Acknowledgement
이 연구는 2020년도 정부(교육부)의 재원으로 한국연구재단의 지원을 받아 수행된 기초연구사업임(No. NRF-2020R1I1A3 072819).
When primer is applied manually, adhesion performance decreases due to a decrease in primer penetration performance on the surface, and construction period delay may occur due to a long time due to a decrease in work efficiency when a large area is worked using a conventional roller. In addition, in the case of the roller method, precision work in corners and narrow spaces is not possible, so it is urgent to come up with measures to ensure uniform quality. In addition, secondary work occurs to remove fine powder from the surface before primer application, resulting in construction period delay due to the rise of the working stage. Therefore, in this study, equipment was used instead of manual work for primer work, and as a result, penetration performance and adhesion performance were improved about twice. From these results, it was confirmed that favorable results such as improving work speed, securing high quality, improving the working environment, and resolving the shortage of functional workers can be obtained.
이 연구는 2020년도 정부(교육부)의 재원으로 한국연구재단의 지원을 받아 수행된 기초연구사업임(No. NRF-2020R1I1A3 072819).