• Title/Summary/Keyword: Construction Quality Management

Search Result 1,515, Processing Time 0.041 seconds

An Empirical Study on Top Management's Leadership in Construction Quality Management Activities and Construction Quality Management Performance (최고경영자의 리더십이 건설품질경영활동과 건설품질경영성과에 관한 실증연구)

  • Cho, Jin-Ho
    • Journal of Korean Society for Quality Management
    • /
    • v.45 no.3
    • /
    • pp.403-426
    • /
    • 2017
  • Purpose:?The purpose of this study is to analyze the causal relationship between top management 's leadership and construction quality management activities that affect construction management performance based on construction quality management. Methods:?As its method, the causal relationship between the leadership of top management and the key management factors of construction quality management activities affecting management performance is analyzed by using the structural equation model. The construction companies used in the analysis sample conducted surveys on companies that are conducting ISO, KOSHA, OHSAS, DQC, and so on. Results:?It was revealed that top management's leadership has a great influence on management performance and all management factors of construction quality management activities. However, safety management does not affect the management performance of construction quality management activities. And top management's leadership on management performance are explained by the mediating effect of cost, time, quality and communication among management factors of construction quality management activities. Conclusion:?In the previous study, the quality management activities and the ISO - based integrated total quality management system (TQM) applied in the manufacturing or service industries were presented as empirical results. However, this study presents the results of different studies by presenting empirical study results by selecting time, cost, quality, safety and communication as key management factors of quality management activities of construction companies through reviewing and analyzing previous studies in construction field.

A Study of Domestic Construction Quality Management Factor Analysis - (using Covariance Structure Model) (국내건설현장 품질경영 요인 분석에 관한 연구(공분산구조모델을 이용))

  • Kim Tae Sung;Koo Il Seob;Lim Nam Gyu
    • Journal of the Korea Safety Management & Science
    • /
    • v.7 no.3
    • /
    • pp.29-36
    • /
    • 2005
  • This research has been conducted in order to assess the effects on quality management factor of the construction sites. 30 companies abiding by the 'construction industry law' and 32 companies abiding by the 'housing construction promotion law' have been researched in areas of quality-management environment, quality-management understanding, quality-management education on construction field, quality-system and quality-improvement. This construction quality factors are to realized the anticipated results not only quality level's increasing, but also company's confidence, competitiveness. We were able to obtain participations of 62 questionnaire, and derived statistics by means of SPSS/PC version 10.0. In this study, we find the bottleneck factor for promotion and upgrade quality management factor of the construction sites and suggest a way out of difficulties.

A study on the Improvement for Organization Management of Small & Medium Construction Firms (중소건설업체의 조직관리 개선방안에 관한 연구)

  • Kim, Yong-Bum;Park, Gang-Sung
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2009.11a
    • /
    • pp.601-616
    • /
    • 2009
  • Small & Medium construction firms have been faced with demand of environmental changes. construction firms have been required to improve their structures to reinforce the competitiveness. so, these firms are making desperate efforts, which are reorganization, renovation, improvement. this study would be emphasized the Quality Management in construction work. For this, It must be supposed a plan to improve a construction organization. The Construction Firm would be executed Quality Management learning, leadership, understanding of Quality Management to construction workers.

  • PDF

A Study of Domestic Construction Quality Management Factor Analysis using Covariance Structure Model (공분산구조모델을 이용한 건설현장 품질경영 요인 분석)

  • Koo Il Seob;Kim Tae Sung;Lim Nam Gyu
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2005.05a
    • /
    • pp.467-475
    • /
    • 2005
  • This research has been conducted in order to assess the effects on quality management factor of the construction sites. 30 companies abiding by the 'construction industry law' and 32 companies abiding by the 'housing construction promotion law' have been researched in areas of quality-management environment, quality-management understanding, quality-management education on construction field, quality-system and quality-improvement. This construction quality factors are to realized the anticipated results not only quality level's increasing, but also company's confidence, competitiveness. We were able to obtain participations of 62 questionnaire, and derived statistics by means of SPSS/PC version 10.0. In this study, we find the bottleneck factor for promotion and upgrade quality management factor of the construction sites and suggest a way out of difficulties.

  • PDF

A Case Study on the Quality Management of Construction Site through PDCA Cycle (PDCA Cycle적용을 통한 건설현장 품질관리에 관한 사례연구)

  • Baik, In-Whee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.1
    • /
    • pp.49-56
    • /
    • 2008
  • According to the recent trends which are the diversity of customer requests and the multi-function of buildings, A construction company's business has converted from the producer-oriented approach to the consumer-oriented approach. Therefore, each construction company is continuously trying to improve the quality level as a way of corresponding to customer needs in these changing situations. The quality is one of the main management targets which judge the success of a project along with the schedule, the cost and the safety. As construction companies execute the quality management which they aimed at, it should be completed within the optimum schedule and the limit of the budget. Accordingly, the importance of the construction site management to complete a project is continuously increasing. The construction site management is the systematic method to perform the project goals such as the quality improvement, the cost saving and the safety management, which organically operate one another, by procuring the manpower, the material and the machine in the right time. Specially, as the construction industry has based on the construction site, the establish of systematic construction site management, which can effectively correspond sudden changes of the construction business environment, is essential to maximize the construction productivity. On top of that, the necessity of the quality management method is increasing to accommodate customer needs more spontaneously in the construction site. These endeavors could guarantee their competitive power.

A Study of Construction Quality Management System using QR code (QR코드를 활용한 품질경영시스템에 관한 연구)

  • Park, Sang-Min;Lim, Tae-Kyung;Lee, Dong-Eun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.137-139
    • /
    • 2012
  • This paper presents a system architecture and database of construction quality management system which encourages real time information tracking and monitoring. It improves the real time quality record tracking by using QR code technology in the project delivery. The advantages and issues relative to QR code and the database structures of the tracking system are presented. Conventional project scheduling system, operation modeling and analysis system, and quality management system are hybridized using QR code technology. The system improves project quality management by tracking the atomic tasks which consists of a construction process at the lowest level of construction hierarchy. It analyzes the quality records to determine the causes of abnormality and/or nonconformity. Using QR code technology, the construction quality management system may be more effective than the conventional one. It was confirmed that the quality management processes in construction project delivery can be more visible and controllable by integrating QR code technology, project scheduling system, and quality management system.

  • PDF

QUALITY MANAGEMENT OF ECOLOGICAL ENGINEERING

  • Ying-Mei Cheng;Been-Jyh Yu
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1216-1222
    • /
    • 2009
  • Ecological Engineering (EE) refers to all sustainable engineering that can reduce damage to ecosystems and that adopts ecology as a base and safety as an orientation in order to implement conservation of biodiversity and sustainable development. In short, EE attempts to safeguard the ecological environment while any essential construction projects proceed. EE encompasses many fields, including construction skills, ecosystem preservation, landscape, and even related cultures and so on. Such variety results in greater complexity of construction, and, consequently, indirectly increases the difficulty of construction quality control. The objective of our research is to explore a promising model for EE via an extensive literature survey. This model includes three principal stages: plan-design, construction, and maintenance, along with individual accompanying phases concerned with quality control and vital management. In this article, a river restoration example is adopted to describe in detail the critical points of quality control in the three stages (plan-design, construction, and maintenance) of the construction life cycle. This study proposes an integrated structure for quality management of EE to guarantee its quality and to enhance its core applications in order to achieve long-lasting preservation of the environment.

  • PDF

A Study for the Construction Conformity Assessment System According to the New Paradigm of Construction Management (건설관리 패러다임 전환에 따른 건설공사 품질관리 적합성평가 시스템 구축에 대한 연구)

  • Lee, Kab-Soon;Bae, Young-Ju
    • Journal of the Korea Safety Management & Science
    • /
    • v.19 no.1
    • /
    • pp.39-52
    • /
    • 2017
  • The scope of this study is the construction conformity assessment system according to the new paradigm of construction management To minimize the differences between domestic and international state, construction Conformity Assessment is subdivided into system certification and product certification. For the former, WASCON(Worldwide Assessment System of Construction Quality Maturity Stage) is applied. For the latter, AQUA(Advanced Quality Assessment System) was developed and adopted to model project for demonstration. Both systems are designed to enable quantified rating, integrated into PQCS(Project Quality Certification), which is an advanced project quality certification system. The construction work observing PQCS will gain quality score on its own quality certificate(Quality mark on construction itself or facilities is also available, if needed or preferred by customers). This Quality Rating System will inspire and encourage any related parties. PQCS score would let supplier/constructor recognize how much themselves are operating effectively and efficiently, offering them the opportunity of redeeming their weaknesses.

Developing an IFC-based database for construction quality evaluation

  • Xu, Zhao;Li, Bingjing;Li, Qiming
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.301-312
    • /
    • 2017
  • Quality evaluation and control represent increasingly important concerns for construction quality management. There is an evident need for a standard data model to be used as the basis for computer-aided quality management. This study focuses on how to realize evaluation of construction quality based on BIM and database technology. In this paper, the reinforced concrete main structure is taken as an example, and the BP neural network evaluation model is established by inquiring current construction quality acceptance specification and evaluation standard. Furthermore, IFC standard is extended to integrate quality evaluation information and realize the mapping of evaluation information in BIM model, contributing to the visualization and transfer sharing of evaluation information. Furthermore, the conceptual entity model is designed to build quality evaluation database, and this paper select MySQL workbench system to achieve the establishment of the database. This study is organized to realize the requirement of visualization and data integration on construction quality evaluation which makes it more effective, convenient, intuitive, easy to find quality problems and provide more comprehensive and reliable data for the quality management of construction enterprises and official construction administratiors.

  • PDF

Site Quality Evaluation Prototype for Building Deck-plate Construction

  • Shim, Young-Bo;Cho, Dong-Hyun;Koo, Kyo-Jin
    • Journal of the Korea Institute of Building Construction
    • /
    • v.13 no.1
    • /
    • pp.90-100
    • /
    • 2013
  • Deck-plates are widely used on construction sites, and have the advantage of enabling contractors to achieve a relatively uniform quality. But nevertheless, quality deviation in deck-plate construction can occur as the result of differences in site conditions and the experience of crew workers. In this study, the authors present a site quality evaluation prototype for building deck-plate construction. Through analyses of case studies and interviews with experts, standard quality check sheets and a quality management index were developed by estimating the importance of quality check items based on a Failure Mode and Effects Analysis (FMEA) method. The applicability and effectiveness of the prototype was evaluated through a case study and interviews with case participants. It was found that the prototype promoted an active quality management as a way of continuously improving quality management in deck-plate construction instead of passive quality inspection practice.