Critical Factors Causing Delay on State-Funded Construction Projects in Vietnam

  • Luu, Van Truong;Kim, Soo-Yong;Pham, Nguyen-The-Thanh;Nguyen, Thanh-Long;Nguyen, Tuan-Kiet
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.104-108
    • /
    • 2015
  • Delay on State-Funded Construction Projects (SFCPs) in Dong Thap - a province in Mekong Delta of Vietnam, as many provinces of Vietnam, have caused budget overrun through many recent years. The budget-overrun situations, in turn, have deepened the delay. Identifying critical factors affecting delay SFCPs plays a key role to mitigate negative impact of delay. 134/160 questionnaires were collected from personals working for project owners, consultants, supervisors and contractors in Dong Thap Province. Convenient sampling method was used. EFA was resulted in critical 04 factors with 20 variables caused delay in SFCPs, including: "Project technic, contractor's financial capacity and adjustment role of the government", "Regulation and Policy", "Mutual benefit support and concern between the government and residents", and "Disadvantage of construction site and weather season". Reliable measures to reduce delay on SFCPs are discussed to establish legal corridors to strictly controlling the process, consider mutual benefit between the government and its residents, and evaluating construction conditions. Those measures are considered could be applied in not only Dong Thap province, but most provinces of Vietnam as well.

  • PDF

IMPLEMENTATION OF TRL TOOLS TO KOREAN NATIONAL CONSTRUCTION AND TRANSPORTATION R&D PROJECTS FOR IMPROVING PRACTICAL USE

  • Namgyun Kim;Byungho An;Jaehong Choi;Hyunseok Lee;Sanghyuk Park;Yeasang Kim
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.608-615
    • /
    • 2013
  • The major countries including Korea extend the national investment on R&D and implement the business performance diffusion policy as the knowledge based competition age arrives recently. The necessity for risk management and systematic management system for R&D achievement have been appeared to prevent the failure as the R&D scale becomes larger as it was said. For this matter, the organization such as NASA and DoD in USA defines the Technology Readiness Level (TRL) as a quantitative accomplishment management index and utilize the Technology Readiness Assessment (TRA) system as a criterion. Such tool is evaluated as very effective in the R&D project purposed the practicalization. It is expected that the disadvantage of evaluation system which is oriented to the academic accomplishment in its contents of current research and to contribute greatly to the practicalization of outcomes when such technology readiness level concept is applied to Korean national construction and transportation R&D project. Accordingly, this study analyzed the concept of TRL·TRA, the characteristics and current evaluation management system of Korean national construction and transportation R&D project and suggested the construction and transportation R&D project TRL·TRA performance model to accomplish the practicalization purpose.

  • PDF

Improvement scheme of utilization of the results of the post-construction evaluation system (건설공사 사후평가 수행결과 활용도 개선 방안)

  • Lee, Du-Heon;Park, Jae-Woo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.6
    • /
    • pp.78-89
    • /
    • 2013
  • Post-evaluation system reflects the results of performing a public construction project in the future similar public construction projects to be utilized in the planning. However, the current system simply compares the expected values, such as demand, B/C ratio, cost of construction, construction period, with the actual values after the completion of construction. In addition, most public owner does not actively conduct the post-construction evaluation tasks, so that the evaluation results has not been returned to early stage of a construction project. In this study, status of the post-construction evaluation system is investigated by a survey of the public owner and the construction project evaluation system of the United States and Japan was analyzed. This paper presents the improvement scheme of utilization of the results of the post-construction evaluation system. Through improving the post-construction evaluation system, it is expected that public agencies would easily utilize the post-construction evaluation.

Multifunctional Administrative city, Innovation city, Enterprise city How to prospect the three leading strategic construction of balanced national development? ($\cdot$복도시$\cdot$혁신도시$\cdot$기업도시 건설 국가균형발전의 3대 전략사업 전망은 어떤가?)

  • Chung, Moo-Yong
    • Journal of the Korean Professional Engineers Association
    • /
    • v.39 no.1
    • /
    • pp.58-63
    • /
    • 2006
  • How the balanced national development policy will be propelled? We study for the vision of a construction of the three leading strategic business; Multifunctional Administrative city, Innovation city, Enterprise city. The balanced regional development of our counry promotes the development of the falling behind area and solves the inefficiency of over crowding from quantitative expansion of the Metropolitan area.

  • PDF

The Analysis of Routes and Construction Technologies in the Korean Grand Waterway (경부운하의 노선분석과 건설기술)

  • Jeong, Dong-Seok
    • Journal of the Korean Professional Engineers Association
    • /
    • v.41 no.2
    • /
    • pp.51-58
    • /
    • 2008
  • In this paper is described "the water resources policy, a new paradigm of water resources control. the characteristic of rainfall in Korea and the compatibility of a new water routes opening in natural river". Also the construction of the Korean grand waterway in the view of disaster prevention, flood control, irrigation and environment-friendly transportation is needed eventually. And I detail a routes of Korean grand waterway, using of a flood gate, supply of irrigation water. cruse duration, activating under developed region and economic efficiency.

  • PDF

A study on How to Improve the Work of Professional Landscape Construction in Preparation for the Reorganization of the Production System in the Construction Sector - Based on the Survey Results - (건설분야 생산체계 개편에 대비한 조경분야 전문공사업 업무 개선 방향 - 설문조사 결과를 중심으로 -)

  • Ahn, Myung June
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.52 no.3
    • /
    • pp.33-45
    • /
    • 2024
  • The government is promoting the reorganization of the construction indusrty under the theme of reorganizing the production system. However, it has been pointed out that this is contrary to the increasingly specialized and technical skills of the landscaping field. Therefore, it is urgent to respond to the construction industry integration policy and improve an appropriate work system and the content of the landscape field. Therefore, this study investigated the intention of the industry to reorganize the production system and the production structure of the landscape field, so that it can be used as a reference for future changes. As a result of the survey, 1) the perception of the reorganization policy is a highly requesting step-by-step promotion that reflects the industry's will, 2) the system is divided into generalization and specialization and is highly opposed to integration, 3) appropriate design and construction costs are the most important directions for improving landscape construction projects, and 4) reestablishing the relationship with related civil engineering works is important for improving detailed construction types. Overall, it was pointed out that the current specialized landscape construction does not sufficiently reflect the changing landscape business and is only appropriate for subcontractors in other industries. Therefore, it is necessary to promote policies that reflect this. In the long run, it is urgent to establish the status of landscape construction as an independent object, and it is necessary to supplement the legal system and change the industry accordingly.

Improvement Scheme on Green Construction Cost & Benefit through Analyzing Trends and Case Studies (해외사례조사를 통한 녹색건설 비용 및 편익 정보 체계의 개선 방향)

  • Kim, Won-Tae;Choi, Seok-In;Chang, Chul-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.5
    • /
    • pp.44-54
    • /
    • 2013
  • As a green construction is a world-wide hot issue, Korean government is also putting forth a multilateral effort into reducing energy usage with setting aggressive goal under green growth policy. It is essential to analyse cost raised from designing and building green construction and benefit derived from the built facility for the sustainable green construction. However, compared to advanced countries in terms of green construction, there is lack of data and a systematic way for data collection and analysis in Korea. Without analyzing the cost-benefit of green construction, investors will hesitate to put his/her money into green construction and we can not expect its growth in construction industry. In this paper, cost of green construction was defined and categorized. Through case studies and various reports on cost-benefit analysis in advanced green construction countries, problems in terms of data collection and analysis in domestic green construction sector and improvement ways were suggested. The results of this study will contribute in classification of cost and benefit of green construction, data collection in systematic way, and increasing the feasibility of green construction via appropriate analysis on cost-benefit of green construction.

Development of PC modular Construction System using 3D Infill (3D Infill을 활용한 PC모듈러 시공시스템 개발)

  • Chung, Joo-Soo;Lim, Seok-Ho;Heo, Byung-Wook;Chae, Ji-Yong;Park, Jin-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.06a
    • /
    • pp.14-15
    • /
    • 2020
  • The need for off-site construction has increased in the construction industry in Korea in recent years due to the enforcement of the 52-hour workweek, the increasing age of workers on construction sites, the deepening dependence on overseas workers, and the stagnation of productivity in the construction industry. Thus, studies on OSC started in April 2020. In addition, as a national policy study advocating the modular construction method, which is one of the OSC methods, was completed in the first half of 2019. 70 housing units in two complexes that satisfied the Housing Act requirements have been supplied to citizens. However, although modular construction methods have been recognized as a dramatic construction method that achieves shortened construction schedules and solves the issues of cost reduction and the shortage of technical workers on sites by combining the advantages of the manufacturing industry and applying the economies of scale, realistically it has issues due to the rising cost of steel and a low pre-fabrication ratio. Moreover, the construction time of core parts, such as those built by pouring concrete, has become a factor that hinders the shortening of construction times. Thus, this study aims to propose a precast concrete(PC) modular construction system, which fuses three-dimensional infill as an interior finish material and a three-surface PC module that can acts as a structure for a construction method that is economical and can shorten construction time.

  • PDF

Extraction and Analysis for Emphasis Development Field in Green Construction Technology (녹색 건설기술의 중점 개발 영역에 대한 추출 및 분석)

  • Yang, Jin-Kook;Shin, Sung-Joon;Kim, Ki-Nam;Hwang, Chi-Ho;Jang, Yun-Seok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.306-307
    • /
    • 2014
  • Green building technology has the potential a competitiveness. Reflecting this situation, the renewable energy market is growing rapidly. And, this field became value-added field in construction industry. In this study perform to prioritize the value improvements of green building technologies. To do this, first, we will extract potential development field through literature and case studies. Next, we will built a hierarchy structure based on the economic efficiency, technical skill, and policy. Third, we decide to prioritize between the items by performing AHP analysis.

  • PDF

A Counterplan for CODEX-Guideline and Construction of Organic livestock Production Basis (유기축산물의 Codex 대응과 조직적 생산기반구축 방안)

  • 유덕기
    • Korean Journal of Organic Agriculture
    • /
    • v.9 no.3
    • /
    • pp.1-22
    • /
    • 2001
  • This article described the production problems, import conditions of organic livestock products and background of CODEX-guideline, and presented the counterplan for future organic livestock production policy. The essential counterplan for CODEX-guideline and construction of organic livestock production basis include ; - Specific funding of research and development for excellent livestock breeding with consideration of regional enviroment-friendly applications to improve the quality of organic livestock products, - Development of production potential and resources utilization of organic feeding stuffs in domestic and foreign countries, - Horizontal and vertical organization of organic livestock farming and multifarm cooperation, - Specialization of organic livestock farming, and construction for direct or indirect linkage markets and Agro-food corporation for closer cooperation between inner and outer factor of farm management, - Construction of recycling system for the enviroment-friendly utilization of animal excrements.

  • PDF