A Study on the process for Managing the Reliability of Conceptual cost estimates in Building Projects  

An, Sung-Hoon (대구대학교 건축공학과)
Kim, Dae-Won (고려대학교 건축사회환경공학과)
Park, U-Yeol (안동대학교 건축공학과)
Publication Information
Journal of the Korea Institute of Building Construction / v.10, no.2, 2010 , pp. 133-138 More about this Journal
Abstract
Conceptual cost is estimated with insufficient information at an early stage of a building construction project, resulting in an inevitable gap between conceptual estimated cost and real constructed cost. For a project to be successful, this gap must be managed to be lower than a reliable level. Therefore, the purpose of this study is to propose a structural process for managing the reliability of conceptual cost estimates at an early stage of a building construction project. In researching this study, conceptual cost estimate experts were interviewed,and a risk management process was studied. Reliability assessment and a review process for improving the quality of conceptual cost estimate and the planning strategy of reliability management based on previous similar projects were added to the present estimate process. The proposed reliability management process will improve the chances of a successful project, by helping to decrease the risk of conceptual estimated cost.
Keywords
conceptual cost estimate; reliability; risk management;
Citations & Related Records
Times Cited By KSCI : 3  (Citation Analysis)
연도 인용수 순위
1 Walewski, J., Gibson, G.E., Dudley, G., Development of the International Project Risk Assessment(IPRA) Tool, CII, 2003
2 안용선, 송규열, 허정민, 건설사업 초기단계에서 개산견적의 정확성 향상 방안, 대한건축학회논문집(구조계), 제19권 제11호, pp.133-140,2003   과학기술학회마을
3 조재호외 3인, 실적건설공사비 자료에 의한 예정가격산정 및 위험도 측정 방법에 관한 연구, 대한건축학회 학술발표논문집, 제20권 제1호,pp.411-414, 2000.4
4 American Association of Cost Engineers(AACE), Recommended practice No. 19R-97: Estimate preparation costs in the processindustries, Morgantown, West Virginia: AACE Inc., 1997.
5 An, S. H., Park, U. Y., Kang K. I., Cho, M. Y. and Cho, H. H.,Application of support vector machines in assessing conceptual cost estimates, Journal of Computing in Civil Engineering,Vol.21 No.4, pp.259–264, 2007   DOI   ScienceOn
6 Ashworth, A., Skimore, R.M., Accuracy in estimating,Occational Paper, Chartered Institute of Building, 1983
7 Boeschoten S., Reliability and accuracy of estimates, AACE International Transactions, EST.02, pp.EST.02.1-5, 2004
8 Construction Industry Institute (CII). (1995), Pre-project planning handbook. Special Publication 39-2, Austin, Tex.
9 Oberlender, G.D., Trost, S.M., Predicting accuracy of early cost estimates based on estimate quality, Journal of Construction Engineering and Management, Vol.127, No.3, pp.173-182, 2001   DOI   ScienceOn
10 Ruch, C. and Roy, R., "Expert judgement in cost estimating: Modeling the reasoning process", Concurrent engineering:research and applications, Vol.9, No.4, pp.271-284, 2001.   DOI
11 Serpell, A.F., Towards a knowledge-based assessment of conceptual cost estimates, Building Research & Information, Vol.32, No.2, pp.157-164, 2004   DOI   ScienceOn
12 Trost, S.M., Oberlender, G.D., Predicting accuracy of early cost estimates using factor analysis and multivariate regression, Journal of Construction Engineering and Management, Vo.129, No.2, pp.198-204, 2003   DOI   ScienceOn
13 안성훈, 윤지언, 강경인, 판별분석을 이용한 개산견적 평가모델 구축에관한 연구, 대한건축학회논문집(구조계), 제21권 제9호, pp.169-176,2005   과학기술학회마을
14 안성훈, 박우열, 건축 프로젝트 개산견적 신뢰도에 영향을 미치는 주요인자에 관한 연구, 한국건축시공학회논문집, 제8권 제4호, pp.53-59,2008.8   과학기술학회마을   DOI   ScienceOn