequence motif profiles are closely related to gene expression behaviors of the corresponding genes. Here, we present an effective approach to the analysis of the relation between gene expression profiles and gene upstream sequences on the basis of kernel canonical correlation analysis (kernel CCA). Kernel CCA is a useful method for finding relationships underlying between two different data sets. In the application to a yeast cell cycle data set, it is shown that gene upstream sequence profile is closely related to gene expression patterns in terms of canonical correlation scores. By the further analysis of the contributing values or weights of sequence motifs in the construction of a pair of sequence motif profiles and expression profiles, we show that the proposed method can identify significant DNA sequence motifs involved with some specific gene expression patterns, including some well known motifs and those putative, in the process of the yeast cell cycle.

  • PDF

복수적분 시구간 직렬탐색 시스템에서 부분 상관기를 이용한 Kronecker 부호의 특성 분석 (Analysis of Kronecker Sequence with Partial-Period Correlation in a Multiple-dwell Serical Serarch System)

  • 임연주;박상규
    • 한국통신학회논문지
    • /
    • 제25권8B호
    • /
    • pp.1333-1340
    • /
    • 2000
  • 본 논문에서는 고속의 초기동기가 가능한 Kronecker 부호를 DS/CDMA 시스템의 확산부호로 하여 패킷 무선 데이터 통신에서의 사용을 위한 타당성을 보인다 먼저 Kronecker 부호의 생성방법 상관특성을 보여 대체적인 부호의 특성을 밝히고 부분 상관기를 이용할 수 있음을 보인다 더 나아가 PN 부호와 같은 평균 초기동기획득 시간을 가질 때의 Kronecker 부호의 오경보 확률과 실패 확률을 구하여 Kronecker 부호가 PN 부호보다 더 높은 동기 확률을 가짐을 보임으로써 패킷 통신에서 Kronecker 부호를 사용할 수 있는 가능성을 확인한다.

  • PDF

Reshoring effects on deflections of multi-shored flat plate systems under construction

  • Kang, Su-Min;Eom, Tae-Sung;Kim, Jae-Yo
    • Structural Engineering and Mechanics
    • /
    • 제45권4호
    • /
    • pp.455-470
    • /
    • 2013
  • RC flat plates that have no flexural stiffness by boundary beams may be governed by a serviceability as well as a strength condition. A construction sequence and its impact on the distributions of construction loads among slabs tied by shores are decisive factors influencing immediate and long term performances of flat plate. Over-loading and tensile cracking in early-aged slabs significantly increase the deflection of a flat plate system under construction. A reshoring work may be helpful in reducing slab deflections by controlling the vertical distributions of construction loads in a multi-shored flat plate system. In this study, a change of construction loads by reshoring works and its effects on deflections of flat plate systems under construction are analyzed. The slab construction loads with various reshoring schemes are defined by a simplified method, and the practical calculation of slab deflections with considering construction sequences and concrete cracking effects is applied. From parametric studies, the reshoring works are verified to reduce construction loads and slab deflections.

Realized Value Creation; New Construction in Constrained Urban In-fill Sites

  • Hadley, Nathaniel C.;Thornton, Charles H.
    • 국제초고층학회논문집
    • /
    • 제7권1호
    • /
    • pp.33-46
    • /
    • 2018
  • The Case Study prepared by PCPA and Lift Group will identify a growing development problem in urban areas; high value project sites that are restrictive in size or "tight" are underutilized and underdeveloped. In an effort to remedy this problem, our team will evaluate a design program through the lens of both conventional construction and Core Cantilever Construction. It is also important to differentiate between Core Cantilever construction and the plagued "Lift Slab" construction method as they may be confused, due to the top down construction sequence. This article will demonstrate that constraints inherent to conventional construction techniques prohibit economically viable development of these project sites, while Core Cantilever construction methods increase the projects value by reducing construction timelines and increasing the useable floor area.