• Title/Summary/Keyword: Construction Schedule

Search Result 755, Processing Time 0.026 seconds

Deriving Critical Management Factors based on Case Studies of Multi-trade MEP Ceiling Rack Prefabrication (복합공종 MEP 천정 선조립 공법 사례조사를 통한 단계별 중점관리사항 도출)

  • Lee, Dongmin;Jang, Sejun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.76-77
    • /
    • 2015
  • In construction industry, management of construction factors such as cost, schedule, quality and safety is the most important key for delivering successful projects. According to the Smart Market Report, a magazine specialized in construction industry, recently said 'Off-site Prefabrication' is a significant trend related with construction productivity in global construction industry. It is a kind of practice shift from On-site to Off-site. A lot of general contractors in oversea have been using 'Multi-trade MEP Ceiling Rack Prefabrication' method for getting benefits such as decreased cost & schedule and increased labor productivity. Thus, in this paper, critical management factors at each phase from design to installation was derived by researching case studies. Forwardly, it can be a basic guideline for applying Multi-trade MEP Ceiling Rack Prefabrication in Korea construction industry.

  • PDF

Work Management Model to Integrate Schedule and Bill of Quantit (산출내역서.공정 통합관리 모형 구축에 관한 연구)

  • 박홍태;박찬정
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2002.11a
    • /
    • pp.123-131
    • /
    • 2002
  • Recently our government operates earned value management system (EVMS) for improving work management system of the construction projects over specific scale. The EVMS is based on the integrated management between construction cost and schedule, the existing systems, however, are focused on the cost management by using wort quantity. This study suggests a work management mode1 to integrate construction cost with activity information. The model introduces a work task concept as a tool that can connect construction cost to activity information. The suggested model in this study is verified by using actual data for the applicability to practical construction projects.

  • PDF

Structural Work Duration Estimation and Analysis of Tower-Type Residential Construction Project

  • Yun, Seok Heon;Kim, Sang Chul
    • Architectural research
    • /
    • v.14 no.3
    • /
    • pp.109-116
    • /
    • 2012
  • In order to shorten construction duration in high-rise project, construction company tried to make various system method toward simplifying construction method and shortening construction duration. Though high-rise tower-type residential project are growing, there are few case study. Then, the data for preliminary schedule planning in high-rise tower-type residential project are rare. This purpose of research shows construction method in structural work in high-rise tower-type residential project, suggests schedule planning in structural work through case studies. The structural work in high-rise tower-type residential project was divided 1) completion of form in lower part and 2) the typical floor under penthouse. The statistical analysis were done in two parts, the data from analysis were used in simulation. Finally, researcher confirmed the difference between real construction duration and the figure from simulation. The results shows that the more construction duration is long, the less ACS's cost is low. It means the effectiveness is increasing in ACS, if the floor number is high.

Work Management Model to Integrate Schedule and Bill of Quantity (산출내역서.공정 통합관리 모형 구축에 관한 연구)

  • Park, Hong-Tae;Park, Chan-Jeong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.2 no.4
    • /
    • pp.153-161
    • /
    • 2002
  • Recently our government operates earned value management system (EVMS) for improving work management system of the construction projects over specific scale. The EVMS is based on the integrated management between construction cost and schedule. the existing systems, however, are focused on the cost management by using work quantity. This study suggests a work management model to integrate construction cost with activity information. The model introduces a work task concept as a tool that can connect construction rest to activity information. The suggested model in this study is verified by using actual data for the applicability to practical construction projects.

Simplified Methodology to Generate 2D/3D Object in 4D system for Civil Engineering Projects (토목시설물 4D구현을 위한 2D/3D 객체 생성 간편화 기법)

  • Lee Syeung-Youl;Lee Yong-Soo;Kim Chang-Hak;Kang Leen-Seok
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.585-588
    • /
    • 2003
  • This study attempts to develop a skeleton model to link construction schedule and 3D object for drawings in 4D system. Generally, the construction schedule and 3D object can be linked in 4D system by imported files which are made in specific S/Ws such as CAD S/W and scheduling S/W. Those methods have a difficulties for operating 4D data because extra work needs to link 4D data for each activity. This study develops a 4D model which the 4D data can be self-generated within the system. The suggested model can reduce the initial input data for new project by integrating schedule and 3D object in 4D system.

  • PDF

Analysis of Boundary Conditions for Activities' Relationships in Linear Scheduling Model (선형 공정계획 모델의 액티비티 관계의 경계조건 분석)

  • Ryu, Han-Guk;Kim, Tae-Hui
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.1
    • /
    • pp.23-32
    • /
    • 2011
  • Domestic leading construction companies has been establishing and performing TACT scheduling method, similar to linear scheduling model such as line of balance and repetitive schedule, and etc. in which repetitive construction works are involved like high-rise building. Linear scheduling model has been researched as a visual scheduling method presenting the work space and time information. Likewise scheduling constraints of CPM network such as finish-to-finish, start-to-start, finish-to-start, start-to-start, linear scheduling model also has the relationships constraints, namely boundary conditions, between activities. It is especially necessary to define the boundary conditions of the activities' relationships in order to apply the linear scheduling model to be compatible with the network schedule. Therefore, this research considers the boundary conditions between activities for establishing the linear scheduling model. This paper also applies the proposed boundary conditions to TACT schedule and then deduces the main considerations in order to establish and perform TACT schedule.

IMPROVING THE USABILITY OF STOCHASTIC SIMULATION BASED SCHEDULING SYSTEM

  • Tae-Hyun Bae;Ryul-Hee Kim;Kyu-Yeol Song;Dong-Eun Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.393-399
    • /
    • 2009
  • This paper introduces an automated tool named Advanced Stochastic Schedule Simulation System (AS4). The system automatically integrates CPM schedule data exported from Primavera Project Planner (P3) and historical activity duration data obtained from a project data warehouse, computes the best fit probability distribution functions (PDFs) of historical activity durations, assigns the PDFs identified to respective activities, computes the optimum number of simulation runs, simulates the schedule network for the optimum number of simulation runs, and estimates the best fit PDF of project completion times (PCTs). AS4 improves the reliability of simulation-based scheduling by effectively dealing with the uncertainties of the activities' durations, increases the usability of the schedule data obtained from commercial CPM software, and effectively handles the variability of the PCTs by finding the best fit PDF of PCTs. It is designed as an easy-to-use computer tool programmed in MATLAB. AS4 encourages the use of simulation-based scheduling because it is simple to use, it simplifies the tedious and burdensome process involved in finding the PDFs of the many activities' durations and in assigning the PDFs to the many activities of a new network under modeling, and it does away with the normality assumptions used by most simulation-based scheduling systems in modeling PCTs.

  • PDF

Usability Improvement of BIM for Construction Projects Using Active BIM Functions (능동형 BIM 체계에 의한 토목 및 건축분야 BIM 활용성 개선 연구)

  • Kang, Leen-Seok;Moon, Hyun-Seok;Kim, Hyeon-Seung;Kwak, Joong-Min
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.5
    • /
    • pp.74-83
    • /
    • 2013
  • Most current BIM systems are focused on the visual information of work status in the design and construction stages. In a passive BIM system, 3D CAD tool can visualize the interference elements of design drawings, however, it cannot suggest a solution to solve the interference status. And 4D CAD tool in the construction stage can simulate the appearance of each activity by construction schedule, however, it cannot suggest an optimized schedule plan considering specified schedule condition of the project. Recently, many organizations need BIM solutions that can improve the work status beyond the level of simple visual information from BIM system. Active BIM system can provide the solutions to the project manager. This study suggests active BIM functions for the solutions and attempts to develop a 4D CAD engine to validate the usability of the functions.

Construction Cost-Schedule Integration Management Methodolgy by using Progress Integration Unit (성과측정유닛을 활용한 건설 비용 - 일정 통합관리 방안)

  • Kang, Namhee;Choi, Jaehyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.3
    • /
    • pp.42-51
    • /
    • 2017
  • Measuring and evaluating project progress and performance are the key element of the construction project success. Construction progress is typically measured quantitatively by evaluating cost and time allocated to the project deliverable, and thus properly integrating cost and time is essential to the project management. This research was performed to propose an alternative methodology to integrate the cost and time and provide a framework for the progress measurement. The researchers developed a typical work process for the cost and schedule planning and also developed an alternative cost-schedule integration method by using progress integration units (PIU). A discipline of a construction phase served as a common level for WBS and CBS integration, so the PIUs'were defined under discipline. A case study project was selected to validate the developed methodology. The result showed the proposed method improved efficiency of cost and time integration. The result also showed the excluding material for the progress measurement purpose significantly reduced the bias of progress measurement.

A Study on developing WBS based QDBS(Quantity Database System) for the schedule and the cost data integration for road construction project (도로공사의 공정 및 공사비 연계활용을 위한 디지털 수량산출정보시스템(QDBS) 개발 연구)

  • Yun, Seok-Heon;Kim, Seong-Sig
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.4
    • /
    • pp.119-127
    • /
    • 2007
  • Cost and Schedule is the most important information, and how efficiently manage this information is the key issue for Construction Project Management. Domestically, systematic scheduling method such as CPM network is not only used widely but integration of time and cost information also is. In order to effectively integrate and use the time and cost information, it is suggested that WBS(Work Breakdown Structure) based QDB(Quantity Database) should be generated from the design phase and, WBS and QDB related system tool should be supported. It could be helpful to relate and integrate other construction project information.