• Title/Summary/Keyword: Construction Regulation

Search Result 576, Processing Time 0.026 seconds

A Study on the Regulation for Mental Healthcare Facility and Delivery System in China (중국의 정신의료시설 및 지원체계에 관한 법제도 연구)

  • Gao, Wen Mei;Yun, Woo Yong;Chai, Choul Gyun
    • Journal of The Korea Institute of Healthcare Architecture
    • /
    • v.24 no.1
    • /
    • pp.7-14
    • /
    • 2018
  • Purpose: This study analyzes mental healthcare delivery services and types of facilities, the status of installation and operation, and planning standard. The purpose of the study is to propose a basic data for the performance of related research and work tasks, along with an understanding of the Chinese mental healthcare facility type and support system. Furthermore, it will show a lack of current function management as the changes of mental health concept and demand for services increases, and it is intended to provide implications for the construction of mental health facilities. Methods: This study was conducted by a research on law and regulation of China's mental healthcare delivery service system and mental healthcare facility. The analyzed data are the national standard GB, the optional national standard GB/T, the building construction standard JGJ, and the report issued by the Health Planning and Development Committee. Results: At present mental healthcare facility construction in China is in the period of rapid development and it exposes the layout of medical facilities, which is not currently reasonable and the service does not reach the designated position and so on. Overall, it requires more detailed guidelines to enhance the quality of mental healthcare service. Implications: It is expected that the research of this paper will provide effective reference for future research on Chinese Mental healthcare system and facilities, and can promote construction of Chinese mental healthcare facility theory in perfect condition.

An Improvement Plan of Contract Price Adjustment through the Problem Analysis of the Current Price Escalation Regulation in Construction Projects (현행 건설공사 물가변동 제도의 문제점 분석을 통한 계약금액조정 개선방안)

  • Park, Yang-Ho;Kown, Beom-Jun;Kim, Yong-Su
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.435-439
    • /
    • 2006
  • The purposes of study is to propose a new method contract price adjustment in construction projects. The research method of this study includes a case analysis and questionnaire survey. The results of this study are as follows: 1) For improvement method of contract amount adjustment, enactment for legislation pertaining to computation methods such as military's organization through total unit cost, and price flexibility computation at the point of design modification were presented. 2) Arithmetic formulas for cases in which volume is deleted or modified below the price flexibility exemption amount or in which there is no change to quantity, at the occurrence of design modification resulting from price flexibility, were proposed.

  • PDF

System Improvement for Application and Diffusion of Earthwork Surveying Automation Technology (토공측량 자동화 기술의 적용 활성화를 위한 제도개선 방안)

  • Lee, Du-Heon;Park, Jae-Woo
    • The Journal of the Korea Contents Association
    • /
    • v.18 no.6
    • /
    • pp.303-313
    • /
    • 2018
  • The purpose of this study is digitalization of earthwork such as development of 3D terrain analysis platform using latest technologies including unmanned aerial vehicle and terrestrial laser scanner to ultimately achieve earthwork automation. It is necessary to develop related element technologies and to establish regulations so that it can be applied to the domestic construction projects. As a result of pilot project about the earthwork surveying automation technology, it was confirmed that information such as terrain coordinates, soil, boring, and excavation volume is acquired smoothly. In this paper, we investigate related regulations and manuals in Japan and propose the improvement plan of domestic regulation. We plan to study regulations from early to final construction stage, combine with the 'regulation for public surveying', and improve the regulations in detail.

Preliminary Study on the Factors Analysis of Change Order-Claim in Design-Build Project (설계시공일괄입찰공사의 설계변경 클레임요인 분석에 관한 기초 연구)

  • Ryu, Hyeok-Jun;Park, Byung-Ju;Yoo, Seung-Kyu;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.129-130
    • /
    • 2012
  • Although the order of Design-Build is being expanded by increasing construction scale and demanding hybrid function, the suitable regulation of the contracts is not settled. Design-Build is way by government because there are big construction of much government leading in contract relation high position occupy. So, case that prebendary's claim institution develops by litigation is very rare. But, recently Design-Build is magnified. So, these dispute factors is becoming visualization gradually. The contract system is needed to be consistent by international standard to deal with the problem. This study suggests the useful solutions in detail concerned with the main factor of change order claim by each Design-Build phases through practical sorting and analysis of the causes of Change Order-Claim.

  • PDF

Survey of Pile Foundation Construction Practice in Korea and Ground Vibration induced by Pile Driving (말뚝기초 시공현황 조사와 항타진동측정)

  • 홍성완;이원제
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1992.03a
    • /
    • pp.115-135
    • /
    • 1992
  • The current design and construction practice prevailing in Korea has been investigated. From the survey the various problems at hand have been listed up and evaluated. The objectives of this research is to propose the means to solve the current problems from the result of the investigation. At the same time, the propagation characteristics of vibration and noise due to construction. especially pile driving. have been studied and the current regulation that restrict these construction nuisance has been investigated by field measurement.

  • PDF

A Model for Efficient Construction Safety System (건설업 안전경영시스템모델 개발)

  • 채준석;갈원모;손기상
    • Journal of the Korea Safety Management & Science
    • /
    • v.3 no.2
    • /
    • pp.73-89
    • /
    • 2001
  • Safety management cost, US$ one thousand billion has been input to the construction area from 1995 to 2000 but the management quality is still in the developing country level. The above mentioned increase of accident rate are attributed to the generous code regulation, net fit to the sense, varying with time change, but the more fundamental reason of this is no practical construction safety management system, up to now. Hardware-orienting operation for the system could be a main reason of this problem. In this paper, we developed a model for efficent construction safety system. It was found from the case study that the model result in high efficient with low cost.

  • PDF

Study on the Safe Evacuation Management in a Power Supply Disturbed Emergency

  • Suzuki, Nobuyuki;OHASHI, Tsubasa;WHORLOW, James R
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.87-91
    • /
    • 2015
  • For construction projects it is imperative that site management gives the highest priority to planning safe site evacuation for all foreseeable emergencies, including earthquakes and typhoons which are often experienced in Japan. This is especially important and even more critical for high risk projects involving underground works, such as Tunneling & Pneumatic Caissons. Based on the safety regulation of underground works, a back-up power supply system must be provided during the construction period at all times. Often, fluorescent lamps with re-chargeable batteries are provided for infrequent emergency cases, however these have a questionable useable life span and thus need careful maintenance and periodical replacement. In this paper we focused on using the phosphorescence materials to indicate the evacuation direction. As a result, it was confirmed that the phosphorescence materials were considered useful in reducing panic and facilitating a controlled evacuation in the event of a total black-out due to power failure.

  • PDF

A linked data system framework for sharing construction defect information

  • Lee, Doyeop;Park, Chansik
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.232-235
    • /
    • 2015
  • Defect data contains experiential knowledge about specific work conditions. And the number of projects performed by a company is too limited for an individual to experience the various defects under the current complex construction environment. Therefore, in order to manage and prevent a reoccurrence of defects, a proper data feedback mechanism is required. However, most defect data are stored in unstructured ways, resulting in the fundamental problem of data utilization. In this paper, a new framework is proposed by using linked data technologies to improve defect data utilization. The target of this framework is to convert defect data to the ontology-based linked data format for sharing defect data from different data sources. To demonstrate it, some technical solutions are implemented by using real cases. The proposed approach can reduce data search time and improve the accuracy of search results as well. Moreover, the proposed approach can be applied to other domains that need to refer to external sources such as safety, specification, product, and regulation.

  • PDF

A Study on the Situation of Safety Management in Central African Construction Sites - Focusing on DR Congo and Rwanda -

  • Bitamba, Bauma Frigeant;An, Sung-Hoon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.4
    • /
    • pp.395-401
    • /
    • 2018
  • The Central African Region is known as one of the most troubled and unsafe regions in Africa. But more recently the Central African Region has been growing and developing, with many projects underway involving huge local and foreign construction companies. Despite this fact, workers in the Central African Region often encounter unsafe working conditions and must confront many kinds of hazards. Therefore, the aim of this study is to identify the safety management situation in Central African construction sites, by focusing on the countries of Rwanda and DR Congo. Through our research, it was found that the two countries studied in the Central African Region are very similar with regard to their safety management systems, with some exceptions. In addition, it was revealed that both these countries in the Central African Region had good safety performance. This study will help to illuminate the situation of safety systems on construction sites in the Central African Region, and can be used by companies advancing into the Central African Region's construction market.