Development of Time-Cost Models for Building Construction Projects in Bangladesh

  • Rahman, MD. Mizanur;Lee, Young Dai;Ha, Duy Khanh;Chun, Yong Hyun
    • Journal of Construction Engineering and Project Management
    • /
    • v.4 no.3
    • /
    • pp.13-20
    • /
    • 2014
  • Estimating time and cost is an important mission in the early phase of a construction project, especially in feasibility study. It provides a foundation for making decision whether or not the project is performed on schedule and within budget. Thus, reliability of this estimate plays a key role in measuring the success of a project. This study was carried out to investigate the time-cost relationship in building construction projects in Bangladesh. The mathematical equation used in this study is based on Bromilow's equation. The research data were collected from sixty-three completed building projects through questionnaire survey. Type of clients, type of projects, and tender methods are the project characteristics considered in this study. The results of analysis indicated that the Bromilow's time-cost (BTC) models developed for each project characteristic are appropriate due to quite high coefficient of determination and relatively small mean percent errors. Among them, the forecasted model for time and cost according to tender methods is the best fit model. It is concluded that the BTC model could be applied in building construction project to predict its time and cost in Bangladesh. Four different regression models were also developed in this study. The results of BTC model between some selected countries were compared to gain the comprehensive view.

A Study on the Architectural Thought and Its Construction shown in F. L. Wright's Taliesin West' (프랭크 로이드 라이트의 '텔리에센 웨스트'의 건축화 과정에 관한 연구)

  • Park, Jong-Sung
    • Korean Institute of Interior Design Journal
    • /
    • v.16 no.3 s.62
    • /
    • pp.3-9
    • /
    • 2007
  • Taliesin West is a meaningful historic site in architecture field, because its place had still been existing only one in the world as a ideal architectural community for working and living as well as learning by doing for Taliesin Fellowships and others based on F. L. Wright's idea of Organic Architecture. The main purpose of this study was to follow up the architectural thought and its construction shown in F. L. Wright's 'Taliesin West'. A study on the key notes are as follows; 1) The key-clue of the construction background for Taliesin West was based on the project of 'Complex Campus Building' which was early planed by F. L. Wright. 2) A basic design idea for Taliesin West was admiring from its own site characters as well as the Experimental construction methods and materials. 3) Design motive of Taliesin West was based on American Indian's movable shelter which called 'Tepee.' 4) A construction of F. L. Wright's temporary studio, Ocotilla, was a good opportunity to construct for Taliesin West which construction methods, covered and framed, were same as Ocotilla. 5) A concept idea of the master plan for Taliesin West came from combining Taliesin's Hillside Home School and Complex Campus Building project. 6) Construction of Taliesin West was a final accomplished place as F. L. Wright's utopia architecture and community.

The Analysis on the Impact Factors of Delivery Method for Multi-Family Housing Projects (공동주택 건설공사의 발주방식 영향요인 분석)

  • Moon, Hyun-Seok;Hong, Tae-Hoon;Koo, Gyo-Jin;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.3
    • /
    • pp.75-84
    • /
    • 2008
  • Recently, construction industry demands have been changed by domestic construction circumstances such as high-technology, mega-projects, and the complexity of construction. In order to deal with the change of such a domestic construction circumstances, the Ministry of Construction and Transportation (MOCT) has introduced advanced delivery methods. However, the advantages and disadvantages of the advanced delivery methods have not been effectively applied for previous projects. The reason for this is that the "Reviewing Standard for the Large-scale Construction Bidding Method" has not reflected enough prcject characteristics when the delivery method is selected in the project planning phase. Therefore, this paper proposes the Analysis on the Impact Factors of Delivery Method for Multi-Family Housing Projects.

The Selection of Roof Waterproofing Methods using the Analytic Hierarchy Process (AHP) Technique (AHP 기법을 활용한 지붕방수공법 선정에 관한 연구)

  • Choi, Oh-Young;Cho, Hong-Gyu;Kim, Gwang-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.4
    • /
    • pp.95-103
    • /
    • 2010
  • The purpose of this study is to propose a decision-making technique for selecting waterproofing methods using the Analytic Hierarchy Process (AHP) technique. In this study, a questionnaire survey was given to a group of specialists, which included design specialists, construction specialists, and maintenance specialists, regarding their experience with roof waterproofing methods. The 1st level hierarchy of the questionnaire survey addressed the function, economics, and maintenance of each of the roof waterproofing methods. The rank of 13 items of questionnaire, which is the 2nd level hierarchy of the questionnaire survey, is calculated using Expert Choice Solution. The analysis of questionnaire survey shows that each specialist selects different roof waterproofing methods, and all specialists make much of waterproof performance.

A Study on Optimization Model of Time-Cost Trade-off Analysisusing Particle Swarm Optimization (Particle Swarm Optimization을 이용한 공기-비용 절충관계 최적화 모델에 관한 연구)

  • Park, U-Yeol;An, Sung-Hoon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.6
    • /
    • pp.91-98
    • /
    • 2008
  • It is time-consuming and difficulty to solve the time-cost trade-off problems, as there are trade-offs between time and cost to complete the activities in construction projects and this problems do not have unique solutions. Typically, heuristic methods, mathematical models and GA models has been used to solve this problems. As heuristic methods and mathematical models are have weakness in solving the time-cost trade-off problems, GA based model has been studied widely in recent. This paper suggests the time-cost trade-off optimization algorithm using particle swarm optimization. The traditional particle swarm optimization model is modified to generate optimal tradeoffs among construction time and cost efficiently. An application example is analyzed to illustrate the use of the suggested algorithm and demonstrate its capabilities in generating optimal tradeoffs among construction time and cost. Future applications of the model are suggested in the conclusion.

Essence Applicability Matrices for the Reduction of Project Cycle Time

  • Hong, Tae Hoon;Son, Jae Ho
    • Architectural research
    • /
    • v.8 no.1
    • /
    • pp.57-68
    • /
    • 2006
  • Global competition and reduced project life cycle ultimately puts greater performance requirements on the capital project delivery systems used to maintain competitiveness. Despite continuing improvements in delivery cycle time, business owners of facilities continue to demand greater improvements in project delivery cycle time. Therefore, it is very important to investigate the various techniques and methods leading to reduction in project cycle time and also identify the applicability of identified techniques and methods. This paper introduces reduction techniques identified through literature review (i.e, Schedule Reduction Techniques (SRTs), Management Techniques (MTs), and Construction Institute Industry (CII) Best Practices (BPs). In order to collect applicability of these techniques under different project phases (Pre-project planning (PPP), Design (D), Material Management (MM), Construction (C), and Start-up (SU)), the Essence Applicability Matrices (EAM) is used.

Characteristics and Applicability of CWS(Continuous Wall System)II Method (CWS(Continuous Wall System)II 공법의 특성 및 적용성)

  • Lim, In-sig;Lee, Jeong-bae;Kim, Jae-dong;Lee, Jai-ho;Woo, Sung-woo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.11a
    • /
    • pp.43-47
    • /
    • 2008
  • CWSII method was developed to overcome the problems of frequent occurrence in the application of existing downward construction methods, especially in the case of using slurry wall instead of SCW or CIP as a retaining wall. By the improvements in connecting steel beams with the wall, CWSII method is able to ensure the settlement of a steel beam and the diaphragm effect of a slab while reducing the degree of difficulty and the term of works and the cost of construction. As the desired results, CWS method can be applied as a practical downward construction method regardless of the type of retaining wall. In this paper, besides the concept and features of CWSII method, it can be seen that the method can provide reliable and economical performances by comparing with existing methods.

  • PDF

Selection process of the optimal structural-reinforcement method in remodeling construction works (리모델링 프로젝트의 최적 구조보강방법 선정 프로세스)

  • Kim, Dong-Pil;Cho, Kyu-Man
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.298-299
    • /
    • 2014
  • As a governmental plan for real estate revitalization, remodeling vertical extension has been permitted. Thus, the Ministry of Land, Infrastructure and Transport preannounced proclaiming the revised Housing Act and establishing the remodeling basic plan, and it is anticipated that the remodeling market will be revitalized in earnest after the enforcement of remodeling vertical extension(April 25th. 2014). As vertical extension is applicable up to 3 stories, the safety of building for remodeling is becoming important, so most remodeling construction works use various methods for structural reinforcement. In this process, the selection of structural reinforcement method has depended on structural engineer's experience and knowledge and there has been a limitation in selecting the optimum structural reinforcement method which considers remodeling project characteristics. Therefore, this study analyzed the factors to determine the kinds of structural reinforcement method in a remodeling project and suggested a process to select the best structural reinforcement method of remodeling construction.

  • PDF

Effects of SiO2 in Turkish Natural Stones on Cancer Development

  • Dal, Murat;Malak, Arzu Tuna
    • Asian Pacific Journal of Cancer Prevention
    • /
    • v.13 no.10
    • /
    • pp.4883-4888
    • /
    • 2012
  • In materials science, one of the new concerns in the construction industry, it is well established that mineral dust from rocks (stones) has adverse effects on human health. For instance, it is suspected that some mineral dusts in particular leads to occupational diseases, including lung cancer. The present research concerned the relationship between cancer and those workers who work in Turkish construction industry and quarries and are exposed to silica mineral dust from natural stones. One focus was cancer prevention methods applied in-site. In mining and construction industry where stone dust is widely used, silicosis induced lung cancer is frequently seen. Cancer cases which are seen across the regions mostly affected by silica containing dust in Turkey were identified and a survey was conducted of the methods to protect workers in the construction industry from exposure to silica dust.

A Study on the Direction for Developing the Korean PDRI(Project Definition Rating Index) (한국형 PDRI(Project Definition Rating Index)기법 개발 방향)

  • Hong, Sim-Hee;Yu, Jung-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.168-169
    • /
    • 2016
  • Risk management at an early stage of projects is known as an effective method expected various benefits. The PDRI(Project Definition Rating Index) by the CII(Construction Industry Institute) is defined project scope for reducing risks. In addition, the PDRI is one of the verified methods for achieving benefits by a risk management. The literature review in Korea about risk management is all about focusing on construction works and the construction phase. Thus, we need to extend the perspective of a project management such as the PDRI. To develop the Korean PDRI, However, we have to consider Korean situations. Therefore, in this study, we analyze some previous studies of PDRI' indexes and its using methods, and suggest the new direction for using PDRI in Korea. This method will enable to improve the scoring method of a project management with PDRI in Korea.