APPLICATION OF AHP IN IDENTIFYING CONSTRUCTION PRODUCTIVITY FACTORS

  • Ishwar Adhikari (Interdisciplinary Program of Construction Engineering and Management, Pukyong National Univeristy) ;
  • Soo-Yong Kim (Division of Construction Engineering, Pukyong National University) ;
  • Young Dai Lee (Division of Construction Engineering, Pukyong National University)
  • Published : 2005.10.16

Abstract

Analytical hierarchy process (AHP) is a potential decision making method in management that can be used in project management as well. Lack of productivity is perhaps the number one problem confronting in the construction industry. There are numerous factors which affect the productivity of a construction project, so it is necessary to find out the critical factors giving birth to productivity. In this paper, construction productivity is taken as example for the demonstration of the AHP application to find out the critical productivity factor in which the Level 1 is taken as selection of critical productivity factor, Level 2 as construction parties and Level 3 as productivity factors group. The outcome of this study is beneficial to the entire constructional professionals for applying the AHP.

Keywords