• Title/Summary/Keyword: Construction Participants system

Search Result 190, Processing Time 0.031 seconds

Impact of Introduction of Construction Labor Providers System and Improvement Plan (건설노무제공자제도의 도입에 따른 영향 및 개선방안)

  • Ahn, Hye-Kyun;Seo, Hee-Chang;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.149-152
    • /
    • 2010
  • Construction labor provider system is requested system by professional construction companys of profitless caused by directly hire of construction labor and labor management of difficulty after construction participants system abolition. Complemental laws which occured problems of Payment of wages, illegal subcontracting In construction participants system is prepared and no complemental point included in revised bill. but Construction labor groups oppose introduction of Construction labor provider system because groups concern to occurr before problem in construction participants system. The purpose of this study is drawn satisfactory system to Specialty contractor and construction worker.

  • PDF

A Status Analysis on the Field Management of Professional Construction Firms after Abrogation of Construction Participants System (시공참여자제도 폐지 이후 전문건설업체의 현장관리 실태분석)

  • Park, Kyoung-Hun;Kim, Hwa-Joong;Son, Chang-Baek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.11a
    • /
    • pp.199-203
    • /
    • 2009
  • After the construction participants system is abolished, expectations are high for its consequences such as liquidating paper-companies, holding back low price contracts, and improving multi-stepwise subcontract structure. However, the professional construction firms have been took responsibilities and obligations as businessmen employing the chief workmen and construction workers. For this reason, it is expected that they will be charged a great deal of expenses such as increase in labor management services and laborers, the occurrence of an retirement grants, insurance fees, etc. Since the hold on power of field managers are getting weaker toward the construction workers, it is most likely to have loss in efficiency of production in the long term. Therefore purpose of this research is to analyze difficulties and the point at issues with which professional construction firms are undergoing after abolishing the construction participants system by investigating on the actual condition in the field management. For this research, we got a grip on the actual condition and analyzed the rise of a primary factor on reinforced concrete construction.

  • PDF

A Study on The Possibility of BIM(Building Information Modeling) Application of Construction Management (건설사업관리의 BIM(Building Information Modeling) 적용 가능성에 관한 연구)

  • Shim, Jin-Kyu;Yi, Hye-In;Kim, Jae-Jun
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.10 no.2
    • /
    • pp.49-60
    • /
    • 2010
  • The production process of construction industry is different from thing of the general manufacturing, likewise various participants make temporary teamwork for success of the project through sharing of information. But the each role of participants is individually changed to step in construction process stage and moreover it has complicated, entangled interests. The Construction Management was inducted for the effective management and operation of construction project. The Key of the Construction Management success depends on the cooperative relationship relation to major participants. The domestic construction system is difficult with many trial and errors for the frequent plan change. As the building are more bigger and complicated, Building Information Modeling is demanded design and maintenance. This evaluation was done by the trust on the system as well as Construction Management. And then it applies the BIM it analyzes the example of construcrion project.

Measuring of the Performance of a Construction Management Project from Viewpoints of Project Participants -Focusing on Owner, Construction Manager, Designer and Constructor- (건설사업 참여주체(발주자, CMr, 설계자, 시공자) 관점에서 건설사업관리 성과측정에 관한 연구)

  • Ahn, Eun-Jin;Yoo, Byeong-Gi;Lee, Yoon-Sun;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.3
    • /
    • pp.194-205
    • /
    • 2008
  • The production process of construction industry is different from thing of the general manufacturing, likewise various participants make temporary teamwork for success of the project through sharing of information. But, the each role of participants is Individually changed to step in construction process stage and moreover it has complicated, entangled interests. The CM(so it called Construction Management as an abbreviation word) system was inducted for the effective management and operation of construction project. The key of the CM success depends on the cooperative relationship relation to major participants. There are lots of studies and efforts for the performance measures of the CM, however existing performance index is only measured as the viewpoint of project owner. Therefore it needs to make up for balanced view through combination of the four-way view of participants. In this study, we should search for cooperative relationship of project participants, and then we should suggest to define the difference of project in their viewpoints.

Medication Error Management Climate and Perception for System Use according to Construction of Medication Error Prevention System (환자안전 관리자가 인식한 투약오류예방 시스템 구축실태에 따른 투약오류관리풍토 및 활용인식)

  • Kim, Myoung-Soo
    • Journal of Korean Academy of Nursing
    • /
    • v.42 no.4
    • /
    • pp.568-578
    • /
    • 2012
  • Purpose: The purpose of this cross-sectional study was to examine current status of IT-based medication error prevention system construction and the relationships among system construction, medication error management climate and perception for system use. Methods: The participants were 124 patient safety chief managers working for 124 hospitals with over 300 beds in Korea. The characteristics of the participants, construction status and perception of systems (electric pharmacopoeia, electric drug dosage calculation system, computer-based patient safety reporting and bar-code system) and medication error management climate were measured in this study. The data were collected between June and August 2011. Descriptive statistics, partial Pearson correlation and MANCOVA were used for data analysis. Results: Electric pharmacopoeia were constructed in 67.7% of participating hospitals, computer-based patient safety reporting systems were constructed in 50.8%, electric drug dosage calculation systems were in use in 32.3%. Bar-code systems showed up the lowest construction rate at 16.1% of Korean hospitals. Higher rates of construction of IT-based medication error prevention systems resulted in greater safety and a more positive error management climate prevailed. Conclusion: The supportive strategies for improving perception for use of IT-based systems would add to system construction, and positive error management climate would be more easily promoted.

A vision and strategy for developing virtual construction system (가상 건설 시스템 비전과 구축 방향)

  • Choi, Cheol-Ho;Chin, Sang-Yoon;Kim, Jae-Jun;Shin, Hyun-Mock;Lee, Kwang-Myong;Yoon, Su-Won
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2007.04a
    • /
    • pp.62-67
    • /
    • 2007
  • The research team for the virtual construction development was established with the support of Korea Ministry of Construction and Transportation, and KICTEP (Korea Institute of Construction and Transportation Technology Evaluation and Planning). Its aims are to develop system that is to improve productivity & quality, to create a higher value-added business, and to cultivate international competitiveness in the construction industry. The virtual construction system is a design, engineering, and construction management information system that allows the project participants to effectively share the information throughout the construction life cycle with the support of 3D and design information. To achieve this, the research team focuses on developing several systems. First, the team focuses on developing for the pre-planning, the structural engineering, MEP, and the 3D based estimation system. Second, they focus on developing a simulation system for the construction process planning and feasibility study with help of the virtual reality technologies. Third, they focus on developing the CPLM (Construction Project Life-cycle Management) system for managing construction project data, and the decision support system that makes the collaboration among the project participants based on 3D technologies and information. We also focus on developing the SDAI (Standard Data Access Interface), the localized guideline for 3D design, and a training program. In addition, we focus on developing the undeveloped area of the commercial system and building an environment that can support the communication and collaboration in the construction life-cycle rather than developing the existing and commercialized system.

  • PDF

BIM for Construction Quality Record

  • Son, Sang-Hyuk;Lee, Dong-Eun
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.252-254
    • /
    • 2015
  • Building Information Modeling (BIM) encourages effective information share and utilization among project participants during entire life cycle of facility. This paper presents a method that keeps track of the historical quality records involved in construction operations and facilitates using BIM. The method is coded into BIM based Quality Record Traceability (BIM-QRT) System that makes use of historical records obtained from database administrating construction operations. This study is of value to practitioners because the method makes clear the project participants' responsibility relative to the quality of each and every element of the facility. The main objective of this research is to develop an accurate, fully automated method for construction Quality Record Tracking by using a BIM along with construction operations data obtained by information technology. Test cases verify the usability and validity of the methods implemented in the system.

  • PDF

XML-base Process Improvement for Change Order of Construction Steel Works (XML 적용 철골공사 설계변경 프로세스 개선)

  • Nam, Gyoung-Woo;Seo, Yong-Chil;Hyun, Chang-Taek;Koo, Kyo-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.1 s.29
    • /
    • pp.64-72
    • /
    • 2006
  • The participants of steel works should exchange a variety of information with others through documents. However construction steel works in the multistage contract system has a difficulty in exchanging information through the documents promptly. So if the trouble as change orders arise, conducting steel works will take much time, and the participants may not discuss the trouble sufficiently. Consequently this study improved the current business process of steel works. And this developed business support system(XCOS) based on XML so that participants of steel works achieve a successful management of steel works through conducting business rapidly and correctly.

A Fundamental Study on System Development for Managing Information Exchange between Participants in Design Phase (설계사무소와 엔지니어링업체간 지속적 정보교환관리 시스템 구축을 위한 기초연구)

  • Jun, Joon-Ki;Yi, June-Seong;Yoo, Seung-Yeun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.322-326
    • /
    • 2007
  • Recently, as construction projects are getting bigger and more complex, the number of participants has been tremendously increased. According to the current trend, the necessity of collaboration design management controlling communication and information exchange among many participants has came up. So this study considers the roles and tasks of each participant and informations that occur in each design stage, and looks into the present status of collaboration in design management of domestic design companies. Finally, the function of collaboration system is drove. It supports tasks of design participants, such as input design outcome, decision making among concerned people and solution of design change and interference.

  • PDF

Owner-driven Lean Construction based on Participants' Needs Analysis (건설주체간의 니즈분석을 통한 발주자 참여형 린 건설 연구)

  • Lee, Kang-Woo;Ryu, Chung-Gyu;Park, Hee-Dae;Han, Seung-Heon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.222-226
    • /
    • 2008
  • The construction industry has remained stagnant for a long time. So many researchers have wanted to solve this problem not only focusing on enhancement of construction process, but also introducing the culture of cooperation. The Last Planner System(LPS), one of the elementary techniques of Lean Construction, aims for improving the work reliability and reducing variability by measuring and managing the daily or weekly performance for overcoming the weakness of recent complex schedule management tools such as Critical Path Method. This research propose a framework for implementation of LPS conducted by owner focused on construction stage and introduce optimal owner participation model in plant construction, based on needs analysis for construction participants. Furthermore, this research introduce a modified needs analysis, so called IPBA(Importance-Performance-Betterment Analysis), and an advanced LPS procedure which add the needs analysis during pre-LPS and(or) main LPS stages.

  • PDF