• 제목/요약/키워드: Construction BIM model

검색결과 392건 처리시간 0.026초

BIM 기반 디지털엔지니어링 모델을 활용한 프리팹 교량모델 작성 프로세스 (BIM-based Digital Engineering Modeling Process Proposal for Prefabricated Bridges)

  • 최재웅;김현민;홍사훈
    • 한국BIM학회 논문집
    • /
    • 제13권4호
    • /
    • pp.36-44
    • /
    • 2023
  • Recently in Korea, efforts are underway to enhance smart construction by implementing Building Information Modeling (BIM) comprehensively across all sectors of the construction industry. This study focused on the adoption of BIM for prefab bridges currently executed in the industry and It examined the process of creating a BIM-based prefab bridge model that can support production. Additionally, it explored how prefab products made by manufacturers can be integrated with road alignments using BIM technology and how the DfMA (Design for Manufacturing and Assembly) approach, which supports production based on designed information, can be adopted. The process of creating the prefab bridge model aims to shorten production time, reduce costs, and enhance quality by leveraging digital information related to design and manufacturing within the BIM framework

ENHANCEMENT OF AVAILABILITY OF 4D SIMULATION BASED ON BUILDING INFORMATION MODEL TECHNOLOGY

  • Jong Jin Park;Eon Yong Kim;Hyun Cho;Han Jong Jun
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.579-586
    • /
    • 2009
  • 4D simulation integrates the 3 dimensional model of a building with the construction schedule, and it leads to the possibility of virtually checking the construction process and the building itself in advance. However, the existing problem of 4D simulation is the difference between the demands of architects, engineers, and construction site workers in 4D simulation. This study suggests the possible way to enhance the availability of 4D simulation, considering more the practical demands from the construction site. In order to conduct this study, we build a 3D BIM model of a business-residential complex and link the model with the pre-defined construction schedule in order to make a 4D simulation. This study concludes with the optimized 4D simulation methodology based on BIM model considering the demands in perspective of the construction site. It would contribute to the harmonic collaboration among architects, engineers, and labors in the construction site when using 4D simulation based on BIM model.

  • PDF

BIM기반 프로젝트의 WLCM (Whole Life-Cycle Management) 적용모델 개발을 위한 기초연구 (A Preliminary Study of the evaluating and improving WLCM for construction project based on BIM)

  • 이근호;임형철
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2011년도 추계 학술논문 발표대회
    • /
    • pp.13-14
    • /
    • 2011
  • The main purpose of this research is to propose standardization of construction components design with BIM and to develop WLCM Framework and Application System for supply chain management on interaction of stakeholders based on proposed standard component. To accomplish main purpose of this research, we planned three years period, in first year, we will develop model for building lifecycle based on BIM, and this model can give the chance of collaboration with stakeholders of building project. In second year, we will develop WLCM system with model, and to improve performance of application model/system. This study can contribute on reduction of whole lifecycle cost, with preventing omission of factors on cost reduction possibility, develop concurrent engineering framework for construction stakeholders with proposed BIM.

  • PDF

A FRAMEWORK FOR SIMULATING CONSTRUCTION PROCESSES FOR OPTIMIZING THE FLOOR CONSTRUCTION CYCLE USING BIM

  • Seung-Jun Ahn;Hyun-Soo Lee;Moonseo Park
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.835-840
    • /
    • 2009
  • Lately, Building Information Modeling (BIM) emerges as the most promising technology, now is expected to bring a great deal of improvement of productivity in every aspect of the construction industry. One of the BIM based scheduling is to use BIM model as a base for applying to schedule analysis and simulation tools. This type of tools may incorporate a various types of information such as the building model, construction method information, resource information, productivity information, rules and constraints to optimize activity sequencing. This paper proposes a framework of BIM based simulating system which can be used to optimize construction processes, especially for the floor construction cycle. For the purpose, all of the necessary components of the system will be defined and represented, and next an algorithm will be introduced to demonstrate the principle of simulating operation. The benefits of this technique are basically two : to test and optimize construction methods in respect of the construction duration and to reduce the floor construction cycle.

  • PDF

A Study on Construction Site of Virtual Desktop Infrastructure (VDI) System Model for Cloud Computing BIM Service

  • Lee, K.H.;Kwon, S.W.;Shin, J.H.;Choi, G.S.;Moon, D.Y.
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.665-666
    • /
    • 2015
  • Recently BIM technology has been expanded for using in construction project. However its spread has been delayed than the initial expectations, due to the high-cost of BIM infrastructure development, the lack of regulations, the lack of process and so forth. In construction site phase, especially the analysis of current research trend about IT technologies, virtualization and BIM service, data exchange such as drawing, 3D model, object data, properties using cloud computing and virtual server system is defined as a most successful solution. The purpose of this study is enable the cloud computing BIM server to provide several main function such as edit a model, 3D model viewer and checker, mark-up, snapshot in high-performance quality by proper design of VDI system. Concurrent client connection performance is a main technical index of VDI. Through test-bed server client, developed VDI system's multi-connect control will be evaluated. The performance-test result of BIM server VDI will effect to development direction of cloud computing BIM service for commercialization.

  • PDF

BIM기반 건설현장 관리모델 개발에 관한 연구 (A Study on the Development of a Construction Field Management Model based on BIM)

  • 전영웅;이명식
    • 한국건축시공학회지
    • /
    • 제10권1호
    • /
    • pp.127-135
    • /
    • 2010
  • 복합, 대형화되는 건설현장에서 사용되는 건설정보들의 양은 방대해지고 이에 따라 효율적인 건설현장 관리의 중요성이 대두되기 시작하였다. 따라서 본 연구에서는 BIM의 이론적 고찰과 국내외 사례조사를 통해서 BIM의 적용 현황 및 가능성을 파악하고 건설현장의 수행단계별, 협업주체별 중심의 분석을 통해서 효율적인 건설현장 관리모델의 구축 방향을 제시하고자 한다. BIM을 적용하여 목적 건축물의 3D Modeling을 통한 2D 도면의 시각화, 도면 오류의 사전 발췌로 시간적, 금전적 손실을 최소화, 3D 모델의 물량정보로 예산 작성의 정확성을 향상, 정확한 도면의 건축정보와 물량정보로 공사 진행 방향 설정에 확실성을 부여 및 부위별 객체 정보를 포함한 BIM기반의 건설정보를 바탕으로 공정관리를 통한 원가관리, 품질관리가 가능함을 알 수 있었다. 이 과정을 통해 BIM정보를 통합하고 연계함으로써 현장과 각 협업주체들 간의 건설현장 관리의 효율성을 향상이 가능하다고 판단된다. 추후에는 실제 건설현장 관리모델을 구축하고 실제 건설현장에 적용하여 검증을 하는 연구가 필요하다.

A Methodology of Open BIM-based Quantity take-off for Schematic Estimation of the Frame Work in Early Design Stage

  • Hansaem Kim;Jungsik Choi;Inhan Kim
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.419-425
    • /
    • 2013
  • Recently AEC industry has required construction automation according to becoming large and complex. Thus BIM-based construction project is increased and used in whole fields of AEC industry. Quantity take-off and estimation fields are important factor for decision-making in conceptual and schematic design stages of construction projects. The purpose of this study improves reliability of the estimation through QTO based on Open BIM. Scope and method to apply QTO is to select conceptual design stage through LoD(Level of Detail) in AEC field and to extract information from BIM model through analysis of IFC structure. This study proceeds three step to make BIM model and check the model quality and calculate QTO. The methodology of QTO using IFC is to verify of result in this study and expects utilizing in design stage of construction projects. The result from this study is expected to decrease the risk factor and time of estimation in the project early phase through improving reliability of schematic estimation.

  • PDF

오피스 건물에 대한 BIM기반 구조설계 프로세스의 적용사례 (Application Case Study on the BIM based Structural Design Process for Office Buildings)

  • 신태송;엄진업
    • 한국강구조학회 논문집
    • /
    • 제24권3호
    • /
    • pp.301-312
    • /
    • 2012
  • 본 연구에서는 가상건설시스템 개발 연구를 통해 구축된 BIM 기반 구조설계 프로세스와 개발 시스템을 적용하여 오피스 건물을 대상으로 사례 연구를 수행하였으며, 그 결과로부터 프로세스 및 개발 시스템의 적용에 따른 업무의 생산성과 경제성을 평가하였다. 사례 연구는 강구조를 주요 대상으로 하여, 구조해석모델 및 기본설계도서를 시작으로 기본실시모델과, 실시구조모델의 생성을 단계적으로 수행하였으며, 완성된 실시구조모델을 IFC를 이용하여 통합모델을 구축하여 다양한 BIM 설계도구와의 상호운용성을 검토하였다. BIM 프로세스를 구축하여 업무환경을 효율적으로 개선할 수 있었고, 접합부 모델링 자동화로 업무의 생산성을 향상시킬 수 있었다.

BIM 데이터 기반 현장 시공관리 사례 분석 연구 (A Case Study on Construction Management Based on BIM Data)

  • 이동준;현진오;민성규;임지용;신민철;권석현
    • 대한토목학회논문집
    • /
    • 제44권2호
    • /
    • pp.223-229
    • /
    • 2024
  • 국토교통부에서는 설계 BIM 데이터를 시공 단계에 반영하기 위해 『건설산업 BIM 시행지침 시공자 편』을 제시하였다.(이하, '시행지침'이라 함.) 시행지침은 건설산업 전 분야의 전면 BIM 적용을 위하여 발주, 설계, 시공단계에 필요한 최소한의 BIM 업무 방법 및 절차 등의 세부 공통 실행방안의 가이드라인을 제공하기 위한 목적으로 작성되었다. 본 연구에서는 시행지침을 기준으로 간섭 및 설계오류를 검토하고, 장비배치 및 운영계획을 수립했던 다양한 현장에 대해 적용 효과를 파악하였다. 그 결과, 디지털 현장 3D 모델과 계획 모델을 한 공간에서 비교하여 직관적인 검토가 가능하였고, 시공 단계별 시뮬레이션 검토를 통해 최적의 장비배치 및 운용계획을 도출하였다.

BIM Model 기반 철근 수량산출 시 고려사항 (Considerations When Quantity Take-Off of Rebar Based on the BIM Model)

  • 정서희;김주용;김광희
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.73-74
    • /
    • 2023
  • The purpose of this study is to derive the cause of the quantity difference and present the considerations when take-off rebar quantity based on BIM model by comparing the quantity of rebar based on BIM model with 2D drawing. This research was limited to take-off the quantity of rebars in the building frame work, and after take-off the quantity of rebars by 3D modeling the 2D drawing of the target building with Revit, the quantity difference was compared with 2D-based software. Therefore, when take-off the quantity of rebars based on the BIM model, instead of take-off the existing 2D-based quantity premium proportion, according to general structural consider development length, lap splice length, covering thickness, reinforcing bars and spacing. In the future, this study is expected to contribute to improving the accuracy of BIM-based frame construction quantity take-off.

  • PDF