• Title/Summary/Keyword: Construction Criteria

Search Result 1,690, Processing Time 0.047 seconds

An Analysis of the Conditions for Construction Supervision Fee (책임감리 용역 대가의 실태 분석 연구)

  • Choi, Sun-Hee;Choi, Hye-Mi;Lee, Jae-Young;Kim, Young
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.283-288
    • /
    • 2007
  • As constructions are changing variously from the size and efficiency, the role of supervision services tend to reach beyond mere monitoring or supervision to prevent fraudulence, but tend to extend toward a system that manages all the stages of the construction industry. There are growing demand to improve government operated corporation systems to secure high quality public facilities, and reviews on construction supervision system and supervision services roles, function, responsibility and obligations have been the topics among advanced researchers. However, the circumstance is that researches on the construction supervision service compensation and supervision services assignment criteria that serve as basis of such construction supervision system improvement are insufficient, and for practical development of construction supervision system, researches on construction supervision service compensation and supervision services assignment criteria will need to precede. Hence, this research purports to propose improvement directions of construction supervision system by deducing problems through condition survey on the construction supervision services ordered by public organizations.

  • PDF

The Development of Investment Prioritization Criteria for the Mooring Facilities's Maintenance by the Delphi Study (델파이 기법을 적용한 항만 계류시설 유지보수 투자우선순위 결정 기준 개발)

  • Kim, Yong-Hee;Lee, Young-Ho;Song, Jae-Jun;Lee, Sang-Yoon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.15 no.1
    • /
    • pp.515-524
    • /
    • 2014
  • In this paper, The investment prioritization model was investigated for keeping the service level of mooring facilities more than the target level of management with a limited budget in the right time. Network level prioritization criteria of the national scale was developed to take into criteria index and quantitative evaluation, management authority's opinion. Delphi method was conducted maintenance exports of mooring facilities over twice for verifying the validity and adequacy. In order to improve the objectivity of criteria, the criteria for evaluating the utilization of port facilities is presented form yearly facility traffic/facility's length, the result of the analysis of facility traffic data. The investment prioritization criteria of mooring facilities is expected to be utilized for more efficient and national budget distribution applied to the maintenance budget plan of nationwide.

Development of Selection Criteria for Composite Method Using Half-PC Slab (하프슬래브를 이용한 PC 복합공법의 선정기준 개발)

  • Park, Byeong-Hun;Kim, Jae-Yeob
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.103-104
    • /
    • 2016
  • Most of studies on PC method aim at the structural analysis and development of PC members, and studies on the construction management aspect are insufficient. This study is a basic research in the construction management aspect regarding 'composite method using hollow-PC column' (HPC method), and is intended to develop assessment standards for the benefit·cost analysis of HPC method. Assessment standards for the benefit·cost analysis were composed of main-factors and sub-factors through interview with 4 experts. It was possible to classify main-factors into 4 major categories, i.e,. structural performance, construction performance, construction duration and construction cost. Sub-factors were composed of factors which were of high importance in assessing the two methods. And factors judged to be repeated or of little importance were excluded.

  • PDF

Study on the Satisfaction Analysis for Development of Construction Estimating Manager based on 3D Data (BIM기반 건축적산 매뉴얼 개발을 위한 만족도 분석에 관한 연구)

  • Choi, Chang-Hoon;Lee, Junbok;Han, Choong-Hee;Soh, Ji-Yoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.11a
    • /
    • pp.222-223
    • /
    • 2014
  • According to the improvement of IT technology, an enhanced efficiency of management system in the construction industry is expected since a quotation system with BIM (Building Information Modeling) technique effectively estimates construction materials. For an enhanced efficiency of management system, related guidelines, standards, and manuals based on BIM are required, but the lack of this information causes difficulty to utilize in practice. In the paper, the satisfaction analysis was performed in order to promote the completeness of construction estimating manager that can be presented criteria and details of BIM-based quantity-takeoff, classification criteria.

  • PDF

INTERPRETATION OF THE RELEVANT CONSTRUCTION CODES AND REGULATIONS, AND THEIR IMPLEMENTATION ON AN ERGONOMICAL AND SAFE WORK ENVIRONMENT

  • Ahmed Abdallah
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.429-436
    • /
    • 2005
  • This paper reflects on the ergonomical criteria for a humane working atmosphere in industrial buildings while respecting and paying close attention to the physical, mental, and stressful demands of the work environment. It describes effective construction codes and standards of practice and their importance in ensuring a safe environment for working people. Also addressed are the objectives for a productive work environment and its organization. The paper considers the significance of a proper working environment, the use of dangerous working materials, the use of proper ventilation, climate, and lighting to ensure that the productivity of the enterprise is met with common goals shared between employer and employee. The connection between the legal foundation and the design of industrial construction is the focus of this paper. It shows that the planning and executive persons are obliged to observe the relevant construction laws and regulations including standards and codes of practice. Additionally discussed are the possible solutions and consequences for development in the productional, constructional, and ergonomical fields of design.

  • PDF

Estimation of Bearing Capacity of SIP Pile Installed by Improved Criteria (개선된 기준으로 시공된 SIP 말뚝의 지지력 평가에 관한 연구)

  • Park, Jong-Bae;Kim, Jung-Soo;Lim, Hae-Sik
    • Journal of the Korean GEO-environmental Society
    • /
    • v.5 no.3
    • /
    • pp.5-15
    • /
    • 2004
  • SIP has been widely used as a low noise and vibration piling method in Korea. But the quality control of SIP was not properly settled down and field workers did not fully understand the principle of SIP method. So not a less troubles were raised at construction site and bearing capacity was not fully mobilized. To settle these problems, Korea National Housing Corporation amended the construction and load test criteria of SIP in 2002. After load tests on the SIPs installed in field according to the new criteria, we found that the bearing capacity in field vs the design load ratio increased and bearing characteristics was enhanced than that installed by the former criteria. To consider the enhanced bearing characteristics in the pile design and determine the adequate design criteria, this paper analyzed the accuracy of design criterion which were commonly used in Korea comparing with the load test results. Analysis result shows that Meyerhof criteria(1976) properly simulates the bearing capacity of SIP installed by the new construction and load test criteria.

  • PDF

A Study of Developing Guides for the Construction Site Quality Control of Porous Concrete (투수콘크리트 현장품질관리 지침서 개발에 관한 연구)

  • Ko, Eun-Jung;Goh, Eun-Joo;Seok, Ho-Joong;Lee, Seung-Hyeok
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.3
    • /
    • pp.65-71
    • /
    • 2009
  • General criteria for the quality of porous concrete have not been established yet in Korea. And yet, pavement and construction have been performed. In this paper, guidelines on the construction site quality control of porous concrete were developed in order to establish criteria for resolving the issues and problems of porous concrete, to establish methods for improving poor performance, and to manage porous concrete more systematically. In addition, a guide for the construction site quality control of porous concrete, which was appropriate for reality, was developed by researching several quality control guides and maintenance at construction sites. The guide consists of a total of nine chapters such as Application Range, Overview, the Structure of Porous Concrete, the Design of Package Thickness, Package Materials for Porous Concrete, Construction Methods, Quality Assurance and Inspections, Construction Site Quality Control, and Maintenance. It describes quality control guidelines in all steps such as methods for transporting porous concrete from the factory to the construction site, cautions for construction work at construction sites, maintenance, and management. The Guide for the Construction Site Quality Control of Porous Concrete is expected to ensure the quality of porous concrete, to reduce national costs for quality assurance, and to help ensure the health and safety of Korean people.

A Study on Criteria for investment Priority of Railway Project (철도건설 투자우선순위에 관한 연구)

  • Park, Il-Ha;Park, Yong-Gul;Kim, Si-Gon
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.112-116
    • /
    • 2008
  • Determining the investment priority of the railway project is essential to keep its object of railway investment. [National railway construction plan] provide 4 major evaluation indicators and their weighting range in determining the investment priority of railway construction. Which are investment efficiency, inter-regional balance of development, network effects, government supporting policy. However this present criteria has inconsistency in determining economical feasibility of the railway transportation when applying the same evaluation indicator, investment efficiency, with the road transportation. The railway transportation is superior to road transportation in terms of transportation capacity and distance, while offering less carbon emissions. In spite of the prominent position of the railway transportation, it can be failed to obtain its proper investment priority when being determined under economical feasibility based. Therefore, this study analyzed the inconsistency under present evaluation criteria and proposed new evaluation method for the investment priority of the railway construction using AHP(analytic hierarchy process), while differentiate from the road construction. This method is optimized for only determining the priority of the railway construction itself under object of railway investment respectively.

  • PDF

ROADWAY PERFORMANCE EVALUATION USING FUNCTION ANALYSIS METHOD OF VALUE ENGINEERING

  • Jong-Hyun Park;Yong-Jang Lee;In-Su Jung;Chan-Sik Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1528-1533
    • /
    • 2009
  • Infrastructure is provided to the user through long-term project period and large-scale working expenses. Existing facilities are getting old as time goes by. Accordingly, proper maintenance is required and generally more maintenance cost than initial invested cost is needed during life cycle. Therefore, a specific plan that just increases the value of facilities is required by evaluating performance of facilities and inputting minimum maintenance cost. Value engineering that increases the value of object by systemically analyzing Life Cycle Costs and function is actively promoted at the design phase of construction. These efforts can increase the performance of facilities at the maintenance phase of infrastructure. This study is to search how to evaluate the performance of Roadway by utilizing function analysis, as a core part of VE in the maintenance phase. In order to this a new evaluation criteria were proposed by adding an evaluation items to the existing criteria through the research of old documents, status of roadway maintenance and function analysis of VE. The results of this study may promote the effective performance evaluation to determine a resolution of roadway congestion in future. A succeeding study using the proposed evaluation criteria will be required.

  • PDF

Improvement of CM Fee Estimation Criteria for Efficient CM Service (건설사업관리업무 효율화를 위한 대가 산출기준 개선방향)

  • Cho, Youngjun;Sung, Youngmo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.2
    • /
    • pp.105-112
    • /
    • 2019
  • As the Construction Technology Promotion Act was revised in 2015, the term of Supervision was removed and Construction Management was included instead. The consideration of Construction Management shall be based on the cost plus fee method specified in the Criteria for the Cost of Construction Technology Services of the Ministry of Land, Infrastructure and Transport. Nevertheless, it is based on the construction cost ratio in accordance with the Economy and Finance Ministry's Detailed Guidelines for Preparing the 2018 Budget Plan and Fund Management Plan (Manual for Business Type and Item). As a result, it has been expected that Construction Management consideration will be calculated according to a single government standard and that the Criteria will be applied reasonably. In addition, although the change in the Labor Standard Act has a significant effect on the working environment of the construction site, the nature of the construction site is not considered in this Act. Based on these problems, the study suggested that the government should apply a single standard after consultation with the relevant agencies when calculating the consideration for Construction management, that the scope of the Criteria for the Cost of Construction Technology Services should be clear, that the amount of input by the Construction Manager should be considered for the capability of engineers and the number of working days, and that construction characteristics should be considered when determining the number of working days and hours.