• Title/Summary/Keyword: Construction Period

Search Result 2,705, Processing Time 0.033 seconds

A study on hazard rate decrease plan in plant construction site by improving foreman's role (플랜트 건설현장의 작업반장 역할개선을 통한 위험율 저감방안 연구)

  • Eun, Nam-Gwon;Kim, Chang-Eun
    • Journal of the Korea Safety Management & Science
    • /
    • v.17 no.3
    • /
    • pp.33-44
    • /
    • 2015
  • Domestic plant construction sites have a tendency to become bigger, more various and complicated. Moreover frequency of industrial incident is increasing due to short project period, coexistence work condition and using heavy construction equipment. Installing safety facilities and safety training contribute to prevent incident. But mostly incident happens due to workers' unsafe action and wrong work method. Technically, it is very difficult for us to closely manage workers preventing incident. Therefore, the role of foreman who ordinarily works together with his workers is considered more important. Specific execution plan was drawn through industrial incident statistics from Ministry of Labor and questionnaire survey to interest parties(supervisor, safety staff and foreman). If foreman has raised sense of belonging and responsibility by conducting practical safety training for his workers, manages job site and receives proper compensation for these roles, it will be expected that it fully influences incident decrease.

Customized Safety Information Delivery System for Unskilled Construction Worker Training

  • Jo, Junhyeon;Baik, Sangeun;Pedro, Akeem;Lee, Doyeop;Park, Chansik
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.525-532
    • /
    • 2022
  • Accidents at construction sites in Korea account for more than half of all industrial accidents. To solve this problem, a policy to strengthen safety education was implemented to ensure the safety of workers. However, it was analyzed that there is a high possibility of accidents because workers did not receive proper safety information for each risk factor due to general lecture-style education. In addition, statistics show that the accident status of workers with fewer years of period is high, indicating that a customized information delivery method needs to be proposed for unskilled workers with fewer years of period. Research on the importance of education has been conducted, but no information delivery method has been identified. For unskilled workers to effectively receive safety information, appropriate delivery formats (text, photos, illustrations, 4D-BIM, 360-based panorama, video, animation) were analyzed, and a new method of education was proposed. If customized safety information is provided according to this proposal, effective information delivery to unskilled workers will be possible, and it is expected to be verified in various ways.

  • PDF

Development of Primer Spouting Equipment to Secure Quality (품질확보를 위한 프라이머 뿜칠장비 개발)

  • Kim, Han-Sic;Ha, Jung-Soo;Lee, Young-Do
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.237-238
    • /
    • 2023
  • When primer is applied manually, adhesion performance decreases due to a decrease in primer penetration performance on the surface, and construction period delay may occur due to a long time due to a decrease in work efficiency when a large area is worked using a conventional roller. In addition, in the case of the roller method, precision work in corners and narrow spaces is not possible, so it is urgent to come up with measures to ensure uniform quality. In addition, secondary work occurs to remove fine powder from the surface before primer application, resulting in construction period delay due to the rise of the working stage. Therefore, in this study, equipment was used instead of manual work for primer work, and as a result, penetration performance and adhesion performance were improved about twice. From these results, it was confirmed that favorable results such as improving work speed, securing high quality, improving the working environment, and resolving the shortage of functional workers can be obtained.

  • PDF

A Study on the Evolutionary Process of Ddeulzip in Andong Kwon's Family at Andong Cultural Area (안동문화권(安東文化圈) 안동권씨(安東權氏) 뜰집의 변천과정(變遷過程) -안동권씨(安東權氏) 복사공파(僕射公派)를 중심으로-)

  • Kim, Hwa-Bong
    • Journal of architectural history
    • /
    • v.25 no.2
    • /
    • pp.45-56
    • /
    • 2016
  • The purpose of this study is to analyze the evolutionary process of Ddeulzip. The subject of this study is a clan family of Andong Kwon in Andong Area. Ddeulzip's evolutionary process of the construction and management is divided into largely three periods in Josun Dynasty. The establishment and changing process of Ddeulzip for Andong Kwon's family are analyzed according to three periods called the early(15~16C), mid(17~18C) and late(19~20C). The characteristics of the early and mid period are that they created their own ancestral building form of Ddeulzip. Those of the late period are in their strong will to make similar scale of Ddeulzip. And during the late period, although the construction of new Ddeulzip was started in the early stage, no more formation of Ddeulzip was made as it approached toward the late stage. And most important point is similar constructional space(gan) of first time. The residential Ddeulzip of Andong Kwon's family created at the 19C can be regarded as an representative example of large space that shows a typical form of housing by noble residents at the time.

Study on the Construction Method to Develop an Building Site After the Woongjin Period of Baekjae (백제 웅진기 이후 대지조성 공법의 연구)

  • Cho, Weon-Chang
    • Journal of architectural history
    • /
    • v.18 no.5
    • /
    • pp.25-39
    • /
    • 2009
  • The examples of developing a building site after the Woongjin period are mainly found in temple sites, tile-roofed building sites of unidentified features, and palace remains including the pavilion site with the river in the front(임류각지) inside the Castle of Gongsan, Gongjoo. In case of the Hanseong period, a glimpase of the features has gained in Poongnab mud castle and Mongchon mud castle, but the excavated relics are not yet enough to make some date out of them. After the Woongjin period of Baejae, the earth-ramming development method was used mostly to construct a building site, which is divided into horizontal and slant raising of the ground level. Both are used simultaneously, but there are the significant differences in the way of raising the ground level between them. Particularly, in case of the Wanggoong-ri relics in Iksan, the ground level was raised in a narrow line slantly, which is differentiated from other slant raising of the ground level, and its time of construction also is after that of others. In addition, the board-building development method used for narrow space is usually found in the remains since the seventh century. However, there are not enough the relics of Baekjae to reveal the whole aspect of building site development. It should be studied later through the subsequent excavation and research.

  • PDF

The effect of sound stress on laying hen performance (소음스트레스에 의한 산난계의 피해상황 연구)

  • 신창호;한귀섭;박현기;이용범
    • Korean Journal of Veterinary Service
    • /
    • v.23 no.3
    • /
    • pp.263-269
    • /
    • 2000
  • This study was carried out to set a standard of damage compensation by researching state of damage due to noises in laying and prelaying hens. Recently, there are many damage cases in chicken farms near construction site that were caused by noises of construction. Therefore disputes and complaints about economical loss have increased ceaselessly. But we have few research and report such a thing. The result have shown that the weight loss rate was ranged from 9.48% to 23.2% and mortality of laying period of hens was higher than prelaying period. Pathological findings were fatty liver, congestion and hemorrhage of intestine, erosion of proventriculus and gizzard in order of case frequency. And these signs in hens of laying period was more serious than prelaying period. Half-life rate of antibody titers against Newcastle disease and infectious bronchitis in sound stressed hens was no different compared with non-stressed hens. Egg production rate dropped from 38% to 45% according to strength of noises. Before being stressed, hens produced special, large, middle, small-size eggs in the order. But after being stressed, their egg Production rate of middle, small-size Increased while egg production rate of special, large-size decreased. Production rate of soft and broken shell eggs was 0.015% in the stressed flocks higher than 0.005% in the non-stressed flocks.

  • PDF

Designed Compressive Strength Assurance Method of Management Period for Winter Concrete Using Blast Furnace Slag (한랭환경에서 타설되는 고로슬래그 시멘트 콘크리트의 설계기준강도 확보 기법)

  • Lee, Young-Jun;Lee, Hyuk-Ju;Han, Jun-Hui;Hyun, Seung-Yong;Seo, Hang-Goo;Han, Min-Cheol
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.11a
    • /
    • pp.42-43
    • /
    • 2018
  • The research is to suggest the compensating strength values depending on various managing periods of concrete based on the strength development model calculated with equivalent age method for 20% of blast furnace slag replaced concrete. As a result, for 28 days of managing period, 9, 6, and 3MPa of compensating strength values were suggested when the temperatures were from 4 to 6℃, from 6 to 12℃, from 12 to 17℃, respectively. Additionally, for 42 days of managing period, 6 and 3MPa of compensating strength value was suggested when the temperature was from 4 to 7℃, from 7 to 12℃, and for 56 days of managing period, 3MPa of compensating strength value was suggested when the temperature was from 4 to 9℃. Furthermore, for 28, 42, 56, and 91 days of managing periods, any compensating strength values were needed when the temperature were higher than 17, 12, 9, and 4℃, respectively.

  • PDF

Seismic resonance vulnerability assessment on shear walls and framed structures with different typologies: The case of Guadalajara, Mexico

  • Ramirez-Gaytan, Alejandro;Preciado, Adolfo;Flores-Estrella, Hortencia;Santos, Juan Carlos;Alcantara, Leonardo
    • Earthquakes and Structures
    • /
    • v.22 no.3
    • /
    • pp.263-275
    • /
    • 2022
  • Structural collapses can occur as a result of a dynamic amplification of either, the building's seismic response or the ground shaking by local site effects; one of the reasons is a resonance effect due to the proximity of the structural elastic fundamental period TE and the soil fundamental period TS. We evaluate the vulnerability to resonance effects in Guadalajara, México, in a three-step schema: 1) we define structural systems in the building environment of western Guadalajara, in terms of their construction materials and structural components; 2) we estimate TE with different equations, to obtain a representative value in elastic conditions for each structural system; and, 3) we evaluate the resonance vulnerability by the analysis of the ratio between TE and TS. We observe that the larger the soil fundamental period, the higher the resonance vulnerability for buildings with height between 17 and 39 m. For the sites with a low TS, the most vulnerable buildings will be those with a height between 2 and 9 m. These results can be a helpful tool for disaster prevention, by avoiding the construction of buildings with certain heights and structural characteristics that would result in a dangerous proximity between TE and TS.

KOREAN CONSTRUCTION JOB MARKET FORECAST FOR CIVIL/ARCHITECTURAL ENGINEERS

  • Hwan Pyo Park;Myung Jin Chae;Minwoo Lee
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.952-955
    • /
    • 2005
  • In the early 90's, we had serious shortage of construction engineers in Korea. The shortage was acute especially in construction quality control and supervision area, which were gaining social attention due to the road bridge and the department store collapse that took the hundreds of lives in the early 90's in Seoul, Korea. In order to meet the high demand of construction engineers, the engineering license regulations were changed in 1995. Engineers who did not pass the written exam but have equivalent working experience are given engineering license to practice engineering legally. Since year 2000, while the severe engineer-shortage has been resolved, the opposite situation has occurred: there is serious over-supply of construction engineers. Policy makers and engineering practitioners are agreed to bring back the old-fashioned written exam engineer licensing system like before 1995, i.e., no more written exam exemption. However, the engineers who obtained license without taking written exam may not want to go back to old policy which would take their license. It is required to provide appropriate grace period before the new policy takes effect to minimize the impact of the changes. This paper forecasts the supply-demand of construction engineers providing the basis for the most appropriate policy changes.

  • PDF

Development of Quality Management in Small and Medium Construction Company (중 · 소규모 건설회사의 품질관리 방법 개선)

  • Lee, Geu-Sun;Yun, Yer-Wan;Yang, Keek-young
    • Journal of the Korea Institute of Building Construction
    • /
    • v.5 no.3 s.17
    • /
    • pp.117-124
    • /
    • 2005
  • Quality management in construction industry becomes more significant under the existing conditions such as, increasing higher demand caused by the high value of real estate and extension of the warranty period. Therefore, this study presents the alternative idea related to the current quality management conditions of small and medium construction companies, including the difficulties and problems in qualify management, in order to develop the systematical method for the quality management in small and medium construction company.