• 제목/요약/키워드: Construction Area

검색결과 5,584건 처리시간 0.035초

콘크리트 구조물 기반 녹화 공사에 있어서 콘크리트의 내구안전성 확보를 위한 방수 및 방근 기술의 제고 (Reconsideration of Waterproofing and Rootproofing to keep Durable Safety of Concrete Structure in the Greening System)

  • 오상근;김현수;김영근;권시원
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 2008년도 추계 학술발표회 제20권2호
    • /
    • pp.927-930
    • /
    • 2008
  • Recently, the scale and form of the construction promoting in government and private organization have large scaled town. The underground area of whole town are used for every facilities, and most of concrete area are used for greening part for friendly environment construction. This greening part for concrete area have good point such as being amendment and various economical effect and improvement for environmental problem, moreover, the amount of greening part become great increased. For this factor, we have to newly consider to keep durable safety for concrete structure, therefore, we suggest that how to keep structural safety of greening area on the concrete.

  • PDF

효과적인 극한지 건설환경 분석을 위한 현지 3차원 가시화 방안 연구 (A Study on Local Three-Dimensional Visualization Methodology for Effective Analysis of Construction Environments in Extreme Cold Regions)

  • 김의명;이우식;홍창희
    • Spatial Information Research
    • /
    • 제20권6호
    • /
    • pp.129-137
    • /
    • 2012
  • 극한(寒)지에서 건설사업을 수행하기 위해서는 건설의 초기 단계인 기획, 설계단계부터 지형자료와 같은 현지에 대한 기반 데이터가 반드시 요구되며, 필요에 따라 수시로 현지조사를 수행할 필요가 있다. 그럼에도 극한지는 지역적 특성상 대부분 원거리에 있고 접근이 용이하지 않다는 특성이 있으며, 특히 남극과 같은 특수지역은 현지 조사를 수행하는 것 자체가 어렵고, 현지조사를 수행한다 해도 현지를 방문할 수 있는 인원이 매우 제한적이어서 대부분은 현장을 모르고 건설에 참여하게 됨으로써 의사결정 오류나 설계 오류 등이 발생할 확률이 높아지게 된다. 따라서 본 연구에서는 이러한 문제를 해결고자 남극 장보고기지 건설지 주변을 연구대상지로 선정하여 원격탐사를 통해 광역적 지형데이터와 노출지반 암석분류데이터를 구축하는 방법과 건설부지에 대해서는 정밀 지형데이터를 구축하는 방법 등을 살펴보았다. 또한, 3차원 GIS 기술을 통해 이러한 데이터를 통합적으로 관리하고 가시화함으로써 모든 건설참여자가 현장 감각을 익히고 수시로 필요한 분석을 수행할 수 있도록 하는 방법을 제시하고자 하였다. 이를 통해 건설사들이 실제 극한지 건설공사를 수행하고자 할 때 현지 공간데이터를 DB화하고 3차원 가시화함으로써 건설환경을 필요시 마다 분석할 수 있어 의사결정이나 설계 등 건설 업무를 지원할 수 있을 것으로 기대한다.

해수면 어장에서의 소음.진동영향분석 연구 (A Study on the Influence Analysis of noise and shaking in Fishing Area of the Surface of Sea)

  • 이용희;김봉익
    • 한국항만학회지
    • /
    • 제14권3호
    • /
    • pp.341-351
    • /
    • 2000
  • This study is on the purpose that the influence caused by noise and shaking through construction works shall be ranged to the fishing species of fishing area of the surface of sea. This study have been performed through analysis of physical effect by the value of noise and shaking test. The resulted purpose of this study has been carried out regarding whether influence factor of the fishing species and others are related or not as per the noise and shaking. For the purpose of the survey of noise and shaking, observances have been performed regarding the direct water surface of fishing area are as well as undersea. As for this result, the influence area for the injury at the fishing area caused by the noise and shaking have been stretched out to the distance of 10km from the source of sound. In this conclusion, this study is regarded as the reference basis of the compensation of injury for the species of fish and others in fishing area.

  • PDF

조경공사 공정관리를 위한 공정진도의 특성에 관한 연구 -주택단지 조경공사 사례를 대상으로- (A Study on the Specificity of Construction Progress for Landscape Construction Schedule Management -With regard to Landscape Construction of Housing Complex-)

  • 박원규
    • 한국조경학회지
    • /
    • 제20권4호
    • /
    • pp.93-101
    • /
    • 1993
  • The purpose of this study is to analyze th especificity of landscape construction progress in order to develop the model of landscape construction schedule management. Nine case study area in housing complex was selected and the graphic curve of the accumulative payment by landscape construction schedule was analyzed. And the results are as follows: The graphic curve of common construction progress is S-curve but that of landscape construction progress is parabolic-curve, because landscape construction concentrally progress in last period of construction schedule. And particularly parabolic-curve seems to rise up suddenly in the last period when landscape construction amount is small.

  • PDF

Utilizing SWOT Model to Define a Strategy for the Korean Construction Companies in Preparation of the Changes in the Global Construction Market

  • Kim, HwaRang;Jang, HyounSeung
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.486-490
    • /
    • 2015
  • SWOT model was used to develop strategies for the Korean construction firms in entering the global construction market. Literature review, official statistics survey and other research methods were utilized in order to extract internal and external environmental factors of both the firm and local area. By extracting strength, weakness, opportunity and threat factors, a total of 12 strategies were produced: SO (Strengths-Opportunities), ST (Strengths-Threats), WT (Weaknesses-Threats), and WO (Weaknesses-Opportunities). The result of the study can be utilized as a basic data in developing a strategy for the Korean construction firms to penetrate into the global construction market.

  • PDF

Review of Construction Business Intelligence Research

  • Baek, Seungwon;Han, Seung Heon;Yun, Sungmin;Jung, Wooyong
    • 국제학술발표논문집
    • /
    • The 8th International Conference on Construction Engineering and Project Management
    • /
    • pp.371-380
    • /
    • 2020
  • With the 4th industrial revolution, many advanced information technologies are being applied to the area of construction engineering and project management. These applications are usually focusing on design, construction and operation stage and are producing many meaningful fruits. Even though these studies are very important for the development of the construction industry, this study insists that the other stage perspective such as construction business also should be emphasized. Because business phase has significant impacts on the success of a construction project as well as design, construction and operation phase. So, this study reviewed the intelligent-approach papers in planning and marketing, estimation and bid, contract and claim, and project financing fields. This study provides some insights such as values, difficulties, limitations and future directions of business intelligence application.

  • PDF

SELECTING OPTIMUM MANAGEMENT PRACTICES IN PRE-CONSTRUCTION PHASE CONSIDERING PROJECT CHARACTERISTICS

  • Hee-Sung Cha;Ki-Hyun Kim;Young-Jin Ko
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.609-613
    • /
    • 2011
  • The importance of project performance management as an alternative for solving problems is rising, which are followed by the difficulties of managing construction project in the construction industry. This research classifies and applies the potential improvement made by the construction practitioners. In order to apply influential factors for success on the construction project, the research identifies the relationship between the factors and performance management practices. In addition, in order to predict the results reflecting the project characteristics which are un-improvable by the construction managers in the initial stage of construction, the effect of project characteristics to the identified management practices have been drawn by performance area. Finally, in order to improve the predicted performance, this research provides a framework in setting valid best practices according to the performance areas through a statistical analysis between the best practices and project characteristics through the industry survey.

  • PDF

업무분야 규제의 폐지에 따른 종합 및 전문건설사업자들의 상호시장 진출 수준 분석 (Analysis of Mutual Market Entry Level between General and Specialty Contractors according to Abolishing the Regulation of Business Area)

  • 이치주;강형주;문혁;김민철
    • 한국건설관리학회논문집
    • /
    • 제21권2호
    • /
    • pp.59-69
    • /
    • 2020
  • 건설산업의 경쟁력 향상을 위하여 업역규제가 폐지되었으며, 종합 및 전문건설사업자들이 상호시장에 진출할 수 있게 되었다. 정부에서는 후속단계로, 세분화된 업종을 대분류하는 업종체계의 개편을 준비 중이다. 업역규제의 폐지가 건설산업에 미치는 영향을 분석한 자료가 있다면, 업종개편을 단계적으로 적용하기 위한 범위의 결정에 도움을 줄 수 있을 것이다. 본 연구는 상호시장 진출의 가능성이 높은 종합 및 전문건설사업자들의 업종들을 도출한 후, 시장규모를 분석하여 업역규제의 폐지 효과를 설명하고자 한다. 먼저, 과거에 수행한 공사들의 연계성과 등록기준의 유사성을 기반으로, 종합건설사업자들이 진출 가능한 전문공사를 분석하였다. 분석결과, 15개의 전문공사에 진출할 수 있었으며, 시장규모는 2017년 전문공사의 총 수주금액인 약 96조원의 약 82%(78.8조원)으로 분석되었다. 다음으로, 업무내용의 관련성을 기반으로 전문건설사업자들이 진출할 가능성이 높은 종합공사와 시장규모를 분석하였다. 분석결과, 4개의 종합공사에 진출할 수 있는 시장규모는 2017년 종합공사의 총 수주금액인 약 190조원의 약 13%(24.7조원)으로 분석되었다. 본 연구의 분석결과에서는 종합건설사업자가 전문공사 시장으로 진출할 가능성이 전문건설사업자가 종합공사 시장으로 진출할 가능성이 더 클 것으로 나타났다. 하지만, 본 연구는 업종별 업무내용과 등록기준, 업역규제가 폐지되기 전의 공사실적을 기반으로 분석한 한계가 있다. 향후에 업종별 업무내용과 등록기준이 변경된다면, 본 연구의 결과와 차이가 있을 수 있을 것이다.

새만금간척에 따른 미티게이션 (Mitigation for the anti-function in caused by Saemangeum reclamation)

  • 신문섭
    • 한국농공학회:학술대회논문집
    • /
    • 한국농공학회 1999년도 Proceedings of the 1999 Annual Conference The Korean Society of Agricutural Engineers
    • /
    • pp.169-174
    • /
    • 1999
  • The reclamation area of Saemangeum (Kunsan) located between 126$^{\circ}$10' -126$^{\circ}$50'E and and 35$^{\circ}$35'N -36$^{\circ}$05'N at the western coast of Korea. The construction of the 33km sea dike is building in the Saemangeum area. When the construction of the sea dike in the coastal region takes plase, there exists a certain amount of soil which is diffused by the tidal current. Behavior of the soil diffusion usually depends on its intrinsic characteristics, bathymetry, construction method and used mchinery. The amount of soil at the construction acts as a pollutant which is the cause of changing the marine environment. When the soil material is diffused , it may form a layer which obstructs the light passing into the sea and causes the extinction or alteration of the living beings on the sea bottom. The settlement of soil material could change the sea bottom deposit. The purpose of MITIGATION is to harmonize the development and the conservation of environment, to restrict environmental destruction and to reproduce the enviroment damaged by the construction in the coastal region. The purpose of this study is to find the method by which we minimize the anti-function of development in the coastal region. Tide and tidal current are calculated using a two-dimensional numerical model before the construction of sea dike in Saemangeum Bay. The numerical results are compared well with field observations. On the basis of these results, we caculated the tide and tidal current after the construction of the sea dike in order to investigate the change of the tide and tidal current after the construction of the sea dike. Moreover, we calculated the tide and tidal current after the construction of submerged breakwater in order to preserve the enviornmental condition of creature habitat . We compared the tide and tidal current before and after the construction of submerbed breakwater, to investigate the possbility of MITIGATION in the fisheries.

  • PDF