STATISTICALLY PREPROCESSED DATA BASED PARAMETRIC COST MODEL FOR BUILDING PROJECTS

  • Sae-Hyun Ji;Moonseo Park;Hyun-Soo Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.417-424
    • /
    • 2009
  • For a construction project to progress smoothly, effective cost estimation is vital, particularly in the conceptual and schematic design stages. In these early phases, despite the fact that initial estimates are highly sensitive to changes in project scope, owners require accurate forecasts which reflect their supplying information. Thus, cost estimators need effective estimation strategies. Practically, parametric cost estimates are the most commonly used method in these initial phases, which utilizes historical cost data (Karshenas 1984, Kirkham 2007). Hence, compilation of historical data regarding appropriate cost variance governing parameters is a prime requirement. However, precedent practice of data mining (data preprocessing) for denoising internal errors or abnormal values is needed before compilation. As an effort to deal with this issue, this research proposed a statistical methodology for data preprocessing and verified that data preprocessing has a positive impact on the enhancement of estimate accuracy and stability. Moreover, Statistically Preprocessed data Based Parametric (SPBP) cost models are developed based on multiple regression equations and verified their effectiveness compared with conventional cost models.

  • PDF

A Study on the Prediction-Formulas of Approximate Estimate Based on Actual Work Cost for Subway (실적공사비에 의한 지하철 공사비 예측모형에 관한 연구)

  • Park, Jong-Hyuk;Jeon, Yong-Bae;Park, Hong-Tae
    • Journal of the Society of Disaster Information
    • /
    • v.9 no.1
    • /
    • pp.11-21
    • /
    • 2013
  • This study proposed cost prediction equation model by considering duration, construction, size, actual cost with the subway construction started by the actual cost system which was introduced since 2004. Costs - scale exponent n(confidence range: 0.5 to 0.7) for cost prediction of subway construction was drawn total cost(0.713), net cost(0.77) in point of the 11 subway construction data. The cost prediction equation model of the subway construction which was presented in this study is able to effectively apply to business planning, preliminary investigation, feasibility study, basic design stage to estimate the approximate cost in the future.

CONSTRUCTION COST INDEX FOR APPLYING INDEX ADJUSTMENT RATE IN THE ROAD PROJECT

  • Jin-Young Chun;Sungkwon Woo
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1112-1117
    • /
    • 2005
  • Construction cost index is generally used to estimate the new project cost based on past construction data and to adjust contract cost when the price change of various articles and items of expenditure composing the contract occurs. In Korea, it is mostly used for adjustment of construction contract cost due to fluctuation of prices. However index adjustment rate which is used for adjustment of construction contract cost had some problems in calculating cost index of each expenditure item that could not reflect properly the change of construction cost. For supplementing these problems, the research of developing construction cost index has been executed. Through the precedent research, these problems were partially resolved but still remain. Therefore this research proposes method of making cost index that utilizes representative items of labor, material, and equipment by analyzing bill of quantity of road construction, through analysis and comparison of precedent study. By using this method, it is expected to solve problems which were not reflected in precedent studies.

  • PDF

Conceptual Cost Estimate Method of Public Office Building Structural Frame Work by Regression Analysis (회귀분석을 통한 공공청사 골조 공사의 개산견적 방안)

  • Jo, Yeong-Ho;Choi, Hyun-Jun;Kim, Jung-Won;Yun, Seok-Heon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.20 no.2
    • /
    • pp.147-153
    • /
    • 2020
  • It is important to estimate the optimal construction cost at the early stage of the project. In this regard, conceptual cost estimate is an important factor for estimate optimal construction cost. However, domestic conceptual cost estimate are only used as cost per unit area according to the building type, and it's accuracy is not high. Hence, the purpose of this study is to calculate the approximate quantity and cost for reinforcing bars, concrete, and formwork by presenting a regression formula based on the total floor area of the common work items in the frame work. In order to verify the accuracy and validity of the regression formula presented in this study, a comparative analysis was performed by applying the regression formula and the traditional approximate quantity take-off method to real cases. As a result, the estimated error rate of the traditional method was -102~+55%, and exceeded the estimated conceptual cost estimate accuracy range of -50~+100% suggested by AACE(American Association of Cost Engineering). On the other hand, the error rate of the regression formula method presented in this study was -6.4~+11.62%. This can be used not only for conceptual cost estimate range of accuracy, but also for detailed estimates. However, it is necessary to analyze the factors that affect the unit price as well as quantity in order to calculate the appropriate cost.

PROCESS RESEARCH FOR DEVELOPMENT OF STRUCTURAL COST ESTIMATING MODEL BASED QUANTITY - FOCUSED ON PUBLIC OFFICE BUILDING PROJECT -

  • Soo-Min Kim;Jung-Kyu Seo;Sung-Uk Kim;Chang-Hyun Shin;Yung-Jin Kim;Jae-Youl Chun
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1170-1175
    • /
    • 2009
  • When managers estimate exact construction cost at early stage and design phase, they can reduce construction cost in a more efficient way than to predict at construction stage. But, the current of public construction cost estimation and management is concentrated almost after detailed design phase. Therefore, construction cost management in design development phase to generally use approximate estimating is not correct. Also, the existing construction cost used the method that estimated by gross floor area-based cost estimates at design development phase. So, it is difficult to show the specific amount of materials and basis about the estimated cost of the construction. This study derived problems and limits of construction management at design development phase in case of public office building project through review of literature and current survey, and suggested estimating process model process of structural construction cost go improve these matters.

  • PDF

Development of Tunnel Construction Cost Model Using System Dynamics (시스템 다이내믹스를 이용한 터널공사비 모델 개발)

  • Park, Yong-Woo;Park, Hee-Sung
    • The Journal of the Korea Contents Association
    • /
    • v.12 no.4
    • /
    • pp.468-475
    • /
    • 2012
  • Construction cost of tunnel is decided on construction area, site conditions, and construction methods. However, there is few research on developing models to estimate early construction costs. Therefore, this paper presents a model for early estimation tool for NATM tunnel using system thinking. The effect factors for tunnel construction cost were defined and the causal map is developed. Then empirical case analysis were performed to identify the cost difference due to tunnel length, excavation volume, and rock quality. The proposed model would be an alternative to estimate early construction cost of NATM tunnel.

A Study on the process for Managing the Reliability of Conceptual cost estimates in Building Projects (건축 프로젝트 개산견적 신뢰도 관리 프로세스에 관한 연구)

  • An, Sung-Hoon;Kim, Dae-Won;Park, U-Yeol
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.2
    • /
    • pp.133-138
    • /
    • 2010
  • Conceptual cost is estimated with insufficient information at an early stage of a building construction project, resulting in an inevitable gap between conceptual estimated cost and real constructed cost. For a project to be successful, this gap must be managed to be lower than a reliable level. Therefore, the purpose of this study is to propose a structural process for managing the reliability of conceptual cost estimates at an early stage of a building construction project. In researching this study, conceptual cost estimate experts were interviewed,and a risk management process was studied. Reliability assessment and a review process for improving the quality of conceptual cost estimate and the planning strategy of reliability management based on previous similar projects were added to the present estimate process. The proposed reliability management process will improve the chances of a successful project, by helping to decrease the risk of conceptual estimated cost.

Cost prediction model of Public Multi-housing Projects in Schematic Design Phase (공공아파트 계획설계단계에서의 공사비 예측모델)

  • Kwon, Ho-Suk;Moon, Hyun-Seok;Lee, Sung-Kyun;Hong, Tae-Hoon;Koo, Kyo-Jin;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.3
    • /
    • pp.65-74
    • /
    • 2008
  • Public institutions recognize the importance of cost management from the planning stage but they do not have an organized construction cost estimation and management system. Thus, at the stage of planning a new public construction project and estimating the cost, those in charge of budgeting estimate construction cost based on existing data and experiences, compare construction cost estimated after the basic design stage and the execution design stage with budgets, and then decide whether to continue the project or change the design according to the budgets. Therefore, we would develop the cost prediction model through regression analysis that can predict construction cost in Schematic Design Phase of the Public Multi-Family housing. Accordingly, if public institutions have a construction cost prediction model and management system that can estimate the optimum construction cost, they can make and execute budgets in a more efficient way than they do at present.

A Study on the Time Series Analysis of the Actual Unit Cost based on the Bid Prices (시계열을 이용한 실적단가 예측방안에 관한 연구)

  • Park, Won-Young;Seo, Jong-Won;Kang, Sang-Hyeok;Choi, Bong-Joon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.4
    • /
    • pp.50-57
    • /
    • 2009
  • The Korea Standard of Estimate which has been used as the only basis of Cost estimate of public construction projects is failed to reflect the fluctuation of current construction cost. Therefore, the government decided to gradually introduce historical construction cost into cost estimate of public construction projects from 2004 and to reduce the use of Korean Standard of Estimate. This paper presents a series of process and the methodology for computing Actual Cost and analyzing the fluctuation patterns based on not only previous contract prices which made a successful bid but also all of the other bid prices. Also, this paper mainly handles a device for extracting strategic bid price such as low price bid for assuring reliable data and for predicting the construction cost which is built by Wavelet Analysis of Time series Analysis data and Neural Network. It is anticipated that the effective use of the proposed process for estimating actual unit cost would make the cost estimation more current and reasonable.

SCHEMATIC ESTIMATING MODEL FOR CONSTRUCTION PROJECTS -USING PRICIPLE COMPONENT ANALYSIS AND STRUCTURAL EQUATION METHOD

  • Young-Sil Jo;Hyun-Soo Lee;Moon-Seo Park
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1223-1230
    • /
    • 2009
  • In the construction industry, Case-Based Reasoning (CBR) is considered to be the most suitable approach and determining the attribute weights is an important CBR problem. In this paper, a method is proposed for determining attribute weights that are calculated with attribute relation. The basic items of consideration were qualitative and quantitative influence factors. These quantitative factors were related to the qualitative factors to develop a Cost Drivers-structural equation model which can be used to estimate construction cost by considering attribute weight. The process of determining the attribute weight-structural equation model consists o 4 phases: selecting the predominant Cost Drivers for the SEM, applying the Cost Driers in the SEM, determining and verifying the attribute weights and deriving the Cost Estimation Equation. This study develops a cost estimating technique that complements the CBR method with a Cost Drivers-structural equation model which can be actively used during the schematic estimating phases of construction.

  • PDF