• Title/Summary/Keyword: Construction Labor

Search Result 728, Processing Time 0.033 seconds

A Study on the Development Prospects of Building Construction Productivity through Construction Status Analysis (건설업 실태분석을 통한 건설업생산성의 발전전망에 관한 연구)

  • Park, Hong Tae;Jeon, Jun Tai;Lee, Yang Kyu
    • Journal of the Society of Disaster Information
    • /
    • v.8 no.3
    • /
    • pp.242-257
    • /
    • 2012
  • Korea's population change trend is the aging and feminization as Reduction in mortality, average life extension. and is further increased Reduction of birth rate and aging population. if Our country concluded FTA(Free Trade Agreement) with the United States, Europe and China etc. labor-intensive industries will be the decline. Then, the construction workers' jobs are continually reduced. This is critical to the nation's economic, social and environmental influences due to Shortage of construction workforce and increasing labor costs. Eventually this is a major factor in reduced construction productivity. Therefore, this study is presented as a construction productivity development prospects on the value-added analysis per Labour productivity employee from Construction market trends, industry-specific productivity index, industry trends Employed, age tiered workforce trends, women's workforce trends, labor time trend, foreign workers, workforce trends, analysis of trends in construction contract, awarded by Company Size trends, construction management analysis index.

Current Status and Improvement Plan for Foreign Construction Laborer (외국인 건설 근로자 현황 및 개선방안)

  • Park, Hee-Sung
    • The Journal of the Korea Contents Association
    • /
    • v.15 no.9
    • /
    • pp.555-561
    • /
    • 2015
  • The construction industry is a labor-oriented and quality, cost, and schedule performance is effected by technicians. However, the construction industry have faced a labor shortage problem. Therefore, technician graying and no new workers inflow cause labor shortage and decline of worker's skill level. The utilization of foreign technicians instead of domestic technicians has been increased in the construction industry. This paper performed questionnaire survey for 43 managers on 14 project fields to determine the current status and problems of construction technicians and to propose a improvement plan. As a result, most foreign technicians are carpenters and iron workers, but the skill levels are generally lower than domestics. The major problems for foreign technicians are communication and non-skilled. Then, labor productivity and accident rates of foreign technicians are higher than domestics. This paper proposes that skill training programs, language lessons, and multi-cultural programs are effective to improve foreign workers' problems.

A Model for Assessing Maximum Overtime Rate in Labor Subcontracting Practices

  • Nassar, Khaled;Hosny, Ossama
    • Journal of Construction Engineering and Project Management
    • /
    • v.2 no.2
    • /
    • pp.18-27
    • /
    • 2012
  • Despite the rapid development in the construction industry due to the changing new technologies, many projects still fail to meet target deadlines. Shortage in manpower and skilled laborers is one of the main reasons for such delays. Markets with high economic growth and economic expansion (such as Gulf Countries in the Middle East) may have pronounced labor the shortages. Labor subcontracting practices are used sometimes to increase production rates and meet project deadlines. This paper explains and analyses labor subcontracting practices currently being used in many places around the world (and especially in the Gulf Countries) and in particular defines a maximum overtime rate for laborers in the laborer-subcontracting method ensuring that the contractor gains both the time saved during overtime and also reduces the cost per unit produced. The mathematical model used formalizes a closed-form equation for overtime pay in similar situations and as such can be applicable worldwide. Data was collected from representative projects that employed such practices from various trades. Validation of the model and formula has been tested successfully by analyzing historic data. The results prove that contractors often do not reach the optimum use of their practices resulting in a higher cost per unit. The presented model and the analysis should be of interest to many contractors currently involved in the practice or considering its use and to those who wish to find new methods that would help in eliminating as much wastes as possible by allocating their resources in the most efficient way.

A Study on Productivity of Foreign Labors in Domestic Apartment Construction Site -Focused on Evaluation of Productivity and Productivity Impediment Factor- (건설현장에서 외국인 노동자의 생산성에 관한 연구 -생산성 및 생산성 저해인자 평가를 중심으로-)

  • Choi, Hee-Bok;Shin, Youn-Seuk;Kang, Kyung-In
    • Journal of the Korea Institute of Building Construction
    • /
    • v.5 no.1 s.15
    • /
    • pp.75-79
    • /
    • 2005
  • The Korean society faces a new issue of accepting foreign workers. Foreign labors in construction industry reached about 400,000 recently. Thus they have become one of the essential resources to fill up insufficient labor supplies in construction industry. And it is important how to manage foreign labors efficiently. However there are few studies focused on this subject. Purpose of this study is to research productivity of foreign labors in the domestic construction site. So investigate the value of foreign labors. Also this study forecast elements effect on foreign labors productivity in the construction industry. And research what element is more important to improve productivity and what element is more difficult to manage. In the result, this study is expected to prospect effective method of foreign labor's management in the domestic construction industry, so contribute to utilize foreign labors more efficiently.

FUTURE STRATEGY FOR KOREAN FIRMS INVOLVED IN OVERSEAS MARKETS

  • Rak-Keun Jeon;Jin-Woo Park;Jun-Youl Choi;Jae-Jun Kim
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.389-396
    • /
    • 2005
  • Despite very good reputation that Korean construction industrial firms had enjoyed until early 1990's in overseas markets, their participation abroad drastically declined after the delivery of two(2) million unit-housing project in the early 1990's and the foreign currency crisis that took place in the late 1990's. The revival of booming construction industry in domestic market is far beyond the expectation due to the long recession of the construction economy and government's severe restriction against real estate development. Under such crucial circumstances, the construction industrial firms' strategy to survive is the more active business promotion in overseas markets. However, the Korean construction industrial firms have to abandon the labor intensive strategy, through that they have enjoyed until the early 1990's, and turn to management oriented strategy which may be a new prosperous horizon and a new challenge as well, because the labor cost of newly developing countries is much more competitive. The aim of this study is to suggest how to cope with current market situations through a chronological survey based on the cost data prevailed during four decades from the 1960's until the 1990's in overseas markets.

  • PDF

Field Investigation Study of WWF Placing for the Apartment Building Construction (구조용 용접철망을 적용한 아파트 구조물의 시공성에 관한 연구)

  • 안경수;김상연;윤영호;양지수;이리형
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1997.04a
    • /
    • pp.657-662
    • /
    • 1997
  • In these day, there have been shortage of construction workers and an increase of labor cost in our county. In order to overcome these problems, prefabricated and mechanized system of bar placing have been used in the construction fields. As a part of this tendency, welded wire fabric(WWF) reinforcement were studied several years ago. In this study, the required working hour. the labor power and the construction process of WWF reinforcement for the apartment building slabs are reported. From the result of field investigations, it is showed that the WWF reinforcement facilitates the field placing and the working time of WWF placing is saved, and then the labor cost of WWF reinforcement is less than that of the conventional bar reinforcement.

  • PDF

Performance Analysis of BIM Labor using Case Analysis (사례분석을 활용한 시공단계 BIM 인력 투입 성과 분석)

  • Kim, Hyoung-Jin;Yoo, Moo-Young;Kim, Jae-Jun;Choi, Chang-Shik
    • Journal of KIBIM
    • /
    • v.7 no.3
    • /
    • pp.31-39
    • /
    • 2017
  • BIM is effective to improve the labor productivity of construction participants. From this point of view, it is important to analyze the outcome related with BIM Labor which covers most of the BIM investment costs. This research focuses on BIM RFI which is one of the major task of the BIM labor and analyze the outcomes. In addition, this research was quantitatively analyzed by the standby time and related cost caused by BIM labor, which affect the results of the project participants. To this end, analytical standby queue model was utilized to analyze the labor focusing on micros TASK. 11 projects were selected to analyze the results of BIM labor and RFI that the project participants requested to the BIM labor was collected. Through this, it collected variables for analyzing results, and Finally, we pulled out 4 projects for analysis. In this study, the basic results analysis of RFI processing of the BIM labor, the probabilistic analysis of BIM labor service status, and the economic analysis of BIM labor optimal inputs were performed by using the research model presented. The results of this study can be utilized to formulate the optimal strategy for BIM labor inputs(e.g. number of employees, level, time point, etc.) of the construction phase. Moreover, it can contribute to ensuring the credibility of the BIM ROI results by presenting the cost of BIM services in BIM ROI analysis and the standby cost of project participants.

CONSTRUCTION FATAL ACCIDENTS IN VIETNAM: AN EXPLORATORY STUDY

  • Soo-Yong Kim;Luu Truong Van;Yurl Hur
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.327-336
    • /
    • 2007
  • Construction activities are characterized as hazardous work. Therefore, it is very imperative to explore comprehensively fatal accidents and safety performance in both developed and developing countries. The goal of this study was to look at the reasons behind fatal accidents in HCMC, Vietnam's largest city. The survey sample consists of 91 fatal accident cases in total that occurred in construction sites during the years 1996-2005 and were reported to the Department of Labor-Invalids-Social Affairs in HCMC. The study was conducted by means of field surveys with relevant individuals working in construction sites and statistical analyses. The research resulted in failing to wear/use PPE as unsafe acts and in poor safety management procedures/methods in sites as insecurely working conditions behind serious accidents in the construction. The paper stresses that accidents tended to occur more in state-owned companies than in others and involved more with masonry/welding people and workers without labor contracts than with other workers.

  • PDF

Working Posture Analysis Using OWAS method of Core Wall Construction in High-rise Building (OWAS기법을 활용한 초고층 코어월 공사의 근로자 작업자세 분석)

  • Lee, Junehyuck;Kim, Taehoon;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.72-73
    • /
    • 2016
  • Working Posture is an important factor directly connected with quality and productivity of the construction project. In particular, High-rise building construction is required to manage the working posture due to the repetitive task and unfavorable working condition such as high place work, limited space. However existing construction planning of high-rise building construction has a negative effect on the labor's productivity because it is not insufficiently considered for working posture. Therefore the purpose of this study is to suggest a work that needs improvement by analyzing labor's working posture quantitatively using OWAS method. These results would provide the basic information to improve the productivity of the construction project by supporting the construction plan considering the working posture in high-rise building.

  • PDF

COVID-19's Effect on a Hotel Construction: A Case Study

  • Kayastha, Rujan;Kisi, Krishna P.
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.649-657
    • /
    • 2022
  • The COVID-19 pandemic has unprecedented impacts on different sectors around the globe. The effects observed in developing countries are even more severe. Some projects stopped while many have cost and time overrun issues. This paper conducted a case study on the COVID-19's effects on a hotel construction project in Nepal. The study reviewed the literature on COVID-19 and its impact on construction sectors and conducted a semi-structured interview with the project's personnel. The interview response was analysed and the contributing factors that impacted the project and its performance were identified. The paper found financial, operational, contractual, safety, and risk management issues in the hotel project. Overall, the project cost increased by 32% where the material cost increased by 35% and labor cost increased by 28%. This research discusses causes, measures, and provides a broad perspective of the problems, significant challenges, and opportunities associated with the effects of COVID-19 on the construction industry. The Owner as well as the Contractors incurred added costs because of COVID-19. The paper identified contributing factors and presented the challenges which could be used as opportunities to minimize unforeseen impacts of the pandemics in near future. The lesson learned from this case study was that the labor cost and materials cost could have been minimized if the Owner and the Contractor had established alternative resources such as using locally available labor, materials, and alternative suppliers.

  • PDF