1 |
Couto, J., & Teixeira, J. (2005). Using linear model for learning curve effect on highrise floor construction. Construction Management and Economics, 23(4), pp. 355-364.
DOI
|
2 |
Cunningham, J. A. (1980). Management: Using the learning curve as a management tool: The learning curve can help in preparing cost reduction programs, pricing forecasts, and product development goals. Spectrum, IEEE, 17(6), pp. 45-48. doi: 10.1109/MSPEC.1980.6330359
DOI
|
3 |
Damci, A., Arditi, D., & Polat, G. (2013). Resource Leveling in Line-of-Balance Scheduling. Computer-Aided Civil and Infrastructure Engineering, 28(9), pp. 679-692.
DOI
|
4 |
Fan, S.-L., Tserng, H. P., & Wang, M.-T. (2003). Development of an object-oriented scheduling model for construction projects. Automation in Construction, 12(3), pp. 283-302. doi: http://dx.doi.org/10.1016/S0926-5805(02)00092-4
DOI
|
5 |
Gordon, J., & Tulip, A. (1997). Resource scheduling. International Journal of Project Management, 15(6), pp. 359-370. doi:http://dx.doi.org/10.1016/S0263-7863(96)00090-7
DOI
|
6 |
Hallberg, D., & Tarandi, V. (2011). On the use of open bim and 4d visualisation in a predictive life cycle management system for construction works. Electronic Journal of Information Technology in Construction, 16, pp. 445-466.
|
7 |
Halpin, D. W. (1973). An investigation of the use of simulation networks for modeling construction operations. University of Illinois at Urbana-Champaign.
|
8 |
Halpin, D. W. (1990). MicroCYCLONE user's manual. Division of Construction Engineering and Management, Purdue University, West Lafayette, Indiana.
|
9 |
Hariga, M., & El-Sayegh, S. (2011). Cost Optimization Model for the Multiresource Leveling Problem with Allowed Activity Splitting. Journal of Construction Engineering and Management, 137(1), pp. 56-64. doi: doi:10.1061/(ASCE)CO.1943-7862.0000251
DOI
|
10 |
Hijazi, A. M., AbouRizk, S. M., & Halpin, D. W. ( 1992). Modeling and simulating learning development in construction. Journal of Construction Engineering and Management, 118(4), pp. 685-700.
DOI
|
11 |
Hossein Hashemi Doulabi, S., Seifi, A., & Shariat, S. (2011). Efficient Hybrid Genetic Algorithm for Resource Leveling via Activity Splitting. Journal of Construction Engineering and Management, 137(2), pp. 137-146. doi: doi:10.1061/(ASCE)CO.1943-7862.0000261
DOI
|
12 |
Jarkas, A., & Horner, M. (2011). Revisiting the applicability of learning curve theory to formwork labour productivity. Construction Management & Economics, 29(5), pp. 483-493. doi: 10.1080/01446193.2011.562911
DOI
|
13 |
Kalk, A., & Douglas, S. A. (1980). INSIGHT: Interactive simulation of construction operations using graphical techniques: Stanford University, Department of Civil Engineering.
|
14 |
Lluch, J. F. (1981). Analysis of construction operations using microcomputers.
|
15 |
Lu, W., Peng, Y., Shen, Q., & Li, H. (2013). Generic Model for Measuring Benefits of BIM as a Learning Tool in Construction Tasks. Journal of Construction Engineering and Management, 139(2), pp. 195-203. doi: doi:10.1061/(ASCE)CO.1943-7862.0000585
DOI
|
16 |
Lucas, J., Bulbul, T., & Thabet, W. (2013). An object-oriented model to support healthcare facility information management. Automation in Construction, 31(0), pp. 281-291. doi: http://dx.doi.org/10.1016/j.autcon.2012.12.014
DOI
|
17 |
Lutz, J. D., Halpin, D. W., & Wilson, J. R. (1994). Simulation of learning development in repetitive construction. Journal of Construction Engineering and Management, 120(4), pp. 753-773.
DOI
|
18 |
Roy, P. (1992). Principles of Construction Management: Mc Graw Hill Book Company Europe.
|
19 |
Malaikrisanachalee, S., & Vathananukij, H. (2011). INTEGRATION OF JAVA-BASED BIM WITH SPATIAL DATABASE. International Journal of Civil Engineering, 9(1), pp. 17-22.
|
20 |
Panas, A., & Pantouvakis, J. (2014). Simulation-Based and Statistical Analysis of the Learning Effect in Floating Caisson Construction Operations. Journal of Construction Engineering and Management, 140(1), 04013033. doi:doi:10.1061/(ASCE)CO.1943-7862.0000782
DOI
|
21 |
Singh, V., Gu, N., & Wang, X. (2011). A theoretical framework of a BIM-based multi-disciplinary collaboration platform. Automation in Construction, 20(2), pp. 134-144. doi: http://dx.doi.org/10.1016/j.autcon.2010.09.011
DOI
|