지하층 합벽 무지주 시스템 거푸집의 적용성에 관한 연구 (A Study on the Applicability of Non-Supporting System Forms for Single Face Walls in Underground Construction)

  • 김재엽;안성훈;손영진
    • KIEAE Journal
    • /
    • 제8권2호
    • /
    • pp.87-92
    • /
    • 2008
  • Underground building constructions are recently more important because the ratio of underground area is increasing in the huge and high-rise building construction projects. For reducing the total building construction periods, it is required to reduce not only the over-ground structural work periods but also the underground structural work periods. Therefore, this study is proposed the non-supporting system forms for single face walls in underground building construction by one of the methods for reducing the underground structural work periods and investigated the applicability of the non-supporting system forms by analyzing the case-study in civil construction project. In regard of construction duration, the results of analyzing the case-study showed that the non-supporting system forms are better than the euro forms with soldier system for single face walls in underground building construction. In addition, it is showed that the cost of these two forms is similar and usage the working space and safety in non-supporting system forms are better that those of the euro forms with soldier system, too.

Rebar Fabrication Process in Both Field Processing and Factory Processing for Adopting Lean Construction

  • Yun, Seok-Heon;Kim, Sang-Chul
    • Architectural research
    • /
    • 제15권3호
    • /
    • pp.167-174
    • /
    • 2013
  • Due to increasing competition of construction companies, it is required to optimize the management of construction projects and "lean" concepts are rapidly spreaded in construction industry. Steel work accounts for a large proportion in construction work, and a variety of attempts to efficiently perform steel work has currently made. And since rebar (Engineer-to-Order) can be engineered through design once order is placed, it gives the great impact on construction, thus, entire management is required. The purpose of this study is to present the method to increase the efficiency of field processing method of steel work in terms of lean construction. Once we examine process of steel work and identify the flow, we would like to analyze which processes should be improved through value analysis approach and present the improvement plans. Also, this study examines cases of field processing and factory processing, and it identifies the waste factors in the procurement process. Finally, this study would like to present the result of analysis from the perspectives of value. The rebar delivery process is divided into several steps and the duration of every step is surveyed. Using duration data, VAT (Value added time) can be calculated for analyzing the efficiency of the process.

공동주택 공사에서의 건축 외관용 PC 활용에 따른 생산성 향상 분석 (Verification of the Use of Architectural PC for Improving the productivity in an Apartment Housing Project)

  • 이현석;이상효;안병주;이윤선;김재준
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2007년도 정기학술발표대회 논문집
    • /
    • pp.670-673
    • /
    • 2007
  • 최근 국내 건설 산업에서 생산성과 건설공기 측면에서 문제점이 드러나고 있으며 또한, 국내 건설 산업의 생산성과 공기 경쟁력이 선진국에 비해 매우 낮은 것으로 분석되었다. 여기에 주5일 근무제가 시행된다면 문제는 더 심각해진다. 또한, 현재 입법 예고된 후분양제도가 실행된다면 건설사 입장에서는 공기 단축을 위한 생산성 향상이 건설업의 생사가 달린 일이다. 이에 본 연구에서는 생산성 향상을 위한 방안으로 PC의 한 종류인 건축 외관용 PC를 제시하고, 건축 외관용 PC를 사용하는 방안을 기존의 공법과 비교를 통해 생산성이 향상 되는가를 분석하고자 한다.

  • PDF

기계적 학습의 알고리즘을 이용하여 아파트 공사에서 반복 공정의 효과 비교에 관한 연구 (Identifying the Effects of Repeated Tasks in an Apartment Construction Project Using Machine Learning Algorithm)

  • 김현주
    • 한국BIM학회 논문집
    • /
    • 제6권4호
    • /
    • pp.35-41
    • /
    • 2016
  • Learning effect is an observation that the more times a task is performed, the less time is required to produce the same amount of outcomes. The construction industry heavily relies on repeated tasks where the learning effect is an important measure to be used. However, most construction durations are calculated and applied in real projects without considering the learning effects in each of the repeated activities. This paper applied the learning effect to the repeated activities in a small sized apartment construction project. The result showed that there was about 10 percent of difference in duration (one approach of the total duration with learning effects in 41 days while the other without learning effect in 36.5 days). To make the comparison between the two approaches, a large number of BIM based computer simulations were generated and useful patterns were recognized using machine learning algorithm named Decision Tree (See5). Machine learning is a data-driven approach for pattern recognition based on observational evidence.

모바일 기술을 이용한 마감공사의 작업간섭 관리 (Process Interference Management for Finish Works using Mobile Technology)

  • 고용호;한승우
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2017년도 춘계 학술논문 발표대회
    • /
    • pp.35-36
    • /
    • 2017
  • The finish works of construction projects comprises approximately 40% of the total construction duration. Thus, the management of finish works have as big as impacts on total project duration as the earthworks, foundation and structure works. Process interference management is considered one of the most important issues dealt during finish works. However, it was investigated that effective management systems have yet not been applied for practical use. Accordingly, this paper suggests a mobile technology based finish works management system that mainly focuses on preventing process interference occurred due to ineffective communication between general and sub-contractors.

  • PDF

초고층 거푸집 공사의 시공성 검토를 위한 3D Printing의 활용 (Application of 3D Printing Technology for Formwork Constructability Review in Tall Building Construction)

  • 이준혁;이동민;조훈희;강경인
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2016년도 추계 학술논문 발표대회
    • /
    • pp.69-70
    • /
    • 2016
  • The constructability of formwork has a significantly influence on the duration and cost in tall building construction. However, current installation and dismantling process are conducted with heuristic approaches due to the absence of reasonable constructability review method. This study proposes a new method to review the constructability of formwork by utilizing 3D printing technology. It is expected that the suggested review method could reduce formwork duration and cost with subjective, but rational manner.

  • PDF

Industrialized Building Systems for the Kingdom of Saudi Arabia

  • Santoso, Try P.;Trigunarsyah, Bambang;Hassanain, Mohammad A.;Tuffaha, Firas
    • 국제학술발표논문집
    • /
    • The 7th International Conference on Construction Engineering and Project Management Summit Forum on Sustainable Construction and Management
    • /
    • pp.73-79
    • /
    • 2017
  • Rapidly expanding population in the Kingdom of Saudi Arabia has a massive impact to put pressure on the shortage of housing and existing infrastructure. With average population growth rate of 1,9% yearly, the population in Saudi Arabia is projected to increase from 31 million in 2015 to 37 million in 2025. According to the housing ministry, Saudi Arabia needs to provide 3.3 million units to meet the demand in 2025, which is about 300,000 unit a year. In the past 40 years, using the conventional construction method, the Saudi construction industry was only able to build about 150,000 units per year. To meet the demand gap for the housing shortage, a new approach and innovation in construction methods are needed. Industrialized construction as an approach in construction methods has been studied and implemented in some countries that experienced similar corncerns. Industrialized construction can be defined as the implementation of manufacturing methods to construction-related activities to improve quality, reduce cost and project duration. Compared to the conventional construction method, prefabrication as industrialized construction methods has reduced construction labor on-site by 9.5%, construction project duration by 20%, and construction waste by 56%. It improves the quality, durability and cost saving not only for construction project owners, but also construction contractors. This paper discusses the possibility of 'industrialization' of building system in the Kingdom of Saudi Arabia as a solution for the housing shortage. It is an initial part of a study aims to develop a framework to develop industrialized building system in the Kingdom of Saudi Arabia. The is paper based on extensive literature review and case studies.

  • PDF

공정관리를 위한 PERT/CPM 활용에 관한 연구 (A Study on an application of PERT/CPM for process Management)

  • 이종철;강규철
    • 산업경영시스템학회지
    • /
    • 제6권9호
    • /
    • pp.7-18
    • /
    • 1983
  • In this paper, I have approached the problem of scheduling that can be reasonably cost down and duration down in the tenement house by using PERT/CPM technics. The tenement house of 'M' construction company consistute 78 element workings in total. I made out the net-work scheduling through 78 element workings, after calculating by computer, G-COS 101, I reduced the duration and cost by MCX, and then enforced from the least cost slope to six times. Resulty, I attained PERT/CPM scheduling for construction scheduling ; a) Make Possible the effectiveness budgeting control b) How the scientific materials c) Make possible the reasonably decision making d) Strengthen the material control by relevance of element workings e) Make possible the duration down through the least cost.

  • PDF

FORECASTING THE COST AND DURATION OF SCHOOL RECONSTRUCTION PROJECTS USING ARTIFICIAL NEURAL NETWORK

  • Ying-Hua Huang ;Wei Tong Chen;Shih-Chieh Chan
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.913-916
    • /
    • 2005
  • This paper presents the development of Artificial Neural Network models for forecasting the cost and contract duration of school reconstruction projects to assist the planners' decision-making in the early stage of the projects. 132 schools reconstruction projects in central Taiwan, which received the most serious damage from the Chi-Chi Earthquake, were collected. The developed Artificial Neural Network prediction models demonstrate good prediction abilities with average error rates under 10% for school reconstruction projects. The analytical results indicate that the Artificial Neural Network model with back-propagation learning is a feasible method to produce accurate prediction results to assist planners' decision-making process.

  • PDF

중수로형(重水爐形) 원자로 건물의 Open Top시공공법 (The Open Top Construction Method for the PHWR Reactor Building)

  • 이수득
    • 기술사
    • /
    • 제34권3호
    • /
    • pp.41-45
    • /
    • 2001
  • The nuclear power plant(NPP) construction is a mammoth project, which requires a huge construction budget and the long construction duration of about 7 years. Recently there is a trend to shorten the construction period, to save the construction cost and to ensure the competitiveness through adopting the open top construction method. In this method, the major equipment are moved into the building through its top, and the internal works of the reactor building are being in process without installation of a dome roof.

  • PDF