• Title/Summary/Keyword: Construction Errors

Search Result 595, Processing Time 0.038 seconds

Sight Distance at Crest Vertical Curves Under Consideration of Construction Errors (볼록형 종단곡선에서 시공오차를 고려한 정지시거에 관한 연구)

  • Lee, Myeong-Han;Kim, Dong-Nyong
    • Journal of Korean Society of Transportation
    • /
    • v.23 no.8 s.86
    • /
    • pp.153-162
    • /
    • 2005
  • This study is carried out to evaluate the sight distance change due to construction errors of vertical crest curves. Various design speeds and grades as well as various size of construction errors are incorporated in this study. After showing theoretical methodology numerical results are compared and analysed for the given ranges of parameters. New vertical curve change rate(m/%) is suggested to guarantee minimum sight distance under construction errors. As to the results, the reduction of sight distance are $2.8{\sim}21.3m$ at 120km/h, $2.0{\sim}15.1m$ at 100km/h, $1.4{\sim}10.6m$ at 80km/h, $1.0{\sim}7.5m$ at 60km/h $0.5{\sim}3.9m$ at 40km/h. Vortical curve change rates need to be increased about $6{\sim}25%$ to provide minimum stopping sight distance according to design speed.

A Study on the Consideration for Factors Affecting Production Plan Establishment of Precast Concrete Members (PC부재의 생산계획 수립에 영향을 미치는 요인 고찰에 관한 연구)

  • Jun, Young-Hun;Shin, Eun-Young;Yun, Won-Gun;Kim, Kyong-Hoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.253-254
    • /
    • 2023
  • The production plan of Precast Concrete members is closely related to the assembly plan of Precast Concrete members, and is an important management factor for the process planning of Precast Concrete construction. This may cause a delay in the construction period due to manufacturing errors occurring in the production process of members and transportation errors according to the production sequence. Therefore, it is necessary to have an efficient production plan for Precast Concrete members that can produce the necessary quantity from the point of assembly of the members and supply them in a timely manner. This study is a basic study for establishing a production plan for Precast Concrete members, and the purpose of the study is to examine the factors that affect the establishment of a production plan for Precast Concrete members. In this study, the influencing factors according to the production method and conditions when establishing a production plan for Precast Concrete members were considered. In the future, correlation analysis among influencing factors will be carried out, and it is expected that it will be used as basic data for schedule management of Precast Concrete construction and derivation of construction period calculation standards.

  • PDF

Building a Machining Knowledge Base for Intelligent Machine Tools (지능공작기계를 위한 가공 지식의 지식베이스 구성 및 운영)

  • Lee, Seung-Woo;Lee, Hwa-Ki
    • Journal of the Korea Safety Management & Science
    • /
    • v.9 no.5
    • /
    • pp.79-85
    • /
    • 2007
  • Intelligent machines respond to external environments on the basis of decisions that are made by sensing the changes in the environment and analyzing the obtained information. This study focuses on the construction of a knowledge base which enables decision making with that information. Approximately 70% of all errors that occur in machine tools are caused by thermal error. In order to proactive deal with these errors, a system which measures the temperature of each part and predicts and compensates the displacement of each axis has been developed. The system was built in an open type controller to enable machine tools to measure temperature changes and compensate the displacement. The construction of a machining knowledge base is important for the implementation of intelligent machine tools, and is expected to be applicable to the network based intelligent machine tools which look set to appear sooner or later.

Development of a Medication Error Prevention System and Its Influence on Patient Safety Culture and Initiatives (투약오류예방 시스템 구축에 따른 환자안전문화와 환자안전행위계획)

  • Kim, Myoung-Soo;Kim, Hyun-Hee
    • Korean Journal of Adult Nursing
    • /
    • v.27 no.1
    • /
    • pp.1-10
    • /
    • 2015
  • Purpose: The objective of this study was to examine patient safety culture (PSC) and patient safety initiatives (PSI) according to IT-based medication errors prevention system which is constructed in this study, and to identify the relationships among system construction, perception to the usage, PSC and PSI. Methods: The subjects were 180 nurses who work at 12 different hospitals with over 300 beds. The questionnaire included the characteristics of participants, a system construction status, the perception to the usage using electric pharmacopoeia (EP), a drug dose calculation system (DDCS), a patient safety reporting system (PSRS) and a bar-code system (BS). The data were collected from July 2011 to August 2011. Descriptive statistics, ANOVA, Pearson correlation and MANOVA were used for data analysis. Results: Systems were constructed in participating hospitals; For EP and PSRS, 83.9%, DDCS, 50%, and BS, 18.3%. The perceptions on the usage of the system were marked highest in BS as 4.54 followed by EP as 3.85. There were significant positive correlations between PSI and EP construction (r=.17, p=.028); PSRS (r=.17, p=.028) and DDCS (r=.23, p=.002). Conclusion: The developed system for improving the user experiences and reducing medication errors was found out well accepted. It is hoped that the system is helpful for PSC and PSI improvement in clinical settings.

Analysis of influence factors on panelizing of free-form buildings (비정형 패널 분할 시 영향요인 분석)

  • Lee, Donghoon;Lim, Jeeyoung;Kim, Sunkuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.126-127
    • /
    • 2015
  • New technologies using a CNC machine to reduce the production cost of free-form buildings are being developed. To produce free-form members with such technologies, a vast free form building should be first divided into multiple panels that can be produced. Considering the curved surface of free-form buildings, the shape and size of divided freeform panels vary, which will lead to a great deal of errors. Currently, the engineers and designers complete the panelizing work through trials and errors even in large-scale projects, which results in increased construction duration and cost. Thus, it is necessary to develop a freeform panelizing technology to maximize the economic effects of free-form concrete member production technology. The purpose of the study is to analyze influence factors on panelizing of free-form buildings, which is a preceding research for development of a panelizing technology. The influence factors drawn will provide a core basis for development of panelizing technologies for free-form buildings.

  • PDF

Spatio-temporal dependent errors of radar rainfall estimate for rainfall-runoff simulation

  • Ko, Dasang;Park, Taewoong;Lee, Taesam;Lee, Dongryul
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2016.05a
    • /
    • pp.164-164
    • /
    • 2016
  • Radar rainfall estimates have been widely used in calculating rainfall amount approximately and predicting flood risks. The radar rainfall estimates have a number of error sources such as beam blockage and ground clutter hinder their applications to hydrological flood forecasting. Moreover, it has been reported in paper that those errors are inter-correlated spatially and temporally. Therefore, in the current study, we tested influence about spatio-temporal errors in radar rainfall estimates. Spatio-temporal errors were simulated through a stochastic simulation model, called Multivariate Autoregressive (MAR). For runoff simulation, the Nam River basin in South Korea was used with the distributed rainfall-runoff model, Vflo. The results indicated that spatio-temporal dependent errors caused much higher variations in peak discharge than spatial dependent errors. To further investigate the effect of the magnitude of time correlation among radar errors, different magnitudes of temporal correlations were employed during the rainfall-runoff simulation. The results indicated that strong correlation caused a higher variation in peak discharge. This concluded that the effects on reducing temporal and spatial correlation must be taken in addition to correcting the biases in radar rainfall estimates. Acknowledgements This research was supported by a grant from a Strategic Research Project (Development of Flood Warning and Snowfall Estimation Platform Using Hydrological Radars), which was funded by the Korea Institute of Construction Technology.

  • PDF

Application and Effects Analysis of BIM(Building Information Modeling) for Construction Management of a Construction Field (건축공사 현장의 공사관리를 위한 BIM (Building Information Modeling) 적용과 효과 분석)

  • Choi, Jaehyun;Ryu, Han-Guk
    • Journal of the Korea Institute of Building Construction
    • /
    • v.15 no.1
    • /
    • pp.115-121
    • /
    • 2015
  • As recent buildings have been enlarged and free-formed, it is hard to represent three-dimensional buildings with two-dimensional drawings and identify design errors, construction errors, difference of construction quantity and construction cost, clash with columns, beams, pipe machinery, and so on. In order to overcome the limitations, BIM(Building Information Modeling) has been used in construction industry. However, BIM in the construction site is not fully facilitated after practical implementation in process control including training, evaluation and analysis of the process. Therefore, in this study, the effect of BIM applied in the construction site is analyzed empirically throughout the survey at the construction site in accordance with the training, evaluation, and implementation of BIM.

Automatic Error Correction System for Erroneous SMS Strings (SMS 변형된 문자열의 자동 오류 교정 시스템)

  • Kang, Seung-Shik;Chang, Du-Seong
    • Journal of KIISE:Software and Applications
    • /
    • v.35 no.6
    • /
    • pp.386-391
    • /
    • 2008
  • Some spoken word errors that violate grammatical or writing rules occurs frequently in communication environments like mobile phone and messenger. These unexpected errors cause a problem in a language processing system for many applications like speech recognition, text-to-speech translation, and so on. In this paper, we proposed and implemented an automatic correction system of ill-formed words and word spacing errors in SMS sentences that has been the major errors of poor accuracy. We experimented three methods of constructing the word correction dictionary and evaluated the results of those methods. They are (1) manual construction of error words from the vocabulary list of ill-formed communication languages, (2) automatic construction of error dictionary from the manually constructed corpus, and (3) context-dependent method of automatic construction of error dictionary.

Analysis of Loss Costs and Risk Reserve due to Risk Events for Aircraft Runway Construction (활주로 건설공사의 위험사건에 따른 손실비용 및 위험예비비 분석)

  • Kang, Hyun Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.3
    • /
    • pp.25-35
    • /
    • 2022
  • The purpose of this study is to derive risk events that occurred during aircraft runway construction and analyze loss costs for project participants. For this purpose, design change data, contracted statement and completed statement were investigated. The results of this study are as follows: There were 12 risk events in the process of construction, 5 design errors and 7 construction errors. The increased construction costs due to such risk events were calculated as KRW 726 million. Of the KRW 726 million that was increased due to risk events, about 52.57% was spent by the ordering agency, and about 47.43% contractors. The increased construction costs due to such risk events are about 4.86% of the direct construction costs of KRW 14.9 billion. Based on the results derived from these case studies, a method for estimating reserve costs and construction costs considering risk events is presented.

Inter-comparison of Accuracy of Discharge Measurement Methods - A Case Study Performed in the Dalcheon River Downstream of the Goesan Dam- (유량측정 방법의 정확도 분석 -괴산댐 하류 달천 적용 사례를 중심으로-)

  • Lee, Chan-Joo;Kim, Dong-Gu;Kwon, Sung-Il;Kim, Won
    • Journal of Korea Water Resources Association
    • /
    • v.43 no.12
    • /
    • pp.1039-1050
    • /
    • 2010
  • Relative accuracy of six discharge measurement methods-velocity-area method, rod-float method, ADCP moving-vessel method, ADCP fixed-vessel method, electromagnetic wave surface velocimeter (EWSV), LSPIV- is evaluated by comparing discharges measured by them with dam released discharges. Data from 39 times of concurrent discharge measurement campaigns are analyzed. Except the rod-float method, measured discharges show absolute errors less than 6.2% with dam discharges. When the four methods is evaluated by being compared with discharges measured with the conventional velocity-area method, discharges with electromagnetic wave surface velocimetry shows 7.35% of absolute errors and other three methods shows absolute errors less than 6%. The rod-float method, which shows large discrepancy compared with dam and velocity-area method, need complementary verification.