• Title/Summary/Keyword: Construction Convenience

Search Result 434, Processing Time 0.028 seconds

CHECKLIST FOR ENVIRONMENTAL FRIENDLY CONSTRUCTION MANAGEMENT IN DESIGN PHASE

  • In-Su Jung;Hyun-Su Park;Chan-Sik Lee
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.376-385
    • /
    • 2007
  • Construction project is necessary element for human life to upgrade the quality and convenience. However, due to its contradictory nature to the environment preservation, environmental pollution and damage, deterioration of natural scenery, noise/vibration, water quality pollution, etc. caused in the process of construction greatly affect the environment. For the building or construction project, its possible impact on environment during construction work and after completion must be predicted at its design phase, which will result in the completion of the architecture convenient for human being with its environmental pollution reduced to minimum level. In this study, the checklist of environmental factors was suggested, which should be taken into account at its design phase in conducting the construction work. Proposed checklist was linked with the developed web-based system for the convenience of users like designer and construction manager, etc. It is expected that the checklist suggested by this study will help the designer and construction manager to continue the steady development from the environmental viewpoint during the design phase.

  • PDF

Automatic Linkage Method Between Email and Block Structure to Store Construction Project Documents in The Blockchain

  • Kim, Eu Wang;Park, Min Seo;Kim, Jong Inn;Wei, Ameng;Kim, Kyoungmin;Kim, Kyong Ju
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.886-892
    • /
    • 2022
  • In construction projects, it is common to exchange documents using email because of convenience. In this study, a method extracting and organizing block information automatically based on email was developed. This method is composed of document exchange and archiving processes, which are difficult to manage and vulnerable to loss. Therefore, this study aims to develop a solution that can automatically link email and block information. The block data components are designed to derive from email exchange and user-additional input information. Also, automatically generating blocks process including extraction and conversion of information was proposed. This solution can lead to promote the convenience of project document management in terms of identifying the document flow and preventing loss of information.

  • PDF

Study on the Development of Slope Survey Program for the Real-time Database (실시간 데이터베이스 구축을 위한 사면조사 프로그램 개발에 관한 연구)

  • Lee, Jong-Hyun;Choi, Ji-Yong;Koo, Ho-Bon
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.09a
    • /
    • pp.1282-1288
    • /
    • 2010
  • In this study, Site Investigation Program of cut slope is developed using related techniques and experience got from practical application of Inventory Survey Program of cut slope in work for last 4 years. The Site Investigation Program is designed to can be loaded to the Mobile PC for convenience of carrying in filed, convenience of data input and revision, application of diverse programs, convenience of confirming data and facility of establishment of real-time database system using wireless communication like Inventory Survey Program. Also, for connection with Inventory Survey Program, it has a same work process and can establish real-time database system of almost data obtained in filed using stability analysis tool loaded in this program. Application of this developed program is expected to be an opportunity that can contribute to development of slope investigation and database system area using IT techniques.

  • PDF

Structural Optimization of Vibration-free PBD(Plastic Board Drain) Construction Equipments (무진동 PBD(플라스틱 보드 드레인) 시공장비 구조 최적 설계)

  • Oh, Sung-Hoon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.8 no.5
    • /
    • pp.1300-1305
    • /
    • 2007
  • Plastic board drain is one of the methods to reinforce weak soil, and it has been widely used because of economical efficiency, convenience of construction, and ease of quality control. The weight of PBD equipment which places PBD perpendicularly underground in the depth of 40m has to be minimized to obtain convenience installation and movement while standing against press drawing load. In this study, the performance of stability was evaluated with stress distribution at the steel construction of former equipment by structural analysis: And the steel construction which can increase strength while reducing the weight was also presented. As a result of this study, presented construction can obtain more stability by use of the weight 700kg lighter than the former one.

  • PDF

Barrier Free Design on Senior Welfare Center (노인복지관의 무장애공간 설계에 관한 연구 -충북지역 소재 노인복지관을 중심으로-)

  • Lee, Ji-Young
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.16 no.1
    • /
    • pp.27-34
    • /
    • 2014
  • This study is to understand fallible point on the step of design, construction and management, and suggest an improvement measure for the convenience of elderly through the field survey. The field survey on convenience facilities for the disabled of Senior Welfare Center in Chung-Buk Area was performed on approach to main entrance, parking lot, main entrance area, entrance door, passage, stair, elevator and toilet. It was discussed that barrier free design should be considered of main user's group and use pattern. Consequently, important points requiring circumspection at the step of design and construction was suggested.

Construction of Laser Lithography System using Method of Monitoring the Focal Point (초점 모니터 방법을 이용한 레이져 Lithography 장치의 제작과 응용)

  • 이도형
    • Proceedings of the Optical Society of Korea Conference
    • /
    • 1990.02a
    • /
    • pp.222-226
    • /
    • 1990
  • This paper represents the construction of laser beam writing system, laser lithography, using new method that guarantees convenience and accuracy in laser focusing. The X, Y translation stage using DC motors was controlled by the computer. Minimum line width of 1.6${\mu}{\textrm}{m}$ was obtained by the laser lithography system.

  • PDF

Development of wireless charging drone station prototype for construction sites (건설현장용 무선충전 드론스테이션 프로토타입 개발)

  • Han, Jae Goo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.11a
    • /
    • pp.225-226
    • /
    • 2022
  • In order to secure the practicality of services using drones, improve on-site operability, and improve the convenience of aircraft maintenance, it is necessary to develop a drone station that can be safely stored while ensuring charging performance. Therefore, a total seven points of improvement were derived through laboratory experiments after the development of the first prototype, and an improved second prototype will be developed in the future based on the preceding processes.

  • PDF

Performance Evaluation of Adhesively Fixed External Insulation and Finish System Using Vacuum Insulation Panels for Apartment Buildings (공동주택 습식 진공 외단열시스템 성능 평가)

  • Park, Si Hyun;Lim, Jae Han;Song, Seung Yeong
    • KIEAE Journal
    • /
    • v.13 no.6
    • /
    • pp.45-53
    • /
    • 2013
  • For the target goal of Zero-energy House construction in 2025, the government announced that the insulation regulations will be continuously enhanced. It has been predicted that high-performance insulation materials, such as vacuum insulation panel (VIP), should be used to decrease the thickness of outer walls. The aim of this study was to evaluate the performance of adhesively fixed external insulation and finish system (EIFS) with VIP. The energy performance of a base model with conventional internal insulation system and three alternatives of EIFS with VIP were analyzed by three-dimensional heat transfer simulation. Construction cost and convenience of each alternative were also evaluated and compared. As results, effective alternatives in terms of each performance as well as overall performance considering the weighting factors of each performance were suggested.

Standardization for Post-Construction Evaluation Report (건설공사 사후평가결과보고서 표준화 방안)

  • Kim, Kyong hoon;Lee, Chankyu
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.289-290
    • /
    • 2023
  • According to relevant laws, in the case of a construction project with a total construction cost of 30 billion won or more, a post-construction evaluation must be performed after completion. In addition, a post-construction evaluation report must be prepared and entered into the Continuous Acquisition & Life-cycle Support(CALS). As a result of reviewing the currently accumulated post-construction evaluation reports, since the report is not standardized, it is difficult for public project owners to write the report. It also hinders the post-construction evaluation and management center from verifying contents, analyzing data, and deriving meaningful results. In order to improve the convenience of the public owners who must conduct post-construction evaluations and the work efficiency of the center, evaluation factors were standardized and a standard post-construction evaluation report format for road construction was developed in Excel. Through this, the data in the reports will be effectively accumulated, managed, and analyzed, so that meaningful results will be produced and be helpful in future construction work.

  • PDF