• Title/Summary/Keyword: Construction Process

Search Result 7,147, Processing Time 0.029 seconds

Suggestions for Sustainable Construction Project Management (지속가능한 건설사업관리를 위한 발전방안)

  • Lee, Seung-Hoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.11a
    • /
    • pp.240-241
    • /
    • 2021
  • For the sustainable development of the domestic construction project management field, each CM company should try to diversify in terms of service contract types and scope of work while having internationally competitive technical and service capabilities as follows. First, from the initiation of the service to the completion, the CMr should be able to establish and execute a plan to create specific outcomes. Second, CMr must have the capability to produce weekly or monthly cost, schedule, risk, and scope management reports. In addition, it should be possible to apply the cost plus sliding fee method or to systematically and continuously accumulate and process data generated during the construction process.

  • PDF

PRIVATE DEVELOPERS' UNDERSTANDING ON THE IMPLEMENTATION OF STRATEGIC PARTNERING IN THE MALAYSIAN CONSTRUCTION INDUSTRY

  • Faridah Muhamad Halil;Mohammad Fadhil Mohammad;Rohana Mahbub;Ani Saifuza Shukor
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.542-549
    • /
    • 2011
  • This research will attempt to reveal that private developers in the Malaysian construction industry have been practicing strategic partnering in their organizations. While the investigation was conducted using quantitative and qualitative approaches, this paper will only reveal results obtained from the questionnaire survey. Results from the questionnaire survey indicate that private developers in the Malaysian construction industry had implemented strategic partnering in their organizations. The elements of the partnering process, which are partnering formation, partnering application and partnering completion or reactivation were tested. The results show that all the elements of the partnering process have been exercised in their projects. Thus it can be surmised that strategic partnering has been practiced by private developers in the Malaysian construction industry.

  • PDF

A Study on the Improvement of Interoperability Construction Process (BIM 건설정보 상호운용성 개선에 관한 연구)

  • Oh, Jeong-Keun;Ha, Ran
    • Journal of KIBIM
    • /
    • v.4 no.2
    • /
    • pp.10-16
    • /
    • 2014
  • Interoperability in the BIM construction information is the information management technology, which allows user to control and effectively use construction's lots of information that occur and disappear through construction life cycle. And it is information interchange through accurate and rapid decision-making to get the participants' wanted value. In this study, we will present plan to improve productivity and quality through effective BIM operation. And we will present improvement plan after deduce existing process's problem.

Development of Construction Process Safety Information System Using Analytic Hierarchy Process (AHP를 활용한 건설공정 안전평가 정보시스템 개발)

  • Kim Min-Jun;Jo Jung-Hyun;Jun Hyun-Jeong;Lee Byung Gee
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2005.05a
    • /
    • pp.39-44
    • /
    • 2005
  • Process control and autonomous safety control by applying PSM(Process Safety Management) method using AHP(Analytic Hierarchy Process) and to development of PSIM(Process Safety Information Management) evaluation method in the construction. The reason why PSIM method should be quantitative and substantial progress is because it contributes Korean constructing companies to enhancing their safety control ability and to taking an equal stance just like developed countries, thereby strengthening their competitive edges.

  • PDF

Claim Management Process of General Contractors in South Korea

  • Seo, Wonkyoung;Kang, Youngcheol
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.207-215
    • /
    • 2020
  • The purpose of this study is to investigate the current status of claim management process of general contractors in South Korea. As the claim management becomes more important nowadays, maintaining the process for claim management systematically and consistently becomes more important as well. To improve the claim management process, it is necessary to diagnose the current status of claim management process so companies establish their targets for improvement. This study develops a survey to identify the current status of claim management process that major general contractors in South Korea have. Questions in the survey are classified into four categories including entitlement check, potential claim event check, time bar check, and tasks for substantiation. By conducting a series of statistical analyses with 94 survey data collected from employees working in the general contractor companies in South Korea, this study examines and analyzes their claim management process in terms of the several categories. It is expected that the results contribute to diagnosing how practitioners maintain their claim management, which will help them establish the direction of management enhancement.

  • PDF

Comparison of Phosphorus and Nitrogen Removal Characteristics between A2/O and Modified Phostrip Processes (A2/O공정과 수정 Phostrip공정과의 질소 및 인제거 특성비교)

  • Kim, Kwang-Soo;Kim, I-Tai
    • Journal of Korean Society on Water Environment
    • /
    • v.21 no.6
    • /
    • pp.664-668
    • /
    • 2005
  • An experimental study for the comparison of nitrogen and phosphorus removal efficiencies between $A^2/O$ and modified Phostrip (M-Phostrip process) were carried out with bench-scale reactors. In case of nitrogen removal efficiencies both of processes showed similar ones when influent organic loadings were high. However, M-phostrip process was more effective than $A^2/O$ at low organic loadings. This is why M-phostrip process consumes the whole mass of influent organics as a carbon sources for denitrification in anoxic reactor but the anoxic reactor of $A^2/O$ process utilizes the residual carbon followed by consumming a part of influent carbon for phosphorus release in anaerobic reactor. $A^2/O$ process required the influent COD/T-P and COD/TKN ratios were more than 56 and 10, respectively, to take place the phosphorus release in anaerobic process and phosphorus uptake in oxic process. However, the luxury uptake of phosphorus in M-phostrip process was not affected by influent COD/T-P and COD/TKN ratios and the adverse effect of nitrate in return sludge introduced to the p-stripper from the 2nd clarifier was not significant due to the configurational advantage of the p-stripper.

A Model for Optimization Process of Asbestos Dismantling Work Using Simulation (시뮬레이션을 이용한 석면 해체공사의 최적화 공정계획 모델)

  • Cho, Hyeong-Jun;Noh, Jae-Yun;Lee, Ho-Hyeon;Lee, Su-Min;Han, Seung-woo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.11a
    • /
    • pp.17-18
    • /
    • 2022
  • In Korea, asbestos removal has been actively carried out nationwide since 2015 when asbestos was completely banned as a first-class carcinogen. Since scattering dust generated in the process of removing asbestos causes fatal diseases such as asbestos lung disease and lung cancer, concerns are growing over the safety of construction workers and building users undergoing dismantling. For this reason, regulations on asbestos sites have been strengthened and prior studies on safety and risk assessment have been conducted, but research on actual site data collection and process planning is insufficient even though safety is reduced due to delay in site construction period. Therefore, it is necessary to analyze the work and delay factors of the asbestos dismantling process and develop an optimized process plan model for workers. This study is an initial step to develop an optimized process plan model that considers the safety and productivity of asbestos dismantling work, and aims to help establish an optimized process plan for asbestos dismantling process using website clone simulation.

  • PDF

Knowledge Structure for Cost Estimates Based on Standardized Cost Database (원가산정을 위한 표준분류체계 활용한 지식체계 개발)

  • Im, Haekyung;Kang, Namhee;Choi, Jaehyun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.235-236
    • /
    • 2016
  • The importance of construction management has been increasing due to the fact that complex construction projects blend several different industries depending on the traits of the construction. This research was conducted to search for a method to enhance efficiency in cost management of construction project and meet the need for reusability of accumulated construction information. The process of detailed estimation and methodology for using standard unit price information has been developed to strengthen the interoperability in cost information by utilizing a standard classification system. The concept of ontology is proposed as a method of connecting construction information based on a standard breakdown structure to increasing the connectivity of the cost information in the construction project. Therefore, construction information knowledge framework is developed in order to improve the efficiency of the detailed estimation work process.

  • PDF

A Study on the Evaluation System Construction of Fall Risk Section to Fall (건설현장의 추락위험개소 산출System에 관한 연구-건축공사 중심으로)

  • Gang, Yong-Tak
    • Journal of the Korea Construction Safety Engineering Association
    • /
    • s.36
    • /
    • pp.73-81
    • /
    • 2006
  • Construction fall accidents have been investigated by many researchers. Construction workers are prone to fall when elevations of the construction site is high. And falls are the most fatal accidents: it can be directly linked to the death. Construction fall accidents might be reduced by predetermining several areas which are highly probable to have fall accidents and by controlling such areas until the completion of the building construction. In this paper, a fall prevention system is suggested which can identify the areas where the focus on fall protection is perhaps most needed from the process characteristics. Main methodologies for this research are summarized as follows: 1. A data base on elements and types of falls is constructed from the data analysis of last 10 years fall accidents history. 2. Guideline is derived by identifying the highly probable areas of fall accidents with respect to the specific construction process. 3. Developed system is verified by applying the system to construction sites. 4. Finally a fall prevention system is suggested by utilizing the fall accidents data.

  • PDF

APPLICATION OF AHP IN IDENTIFYING CONSTRUCTION PRODUCTIVITY FACTORS

  • Ishwar Adhikari;Soo-Yong Kim;Young Dai Lee
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.667-671
    • /
    • 2005
  • Analytical hierarchy process (AHP) is a potential decision making method in management that can be used in project management as well. Lack of productivity is perhaps the number one problem confronting in the construction industry. There are numerous factors which affect the productivity of a construction project, so it is necessary to find out the critical factors giving birth to productivity. In this paper, construction productivity is taken as example for the demonstration of the AHP application to find out the critical productivity factor in which the Level 1 is taken as selection of critical productivity factor, Level 2 as construction parties and Level 3 as productivity factors group. The outcome of this study is beneficial to the entire constructional professionals for applying the AHP.

  • PDF