• Title/Summary/Keyword: Construction Drawings

검색결과 362건 처리시간 0.025초

16세기 전기 단령의 구성법 일례 -김흠보(1461-1528) 분묘 출토의 단령을 중심으로- (A Case Study of Dan-Ryung Construction in Early 16th Century -Based on the Shrouds from Excavated Tomb of Kim, Heum Jo-)

  • 이은주
    • 복식문화연구
    • /
    • 제6권2호
    • /
    • pp.127-140
    • /
    • 1998
  • A study on the construction of Dan-Ryung in the early 16th century based on the shrouds from excavated tomb of Kim, Heum-Jo(1461-1528) is reported in this paper. This study is aimed at establishing database for a traditional Korean costume construction and emphasizing the necessity for development of methodology in writing report from excavated costume including measuring, construction methods and materials. This paper includes examples of measured length for each part of 'Dan-Ryung', reconstructured drawings, pictures, and construction methods. The followings on the construction of Dan-Ryung in the early 16th century are found in this study: 1) Dan-Ryung robes were made of less expensive hemp, cotton, silk & cotton, and ramie & silk. 2) As a whole, Dan-Ryung was lengthy and spacious and it had straighter and narrower sleeves when compared to the ones from the late Chosun. 3) There existed Moo which was large rectangular guest with double pleats at Dan-Ryung's side seam. Its round collar was constructed with a 3 cm width bias. Ball buttons on the outer collar and loops on the right shoulder are attached. 4) There existed a pair of indirectly attached slim and short strings. Inside string is directly attached. 5) Inside of the shoulder, a U-shaped shoulder pad made of the same cloth as the inner cloth was attached. hand sewing methods used include delicate flat-felled seam stitch, back-stitch and sew-up stitch.

  • PDF

Applications of bridge information modeling in bridges life cycle

  • Marzouk, Mohamed M.;Hisham, Mohamed;Al-Gahtani, Khalid
    • Smart Structures and Systems
    • /
    • 제13권3호
    • /
    • pp.407-418
    • /
    • 2014
  • The purpose of this paper is to present an Integrated Life Cycle Bridge Information Modeling that can be used throughout different phases of the bridge life cycle including: design, construction, and operation and maintenance phases. Bridge Information Modeling (BrIM) has become an effective tool in bridge engineering and construction. It has been used in obtaining accurate shop drawings, cost estimation, and visualization. In this paper, BrIM is used as an integrated tool for bridges life cycle information modeling. In the design phase, BrIM model can be used in obtaining optimum construction methods and performing structural advanced analysis. During construction phase, the model selects the appropriate locations for mobile cranes, monitors the status of precast components, and controls documents. Whereas, it acts as a tool for bridge management system in operation and maintenance phase. The paper provides a detailed description for each use of BrIM model in design, construction, and operation and maintenance phases of bridges. It is proven that BrIM is an effective tool for bridge management systems throughout their life phases.

시공단계 현장 Mock-up의 BIM 기반 시뮬레이션 기법 적용에 의한 기대효과 분석 연구 (Study on Substitution Effect caused by Application of BIM Simulation System to Mock-up Site)

  • 장세준;윤석헌;백준홍
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2008년도 춘계 학술논문 발표대회
    • /
    • pp.147-151
    • /
    • 2008
  • Construction project is completed through several stages and problems of each stage affect directly not only now but also next. Defect of 2D drawings influence in construction phase, and it make many loss on project. Nowadays we practically use real Mock-up test in construction sites to solve the problems. But it also has many problems which are waste much money and time. Therefore, this study tries to analyze effect that is occurred by appling BIM Mock-up simulation instead of real Mock-up execution. These analysis is conducted by comparing two construction building site. These have same shape but one is made for BIM Mock-up, and another is real Mock-up. Comparison points of view are cost, time and operator's satisfaction. It is expect that BIM Mock-up is more effective at low cost and on shorter time. But our analysis show that each are conducted different part of function. So new Mock-up type is required. Hybrid Mock-up is combine real mock-up with BIM simulation and it can minimize risk of project.

  • PDF

도로평가를 위한 인터넷 VR 시스템 구축 (The Construction of Internet Virtual Reality System For Highway Estimation)

  • 강인준;최현;한병철;이병걸
    • 한국측량학회:학술대회논문집
    • /
    • 한국측량학회 2004년도 추계학술발표회 논문집
    • /
    • pp.367-372
    • /
    • 2004
  • Highway have to be constructed under thorough investigation about function, economy, safety of the traffic and environment, because they are needing huge budget for construction and management as important facilities of the social overhead capital in the national economics. Initially the construction of roads becomes effective the plan, the design, construction phase. The design is foundation of accomplishment of the roads operation, the results of the design operation come to much effect a nation when using roads. Especially ancient design methods were not expected for visual effects as attaching weight to 2-dimensional drawing from flat. Therefore, it is difficult to recognize troubles happened during the work operation besides, many troubles are solved by modification of drawings as situations. For solving of those of the problems, it is emphasize on visual effect through introduction of 3-dimensional design from the initial phase. In case of national conditions, limited national land has caused increasing weight for construction of the roads through cities as the urban centered development. thereupon, citizens are increasing concern about the right of the light and the environmental effect, road designs and construction of the structures under agreement with local residents cause to make troubles. The analysis of 3-dimensional design is necessary as intermediation for decision making. In this study, Virtual reality techniques in 3-dimensional roads design are expected to visual effect on the publishing Internet Web, find problems in first phase and make decision between users and people having civil appeal.

  • PDF

이미지 기반 건설현장 수치 측정 모델 기초연구 (Preliminary Study for Image-Based Measurement Model in a Construction Site)

  • 윤세빈;강민균;김창원;임현수;유위성;김태훈
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.287-288
    • /
    • 2023
  • The inspection work at construction sites is one of the important supervisory tasks, which involves verifying that the building is being constructed by the numerical values specified in the design drawings. The conventional measuring method for inspection involves using tools or equipment such as rulers directly by the personnel at the site, and it is usually confirmed by vision. Therefore, this study proposes an model to measure numerical values on images of the construction site. Through the case study to measure the installation interval of jack supports, the proposed algorithm was verified the effiect and validity. The results of this study suggest that it can support inspection work even in the office, which may have been overlooked by on-site inspectors, and contribute to the digitization of inspection work at construction sites.

  • PDF

무인순찰로봇 활용 데이터 기록 자동화를 위한 메타데이터 정의 및 시스템 구축 (Metadata design and system development for autonomous data survey using unmanned patrol robots )

  • 정남철;이기륜;노현주
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 가을학술발표대회논문집
    • /
    • pp.267-268
    • /
    • 2023
  • Unmanned patrol robots are currently being developed for autonomous data survey in construction sites. As the amount of data acquired by robots increases, it is important to utilize proper metadata and system to manage data flow. In this study, we developed three materials, metadata design, robot system and web system, in the purpose of automating construction site data survey using unmanned patrol robots. The metadata was mainly designed to represent when and where raw data was acquired. To identify the location of data acquired, localization data from SLAM algorithm was converted to suit the construction drawings. The robot system and web system were developed to generate, store and parse the raw data and metadata automatically. The materials developed in this study was adopted to Boston Dynamics SPOT, a quadruped robot. Autonomous data survey of 360-picture and environment sensor was tested in two construction sites and the robot worked as intended. As a further study, development on the autonomous data survey to improve the convenience and productivity will be continued.

  • PDF

롱샹 성당의 설계 변형 과정 연구 (A Study on the Transformation in Design Process of Ronchamp Chapel)

  • 이정규
    • 건축역사연구
    • /
    • 제8권1호
    • /
    • pp.81-94
    • /
    • 1999
  • This Study aims at searching the meanings in the creative process of Ronchamp chapel by analyzing the drawings of the site, plan, section and elevation in chronological order. The origins of his architectural creation are identifying with the site(memories of Acropolis), analogies of crab shell, air plane wing and hydraulic dams. The architect informed himself about the site ,the tradition of pilgrimage associated with the place, and its devotion to the Holy Virgin; he looked into the rituals of the Catholic religion, spoke with ecclesiastics; he studied and annotated a monograph devoted to the site of Ronchamp. Also ,the plan required that it be possible to collect rainwater, since such was rare on the hill. In the first design phase, overall conception of building was carried out in the sketches and drawings from June 1950 to November 1950. The second phase in the elaboration of the project was from January 1951(at which time preliminary project was presented to the Commission of Holy Art) to April 1953. The modifications made were in response to opinions expressed by the patrons. The building moved to east and gargoyle moved to west, then, the elevations of north and west were changed. He designed the artificial land and bell tower from the first phase even after the beginning of construction ,he wanted them to be built .But they were not constructed, so the outer space for rituals of religion had no tension. I concluded that Le Corbusier had gifted ability and efforts to create spontaneous birth(after incubation) of the whole work, and the execution of drawings itself. He devoted himself to accomplish the project in spite of the change in situation or by clients.

  • PDF

노반, 궤도분야 철도인프라 BIM 원형 라이브러리 구축 (A Development of Railway Infrastructure BIM Prototype Libraries for Roadbed and Track)

  • 박형진;서명배
    • 한국전산구조공학회논문집
    • /
    • 제30권5호
    • /
    • pp.461-468
    • /
    • 2017
  • BIM 설계에서 라이브러리의 구축 및 활용은 매우 중요하다. 기존 컨텐츠의 재활용이 가능하므로, 설계를 보다 효과적이고 효율적으로 진행할 수 있다. 건축분야와 달리 토목분야, 특히 철도시설분야에서는 라이브러리의 구축 및 표준화가 미진하다. 따라서 본 연구에서는 철도시설분야에 3차원 객체 라이브러리를 구축하고 표준화하고자 한다. 철도시설물 분류체계 및 관련도면을 수집 및 분석한다. 분석된 표준도면의 항목과 분류체계 항목을 매칭하였다. 각 항목별로 라이브러리가 필요한지 여부와 그럴 경우 어떤 소프트웨어가 적절한지를 검토하였다. 사용가능한 소프트웨어는 주로 Civil 3D와 Revit 등으로 나타났다. 향후 이를 바탕으로 철도인프라 3차원 라이브러리의 속성 항목 및 명세서를 설계하고 라이브러리를 구축할 예정이다.

속성이 부여된 2차원 엔터티 그룹을 이용한 로터의 3차원 모델 및 도면 생성 (Generation of 3D Model and Drawing of Rotor Using 2D Entity Groups with Attributes)

  • 김영일
    • 한국기계가공학회지
    • /
    • 제18권8호
    • /
    • pp.91-97
    • /
    • 2019
  • A method for generating 3D solid models and drawings for a rotor in the steam turbine is proposed. One of the most important design steps is generating the drawing for manufacturing it. This step is a very routine and time-consuming job because each drawing is composed of several kinds of views and many dimensions. To achieve automation for this activity, rotor profiles are composed of 2D entity groups with attributes. Based on this, the improved design process is developed as follows. First, the rotor profiles can be selected by searching for 2D entity groups using the related attributes. Second, the profiles are connected sequentially so that an entire rotor profile is determined. The completed profile is used to generate 2D drawings automatically, especially views, dimensions, and 3D models. The proposed method is implemented using a commercial CAD/CAM system, Unigraphics, and API functions written in C-language and applied to the rotor of steam turbines. Some illustrative examples are provided to show the effectiveness of the proposed method.

저고도 근접 항공영상을 이용한 현장정보관리 (Management of Construction Fields Information Using Low Altitude Close-range Aerial Images)

  • 조영선;임노열;정우수;정성혁;최석근
    • 한국측량학회지
    • /
    • 제32권5호
    • /
    • pp.551-560
    • /
    • 2014
  • 다른 산업현장에 비해 토목 시공현장은 작업 공정이 길고 복잡하여 준공시까지 종합관리 및 공정관리, 품질관리가 어렵고 많은 문제점이 발생하고 있다. 본 연구는 토목 시공현장의 상황을 종합적으로 관리하고 현장정보를 상시 모니터링하기 위하여 무인항공사진측량, GPS측량 등을 활용하여 3차원 공간정보를 신속, 정확하게 처리하고, 주요설계, 시공도면 및 공정, 공사비 등을 언제, 어디서든 관리 및 분석하며 시공현장을 종합적으로 관리, 파악할 수 있는 자료를 제공하는데 목적이 있다. 토목 시공현장의 계획에서 준공까지 공정관리, 공사진행 확인 등 빠른 의사결정을 위한 최신의 정보를 제공할 수 있고, 고해상도 3차원 공간정보와 설계도면을 중첩하여 객관적으로 현장상황을 판단할 수 있으며, 현황도, 종 횡단면도를 제작하여 토적표, 내역서, 지반고 변화 등 각종 자료를 신속하게 제공하였다.