• Title/Summary/Keyword: Construction Detail

Search Result 770, Processing Time 0.022 seconds

Application of Digital Mock-Up Technology for Detail Design and Construction of Bridge (교량 상세 설계 및 시공을 위한 DMU 기술 적응 방안 연구)

  • Lee, Yoon-Bum;Kim, Min-Seok;Lee, Kwang-Myong;Shin, Hyun-Yang;Park, Kyoung-Lae
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2007.04a
    • /
    • pp.277-282
    • /
    • 2007
  • In recent years, dramatic advances in information technology have motivated the construction industry to improve its productivity. Most construction companies are trying to utilize some new information technologies for enhancing the structure quality, shortening construction time, and reducing the construction cost. Digital Mock-Up (DMU) technology utilizes 3D CAD/CAM system that shows the shape of a structure on the computer screen. By modeling and assembling the structure in 3D dimensional environments, some errors in design can be found before or during construction. In this paper, DMU technology was applied to the detail design and construction of In-Cheon Bridge and its effectiveness was evaluated. All components of a PSC box girder segment were modeled and assembled by using of 3D CAD tools and then, some interferences between components and errors were found and revised appropriately before construction. Consequently, DMU technology would improve the quality of the structure and reduce time and cost for construction.

  • PDF

A Study on Information Systematization of Detail Drawings for Connectivity between BIM Libraries and Technical Contents based on Information Framework (BIM 라이브러리-기술콘텐츠 연계를 위한 정보프레임워크 기반의 정보 체계화 연구-부분상세를 중심으로)

  • Jo, Chan-Won
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.10
    • /
    • pp.54-60
    • /
    • 2016
  • Building information modeling (BIM) has the advantage of having been utilized for various scenarios through a single model. Although extracting 2D drawings from BIM is one of the advantages, there are many difficulties when utilized in practical work. Architectural detail drawings are an important factor for expressing interior finishing materials and complicated construction methods, as well as for cost estimations. However, creating detail drawings does not have a standard, and each design company establishes its own detail drawings, so it is hard to share or exchange information in the construction industry. Therefore, this study suggests a systemized method for making detail drawings, and explains how it can be utilized as back data for quantity take-off and construction expenses linked with BIM libraries.

A Study of Practical Room Composition for Interior Site Adaptation (인테리어현장 적응을 위한 실기실 구성에 관한 연구)

  • 박의정
    • Korean Institute of Interior Design Journal
    • /
    • no.40
    • /
    • pp.3-9
    • /
    • 2003
  • Today the social concern about Interior Design gradually requires wide comprehension. Also according to demanders' requirement. Colleges cope with speed. Interior Design made by experts for the function and purpose in the conception of decoration. Therefore, Colleges are responsible to educate for more capable professional designers. But management is the first concern for Interior Design Company students are going to work at. Interior Design has not the important state yet in Korea, it is hard to manage the company with only design works on the table. As architectural design side must get some admission, design is apart from construction. but they are worked together in Interior Design. Also, as the architectural design with process detail drawings, interior design is required the detail design for construction. But it is the facts that the college is interested in and concentrated on rather education for design and space plan than intensive education for construction because of the restricted environment of practice room. I propose component and practical use of nude construction department to understand detailed design.

The basic study of the detail development of the Wall-type APT joint using Slip Form and Deck plate. (Slip Form과 Deck Plate를 채용한 벽식 APT의 접합부 Detail개발의 기초적 연구)

  • Lee, Hee-Doo;Park, Shin;Lim, Nam-Gi
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2003.05a
    • /
    • pp.127-132
    • /
    • 2003
  • The purpose of current study is about how to construct wall-type APT in slip form and Deck plate applied different connection of materials that wall and slab. A proposal construct's solution is using the continuous a binding string that the main of contents are slab or stairs which horizon structure part construction is joined the vertical structure part, new we Proposed of 2 solution that new technology development. We'll suggest that the development is in the construct of higher stories APT more better other construction method. We expect that the new method is good but we have many things to solute themes. Thus, we decided that this development contents are needed that correct structural investigation and constructor's security of speciality and through a fact construct, correct verification.

  • PDF

Development of Technical Breakdown Structure Standard in Temporary Works (건설가설공사의 표준기술분류체계 구축)

  • Park, Jun-Mo;Kim, Ok-Kyue;Park, Gil-Bum
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.162-163
    • /
    • 2013
  • A temporary work are lifting equipment that tower crane or lift, and temporary architectures that office building and storage in construction site. And it is main construction work that built and used temporarily like to a scaffolding, a walk plate, and a formwork. This study is to adjust breakdown structure of temporary work to introduce technical tendency. With a site manager, it is collected a detailed statement and compared. As a result to break down a tendency that temporary equipment, additional function, and direct work of temporary technique, first, existing detail technical indexes that group I, group J, group K, and group L are classified. Second, due to set up and manage to main agents in case of existing detail technical indexes that B1, B2, it is not wrong to classify. But, it is somewhat different, and therefore adjust it to same level. Finally, as a technical tendency that temporary equipment, additional function, and direct work of temporary technique, it is adjusted the others.

  • PDF

A System Development for Management of On-the-spot Using the Event Management Theory (EVENT 관리기법을 응용한 건설현장관리시스템에 관한 연구)

  • Yoon, In;Jeong, Chang-Won;Choi, Young-Sik;Yoon, Min
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.2 no.1
    • /
    • pp.113-119
    • /
    • 1999
  • In order to accomplish either information system with future estimate or scientic management, application package of integrated detail management is required for Construction Company. The application package of integrated detail management is based on management of estimation, management of account. management of tax bill, management of on the spot, management of equipment and management of labor. This research focuses on the basic survey for this system such as circumstance of information system for construction company, a barrier of progress, development dirction, development article.

  • PDF

A Study on the Architectural Characteristics of Jogeongdan Examined through Construction-Related Records (영건(營建) 관련 자료를 통해 본 조경단(肇慶壇)의 건축특성)

  • Ahn, Seon-Ho
    • Journal of architectural history
    • /
    • v.32 no.5
    • /
    • pp.59-68
    • /
    • 2023
  • Jogyeongdan is an altar built by the Korean Empire within the burial grounds of Sijomyo(始祖墓), the Jeonju Lee clan, as a part of their posthumous respecting project. This site adheres to strict rules and formalities that are comparable to those of the royal tombs of the Joseon Dynasty, with its altars and monument House demonstrating construction techniques that hold high value in architectural history. This study compares and analyzes construction-related records such as Uigwe, Statements, and Figure, along with their historical context. Through this effort, the study explores in detail the original form of Jogyeongdan at the time of its construction and subsequent transformations in later periods. Findings showed that the Figure was drawed by Chae Yongsin and was only a blueprint prior to the construction; it was modified during the actual construction process. A part of Jogyeongdan project was carried out by demolishing four government office buildings that were closed because of the Gabo Reform in order to secure wood and roof tiles, among other materials. Additionally, concluded the Jaesil was by relocated Deokryudang from Samryeyeokcham. Further, instances of distinctive terminology usage were found related to construction materials in the Jogyeongdan Uigwe, which were not used in another Uigwe. These terms were distinguished in detail according to the locations in which the materials were used.

A Study on Risk Factor Analysis of Construction Scaffold Installation (건설비계 설치작업의 위험요인 분석에 관한 연구)

  • Kim, Kyong-Hoon;Boo, Yoon-Seob
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.11a
    • /
    • pp.189-190
    • /
    • 2019
  • Designers and builders are omitting structural design and relying on workers' experience, due to the lack of awareness of the importance of scaffolding in domestic construction sites, and there is a high probability of collapsing accidents such as inappropriate wall joint installation and non-compliance with work procedures. Therefore, risk factors were analyzed in detail and major risk factors were derived from opinions of site managers and scaffolding experts in this study.

  • PDF

Study on Process Management Methodology of Geographic Information Database Construction (지리정보 데이터베이스 구축공정 관리방법론 연구)

  • 최병길;김성수
    • Proceedings of the Korean Society of Surveying, Geodesy, Photogrammetry, and Cartography Conference
    • /
    • 2003.10a
    • /
    • pp.257-262
    • /
    • 2003
  • This study is aimed to research the management methodology for the process of GIS database construction. In general, used methodologies are made for the purpose of application program development. And the methodologies reflected GIS characteristics are also applied for GIS software development. But the software methodologies are never introduced to construction of GIS database. In this study, various common methodologies are investigated and analyzed, and the methodology which include the characteristic of GIS database construction process as work steps and detail paths is developed and suggested.

  • PDF

A Study on the LOD(Level of Detail) Model for Applications based on Indoor Space Data (실내공간 데이터 기반의 응용 서비스를 위한 세밀도 모델에 관한 연구)

  • Kang, Hye-Young;Lee, Jiyeong
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.32 no.2
    • /
    • pp.143-151
    • /
    • 2014
  • As the interest in indoor space increases, the demands for various services based on indoor space is increasing. With the demands, to construct spatial information for indoor space is also required, but there is not defined the LOD(Level of Detail) for indoor spatial data. Therefore, in this paper we classified data for indoor space data construction, and then we defined the accuracy and detail about the level of detail to provide suitable application services according to the type and representation method of each data. Most previous researches are focus on the geometrical representation, but in this paper we define a indoor LOD model based on type and representation method of data. In addition, we present applicable services with proposed LOD model and suggest a guideline for construction and application of indoor space.