The objective of this study is analyzing of requirements for improvement of the work-life balance of construction managers working in Korean construction companies. A survey has been conducted to analyze the requirements for improvement of construction managers. The survey was conducted on construction managers working in the field of architectural construction. 59 field managers working in 18 Korean construction companies responded to the survey. Upon analysis of the survey, the working hours were excessive and recreational time was very poor for the construction managers. There were differences in the answers regarding the areas that require improvement in the working conditions based on the age groups of the construction managers. A majority of young technicians selected that the recreational time and content of work require improvement, and technicians with a lot of experience selected that the stability of occupation and wage require improvement.
Journal of Construction Engineering and Project Management
/
제2권3호
/
pp.8-16
/
2012
After the 2008 global financial crisis, the construction environment in South Korea continued change in the construction environment. Construction orders in 2011 have shown a downward trend compared with the previous year. Along with these changes in the construction market, the professional capabilities of construction project managers that are perceived as important also changed after the global financial crisis. Accordingly, this study was conducted to identify the major business capabilities of the current construction project managers and to determine which of these capabilities have undergone changes in terms of the importance accorded to them after the global financial crisis, and ultimately, to derive the construction project manager capability areas that need to be strengthened according to the changes in the construction environment. The capabilities of construction project managers were surveyed at two different time points: in 2007 and in 2010. The results show that the year 2010, after the global financial crisis, an increase in the perceived important capabilities of construction project managers compared with 2007. This results the impact of the changes in the construction environment on the importance of construction project managers. This study derived the ramifications of the early identification of systems and prospects according to the changes in the construction circumstances on more efficient onsite and human resources management, by considering the appropriate capabilities of the construction project managers.
CM시장이 성장하면서 CM기업의 수도 증가하고 기업 간의 경쟁이 심화됨에 따라 경쟁력 향상을 위한 노력이 필요하게 되었다. 특히 유능한 CM단장을 보유하는 것은 CM기업의 경쟁력 향상을 위한 중요한 현안으로 인식되고 있다. 본 연구의 목적은 CM조직의 리더이자 발주자 만족과 프로젝트 성공을 위해 중추적인 역할을 담당하는 CM단장에게 요구되는 핵심역량을 발굴하는 것이다. CM단장에게 요구되는 역량은 다양하지만 문제해결능력, 신뢰도, 협상능력 등이 가장 중요한 핵심역량으로 나타나고 있다. CM단장 핵심역량에 대한 이해는 우수한 CM단장 육성과 CM단장의 자기계발을 위해 중요하며 궁극적으로는 CM기업의 경쟁력 향상을 위한 중요한 전제조건이다.
The construction accidents which had been on the downward trend for the past decades have increased for five consecutive years since 2008. In order to let the increasing trend of construction accident slow growing or switching to decline, various efforts are required of all members in construction industry such as government, employers, construction engineers, safety managers, construction workers, etc. Although the criteria for appointment of safety managers in construction site introduced in 1982 have contributed to prevent construction accident as a forefront for the past 30 years, it has not been a remarkable improvement in the safety manager's status and roles which have been required to change according to the changes of circumstances and environments. In associated with a newly introduced the criteria for appointment of health managers in construction site in the year 2015, the problems such as role, status, number of safety and health managers are needed to be considered comprehensively and improved widely. In this study, we propose several improvement plans which will improve the current criteria for appointment of safety and health managers in construction sites.
Background: The study was conducted to investigate the current status of the occupational health and safety management system (OHSMS) in the construction industry and the effect of OHSMS on accident rates. Differences of awareness levels on safety issues among site general managers and occupational health and safety (OHS) managers are identified through surveys. Methods: The accident rates for the OHSMS-certified construction companies from 2006 to 2011, when the construction OHSMS became widely available, were analyzed to understand the effect of OHSMS on the work-related injury rates in the construction industry. The Korea Occupational Safety and Health Agency 18001 is the certification to these companies performing OHSMS in South Korea. The questionnaire was created to analyze the differences of OHSMS awareness between site general managers and OHS managers of construction companies. Results: The implementation of OHSMS among the top 100 construction companies in South Korea shows that the accident rate decreased by 67% and the fatal accident rate decreased by 10.3% during the period from 2006 to 2011. The survey in this study shows different OHSMS awareness levels between site general managers and OHS managers. The differences were motivation for developing OHSMS, external support needed for implementing OHSMS, problems and effectiveness of implementing OHSMS. Conclusion: Both work-related accident and fatal accident rates were found to be significantly reduced by implementing OHSMS in this study. The differences of OHSMS awareness between site general managers and OHS managers were identified through a survey. The effect of these differences on safety and other benefits warrants further research with proper data collection.
The 3th International Conference on Construction Engineering and Project Management
/
pp.1564-1569
/
2009
Project managers play a key role in cost, time, and quality of a project. Selection of an appropriate project manager, therefore, is considered as one of the most important decisions in any construction project. It should be noted that most important decision makings are carried out by the project manager throughout the project. Traditionally, project manager selection in construction companies in Iran is through organizing an interview with candidates and selecting the most appropriate choice in accordance with the capabilities, potentials and individual specifications coupled with the requirements of the project. In the same direction, organizing interview on selection of appropriate candidate is usually carried out by senior managers of companies. Determination of the most important criteria for selection of project managers and also identification of significance coefficient of each criterion can highly help senior managers of companies to make sound selection decisions. In this paper, a numerical model has been considered for determination of significance of each criterion, details of which are submitted for selection of project manager in Iranian petrochemical, oil and gas sector companies. For this reason, all criteria- considered by senior managers of the companies under study- are first determined. Then, information obtained through 38 interviews, conducted by senior managers of the mentioned companies while selecting project manager, is analyzed. Significant coefficient of each criterion is calculated through the accumulated data using fuzzy curves method.
The success of a construction project hinges on the effective and efficient management of human resources. The stress of human resources is directly related with work performance, and as such, should be managed to improve work performance. This study examined the correlation between job stress and job satisfaction among building construction project managers. A questionnaire to measure work performance was created by referring to the Korean Occupational Stress Questionnaire Short Form developed by the Korean Occupational Safety & Health Agency, as well as a previous study. The mean job satisfaction score of field managers was 3.6, which suggests that they are generally satisfied in their current job environment. A Pearson's correlation analysis showed that the field managers that were satisfied with their job had less job stress. These results could be used for the effective management of construction site managers and to improve their job performance in the field.
Recently, It is a fact that the percentage of female field managers has increased in the construction industry. Therefore, this study investigated the percentage of female construction site managers by conducting a survey of current male and female construction site managers and then analyzed the workload, work difficulty, work importance and performance level of female employees in charge of public affairs, which is the most common tasks.
Recently, the scale of construction project is getting bigger compared to previous projects. Therefore, the job stress of the field manager responsible for the construction project is getting more and more intense. Therefore, construction companies should establish a job stress management plan for stable human resource management of the field managers. From this perspective, in this study was developed a job stress measurement system in connection with MBTI personality types. The developed system allows the job stress of the field manager to be judged on a scale from 1 to 9 points. Accordingly, it is expected that construction companies will contribute to the effective management of field managers in the future.
이 연구의 목적은 D사(社) 건설사업관리자의 역량 모형을 개발하고, 역량 개발의 요구를 분석하는 것이다. 이를 위해 D사(社)의 우수 건설사업관리자 25명을 대상으로 델파이 방법을 활용하여 역량 모형(안)을 개발하였다. 연구 결과, D사(社) 건설사업관리자 역량 모형은 3개 역량군, 11개 역량, 60개 행동 지표로 구성되었다. 그리고 D사(社) 건설사업관리자 114명을 대상으로 설문조사를 실시하여 우수 집단과 평균 집단의 역량 수준을 비교 분석하는 동시적 구성 타당화를 통해 역량 모형을 검증하였다. 또한 각 역량의 필요 수준과 현재 수준을 조사 분석하여 역량 개발의 우선순위를 도출한 결과, 커뮤니케이션, 리스크 관리, 목표 의식, 고객 지향, 프로젝트 관리 역량에 대한 개발 요구도가 높은 것을 확인하였다. 이상의 연구 결과를 바탕으로 건설사업관리자의 역량 기반 인적자원개발에 관한 몇 가지 시사점을 제시하였다.
이메일무단수집거부
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.