• Title/Summary/Keyword: Construction Criteria

Search Result 1,694, Processing Time 0.029 seconds

Efficient Construction of the Immersed Tunnel Considering Hydration Heat (수화열을 고려한 침매 터널의 효율적 시공)

  • Jeon, Se-Jin;Choi, Myoung-Sung;Kim, Young-Jin;Chang, Young;An, Jea-Sang
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2005.11a
    • /
    • pp.587-590
    • /
    • 2005
  • This study investigates the efficient construction scheme of the immersed tunnel focusing on the hydration heat. In this respect, some alternatives in curing, temperature condition and removing of the forms are compared together to meet the required criteria. It is addressed that the strict construction stage analysis considering the placing scheme of concrete is one of the key factors to trace the realistic structural behavior for the hydration heat.

  • PDF

Design of Field Development Ship for Ultra-Deepwater (초심해 용 유전개발선의 설계)

  • Park, H.S.;S.W. Yoon;I.M. Song
    • Proceedings of the Korea Committee for Ocean Resources and Engineering Conference
    • /
    • 2001.05a
    • /
    • pp.87-92
    • /
    • 2001
  • This technical note is intended to introduce a state-of-the-art offshore construction vessel. This unique vessel is for multi-purpose Field Development Ship (FDS) for deepwater to ultra-deepwater. The FDS is a construction vessel with dynamic positioning (DP) system intended to develop offshore oil and gas field in water depth up to 3000 m. The design criteria and main capacities of the vessel are discussed.

  • PDF

Performance Criteria to Assess the Remodeling Feasibility of Office Buildings (업무용 건축물 리모델링 사업성 평가 성능기준)

  • Yang, Keek-Young;Yoon, Yer-Wan;Jeong, Dong-Whan
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.2
    • /
    • pp.142-151
    • /
    • 2012
  • Despite the changes to demands and perceptions according to building deterioration, most of the previous studies on remodeling have focused on apartment buildings, which are residential buildings. Few studies have been conducted on buildings for general commercial use, or office buildings. Accordingly, this study set out to prepare a set of performance criteria to assess the remodeling feasibility of office buildings. For that purpose, 23 assessment items were devised, their importance was tested, 13 were extracted, and a set of scoring criteria for each item was prepared. Case analysis was conducted to check the reliability of the assessment items and scoring criteria. Through this analysis, it was found that the criteria were reliable.

Indicators for Environmental Performance Assessment of Construction Activities (시공단계 환경성능 평가를 위한 평가지표 및 중요도 도출)

  • Lee, Sang-gyu;Kang, Gou-ne;Lee, Myung-do;Cho, Hun-hee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.145-146
    • /
    • 2012
  • With the increasing public concerns on sustainability in construction industry, a variety of standards for green buildings have been developed and implemented. However, most of their criteria are not adaptable to evaluate environmental performances of construction activities. Besides, the great part of existing studies are focusing only on energy consumption and CO2 emissions, overlooking the impact of pollution sources which occur intentionally in the construction phase. In this study, indicators and their importances are investigated to assess the overall environmental performance of construction activities.

  • PDF

A Study on Structural Performance by Condition Grade of Temporary Equipment (가설기자재 상태등급별 구조성능에 관한 연구)

  • Moon, Seong-Oh;Mo, Seung-Un;Youn, Ye-Bin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.11a
    • /
    • pp.16-17
    • /
    • 2020
  • The Temporary construction refers to the construction or dismantling of temporary structures installed for the construction of the main structure at the construction site, and the members constituting this temporary facility are called temporary equipment. Temporary equipment used in construction sites is mostly used products that are reused rather than new products, and it is necessary to consider performance degradation due to repeated use. This study is a preliminary study to develop the performance evaluation criteria applied to temporary equipment that is distributed and reused for secondhand. This study is to analyze the performance status of temporary equipment of used goods owned by rental companies by condition grade through performance tests.

  • PDF

Performance Evaluation Model for Public-Private Partnership Projects - with Reference to BTO (Build-Transfer-Operate) Road Projects - (민간투자사업 성과평가 모델 개발 및 적용 - 도로 부문 사업을 중심으로 -)

  • Park, Hyeon;Park, Inseok;Lee, Shin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.2
    • /
    • pp.83-95
    • /
    • 2018
  • The aim of this paper is to develop a performance evaluation model for PPP (Public-Private Partnership) projects that appropriately reflects the important traits that are unique to PPP projects. To this end, 1) it defines a set of distinct perspectives involved in the PPP projects and their associated success factors that might differ amongst the perspectives; 2) it identifies the key performance indicators and suggests the performance evaluation criteria for each indicator; and 3) it builds a performance evaluation model by matching the success factors from each perspective with performance measure criteria as well as applies the model to the two selected BTO road projects in Korea. The process of model construction and its application confirms significant differences between the main stakeholder perspectives typically involved in PPP projects, which highlights the need for an evaluation model tailored for PPP projects by taking into account the distinct perspectives. The results from the PPP evaluation model developed in the study is compared against the results from the existing ex-post evaluation model for construction projects in general. The former shows a closer match with the results from the user satisfaction survey conducted. This new evaluation framework and the performance indicators entailed in it permits a balanced evaluation of PPP projects as it takes into account different perspectives involved in PPP projects as well as an understanding of the factors affecting the success of PPP projects. While the construction of the model is based on transport projects, it is applicable to different types of PPP projects through variation with the weight allocation amongst different success factors and/or additions or other adjustments to the performance evaluation criteria as required.

Improvement of Technical Proposal Tendering Evaluation Criteria for Small and Medium sized Construction Projects (중·소형 건설공사를 위한 기술제안입찰 평가기준 개선)

  • Yu, Jun-Hyeok;Hyun, Chang-Taek;Moon, Hyun-Seok;Son, Myung-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.1
    • /
    • pp.95-105
    • /
    • 2012
  • The government introduced the technical proposal drafting system in September 2007, as a new method to stimulate technical competence among construction companies to require ingenuity, creativity, artistic sense, and high-level technology. However, an examination of instances has shown that this system has been applied only to large scale constructions worth 30 billion won or more, and not to small and medium constructions worth less than 30 billion won. This is because the evaluation criteria of the system is structured in a manner that makes it difficult to apply to small and medium constructions. This study presented methods to improve the evaluation factors, categories, and scoring scheme of the technical proposal creation system for medium to small scale constructions to be able to further apply the current system to small and medium constructions. The technical proposal evaluation criteria presented in this study was significant in that it enabled the technical proposal creation system that was mainly used for large scale constructions to be further applied to medium to small scale constructions. And it also contributes to the establishment and settlement of a new technical proposal tendering for medium to small scale constructions.

The Allocation Precedence of the Limited Same Resource to the Concurrent Activities under Multiple Criteria (다기준하 동일 한정 자원의 배당 우선순위 결정)

  • Hwang, Jin-Ha
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.5
    • /
    • pp.159-167
    • /
    • 2008
  • This study provides a effective approach to the construction management problem with the limited number or amount of available resources using the analytic hierarchy process. Construction management is a series of decision making processes for planning and controling of cost, time and quality as main objectives in construction works. When several activities need the limited same resource at the same time, it is very hard to decide the priority of the activities in the real situations. For that the scientific decision making method and procedure for resource allocation are required. This study solves the resource allocation problem by dealing with the decision making problem which the activities are distributed to multiple projects and under multiple criteria. The analytic hierarchy process is a method devised to solve complex multi-criteria decision problems. The result shows that this study can be effectively used to make decisions in situations involving multiple objectives by evaluating the prioritized ranking and degree of the activity alternatives based on the overall preferences.

A Study on the Selection of Construction Method by Decision Making Method (의사결정기법을 통한 건축공법선정에 관한 연구)

  • Yang, Keek-Young;Yoon, Yer-Wan
    • Journal of the Korea Institute of Building Construction
    • /
    • v.2 no.1
    • /
    • pp.147-154
    • /
    • 2002
  • In the Past, The selection of individual method of construction was done by head of construction site or an experienced person very frequently. By doing this, The wrong selection of construction method without exact adjudication of construction site situation lead to increasing of cost and extension of construction term. Finally it will effect all over the construction process. Especially, In case of underground construction in the beginning, there are a lot of a variable factor and it also effect on the entire construction process and it need very careful process. The purpose of this study is to present the best suitable methodology for selection of construction method by considering potential risk of construction method and variables together with external condition for underground construction. The purpose of this study Is to select the most suitable construction method by analysing potential conditions(construction site situation and client request in designing ) To do this, We prepared arrangement rule to arrange the conditions for construction method. And thin make checklist of the analyzing construction method. Though above process, To expect the risk of individual construction method using above risk checklist and using Analytic Hierarchy process among Multiple-Criteria Decision making, the professional opinions is to be adapted. By doing this, it can lead and select the most suitable construction method considering the data which get from risk density test.

A Study on Blasting Vibration Control Criteria for Pre-insulated Pipe through the Numerical Analysis (수치해석을 이용한 이중보온관 발파진동 관리기준에 관한 연구)

  • Choi, Bong-Hyuck;Cho, Jin-Woo;Kim, Jin-Man;Yoo, Han-Kyu
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.4
    • /
    • pp.1471-1478
    • /
    • 2013
  • In this paper, numerical analysis with varying distance and burial depth was performed to recommend the blasting vibration control standard for pre-insulated pipes. The blasting load model applied in the numerical analysis was verified to the comparison with the results of the field tests. It was determined from the results of the numerical analysis that the effective stress either exceeds or approaches the allowable stress of the inner steel pipe for vibration velocity greater than 4.0cm/sec while stability is obtained for vibration velocity below 4.0cm/sec. Therefore, it was determined that the blasting vibration control criteria for pre-insulated pipes must not exceed 4.0cm/sec.