• Title/Summary/Keyword: Consolidation Settlement

Search Result 477, Processing Time 0.024 seconds

A Study on the Long-term Settlement Characteristics of Thick Clay Deposits Using Field Monitoring (대심도 연약지반의 현장계측을 이용한 장기침하거동특성 분석에 관한 연구)

  • Kwon, Hyun-Wook;Im, Jong-Chul;Chang, Ji-Gun;Kang, Sang-Kyun
    • Journal of the Korean Geosynthetics Society
    • /
    • v.17 no.4
    • /
    • pp.21-28
    • /
    • 2018
  • Despite a number of studies on consolidation behavior that have been carried out in the Nakdong River estuary in Busan, these are focused on the prediction of final settlement during ground improvement process, and there is almost no research on the long-term settlement occurring after that. For the practical study on the long-term settlement, the field monitored settlement data that measured over 10 years in the Busan new port facilities area were used, and the final settlement and predicted time-settlement line were constituted by hyperbolic function. As a result, the measured settlements depend on the thickness of clayey soils, and the pattern were similar to each other and good agreement with the predicted time-settlement line using hyperbolic method. Also, the settlement in the lower non-improved layer occupied 62-76% of total settlement. Information about above results would be quite helpful to understand the long-term settlement behaviors as well as the non-improved layer's settlement is more careful consideration needed at design phase.

Estimating Void Ratio Changes of a Pre-loading Site Using Bender Elements Sensors (벤더 엘리먼트 센서를 이용한 선행 재하공법 현장의 간극비 변화 추정)

  • Kim, Hak-Sung;Jung, Young-Hoon;Kim, Byung-Chul;Mok, Young-Jin
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.09a
    • /
    • pp.1110-1116
    • /
    • 2010
  • Void ratios are one of the key parameters for exact calculation of settlement of soft groundse. In the study, shear wave velocities of a soft ground were used to measure the field void ratio using bender elements sensors. The bender-element probes were installed in situ at the depths of 3, 5 and 8m on a pre-loading site near Incheon, Korea. During 90 days after installation, the changes of shear wave velocity and ground surface settlement were measured. The field void ratio was estimated from measured shear wave velocities. The void ratio estimated by the shear wave velocity measured by bender elements agrees well with the measured values in the field.

  • PDF

Field Test of Recycled Aggregates and Crushed Stone as Horizontal Drains (수평배수재용 순환골재와 쇄석의 현장시험)

  • Kim, Si-Jung;Lee, Dal-Won
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.54 no.1
    • /
    • pp.39-45
    • /
    • 2012
  • In this study, field test on utilization of recycled aggregates and crushed stone as horizontal drains to use an alternative material of sand in soft ground is practiced. The settlement with time showed similarly ranged from 28.4-30.3 cm in the all horizontal materials. The excess pore water pressure of the recycled aggregates and crushed stone showed smaller than sand. The small the excess pore water pressure becomes faster the consolidation period and it can reduces the amount of residual settlement. Therefore, it was verified as having enough to an alternative materials that the field applicability is excellent. The distribution of earth pressure with time showed similarly in the all horizontal materials. The recycled aggregates and crushed stone was very applicable to practice because there is no mat resistance in the horizontal drains layer. The penetration rate in the SCP and PVD improvement sections did not show large differences as the grain size and the horizontal drainage height increases.

A study on evaluation of duplex loading pressure in Suction Drain Method (Suction Drain 공법에서 양방향 압력재하에 의한 효율 평가에 관한 연구)

  • Ahn, Dong-Wook;Chae, Kwang-Seok;Han, Sang-Jae;Yoon, Myung-Seok;Kim, Soo-Sam
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.03a
    • /
    • pp.1256-1263
    • /
    • 2010
  • Suction Drain Method is soft ground improvement technique, in which a vacuum pressure can be directly applied to the Vertical Drain Board to promote consolidation and strengthening the soft ground. This method does not require a surcharge load, different to embankment or Preloading Method. In this study, ground improvement efficiency of suction drain method was estimated when duplex loading pressure with vacuum and pressure. During suction drain method process, surface settlement and pore pressure were monitored, and cone resistance test as well as water content were also measured after the completion of Suction Drain Method treatment.

  • PDF

Experimental Study on Consolidation and Bearing Capacity Characteristics of Marine Large Pack Pile (MLPP 공법의 압밀 및 지지력 특성에 관한 실험적 연구)

  • Lee, Sang-Ik;Park, Yong-Won;Ihm, Chul-Woong;Kim, Il-Gon
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.03a
    • /
    • pp.272-279
    • /
    • 2005
  • This paper introduces a new method of improvement for marine soft ground, MLPP(Marine Large Pack Pile). The MLPP is a reinforcement technique for the conventional SCP or GCP piles by confining with geotextile pack. A pilot project at Busan New Port site and laboratory model tests were carried out to investigate the settlement reduction and bearing capacity enhancement effect of pack pile. The results of field and laboratory tests show that MLPP method can be a safe and economic alternative method for SCP and GCP.

  • PDF

LARGE CONSOLIDATION SETTLEMENT OCCURRED DURING RECLAMATION WORKS IN THE NAKDONG RIVER MOUTH (낙동강 하구 지반 매립시 발생된 과다 압밀침하)

  • 김상규
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1999.11b
    • /
    • pp.35-48
    • /
    • 1999
  • The Nakdong River in Korea has formed a delta area .called the Kimhae Plain near the river mouth. Its clay deposit is unusually thick (up to 60m) compared with the clays deposited in other parts of the world. Some parts of the area has been reclaimed with the height of approximately 5 to 7m after installing vertical drains for the development of important new industrial complexes. Settlement measurements were taken during the reclamation works on the soft ground, and it was revealed that the measured settlements were extremely higher than predicted. This paper discusses possible reasons on unusual large settlements from depositional environments of Kimhae clay.

  • PDF

Parametric study on flexible footing resting on partially saturated soil

  • Singh, Mandeep;Sawant, V.A.
    • Coupled systems mechanics
    • /
    • v.3 no.2
    • /
    • pp.233-245
    • /
    • 2014
  • Coupled finite element analysis is carried out to study the effect of degree of saturation on the vertical displacements and pore water pressures simultaneously by developing a FORTRAN90 code. The finite element formulation adopted in the present study is based upon Biot's consolidation theory to include partially saturated soils. Numerical methods are applied to a two-dimensional plane strain strip footing (flexible) problem and the effect of variable degree of saturation on the response of excess pore water pressure dissipation and settlement of the footing is studied. The immediate settlement in the case of partly saturated soils is larger than that of a fully saturated soil, the reason being the presence of pore air in partially saturated soils. On the other hand, the excess pore water pressure for partially saturated soil are smaller than those for fully saturated soil.

USE OF FIBREDRAIN IN DREDGED CLAY RECLAMATION PROJECT

  • Lee, S.L.;Yong, K.Y.;Soehoed A R
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2001.11a
    • /
    • pp.96-109
    • /
    • 2001
  • Land was reclaimed at the waterfront in the Pluit area of Jakarta for a 90ha residential-cum-recreational development. The reclamation works involve construction of permanent and temporary dykes, fill placement, soil improvement, dredging of internal canals and marina, and construction of canal revetment. The site lies on 16m to 18m thick soft seabed deposits. Settlement of the reclaimed areas will result as a consequence of consolidation of the soft underlying sediments. In order to reduce post-construction settlement to within acceptable levels, a system of vertical drains and preloading was adopted. This paper describes the use of Fibredrain, a prefabricated vertical drain made of jute and coir fibres developed at the National University of Singapore, in the soil improvement works and a secondary use in the construction of perimeter dykes for the reclamation works. The construction of the perimeter dyke must be carried out in such a way that slope stability is on ensured. Bamboo rafts and bamboo clusters with Fibredrain inserted, and stage construction were employed to improve stability during the dyke formation for the Pantai Mutiara project.

  • PDF

Study on Ground Surface settlement of a 3-Arch-shaped Tunnel (3아치터널의 지표면 침하에 관한 연구)

  • Shin Kang Ho;Park Tu Sung;Park O Sung;Kim Jae Kwon
    • Proceedings of the KSR Conference
    • /
    • 2004.06a
    • /
    • pp.1007-1013
    • /
    • 2004
  • A three-arch NATM tunnel with a total length of 53.5m has been constructed for a metropolitan subway station in Daejon, Korea. The tunnel, whose crown is located 22m below the ground, crosses the old Daejon station underneath. Since the tunnel comprises a very large section (10${\times}$28 m; largest in Korea), it shows complicated mechanical behaviors, especially near portal, due to its short length relative to width. As far as its construction step is concerned, the center tunnel is excavated with pre-excavated pilot tunnel, which is a unique feature of this tunnel (first in Korea) to secure safety during construction and prevent excessive settlements. The both side tunnels are then excavated along with the center tunnel. Since significant amount of settlement was predictable from the design stage, extensive monitoring was performed during construction. During excavation of the side tunnels, unexpected large settlements up to ${\~}$140mm (estimated 41.8 mm at design stage) was measured at the center tunnel. In this paper, we study the causes of this unusually large ground settlement. We believe that the extra-wide tunnel excavation increases the stress influence zone of portal in longitudinal direction and consequently add more settlements to the existing due to excavation and consolidation.

  • PDF

A Study on the tension of Geogid on Pile-supported Construction Method (성토지지말뚝공법 중 섬유보강재의 인장력 검토에 관한 연구)

  • Moon, In-Ho;Park, Jong-Gwan;Lee, Il-Wha
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.905-917
    • /
    • 2008
  • Road or Railway construction over soft ground is needed to be considered on secondary consolidation which will be caused differential settlement, lack of transport serviceability, higher maintenance cost. Especially for the railway construction in the second phase of Gyung-Bu or Ho-Nam high speed railway, concrete slab track has been adapted as a safe and cost effective geotechnical solution. In this case controlling the total settlement under the tolerance is essential. And pile supported geogrid reinforced construction method is suggested as a solution for the problem of the traditional method on soft soil treatments. Pile supported geogrid reinforced construction method consists of piles that are designed to transfer the load of the embankment through the compressible soil layer to a firm foundation. The load from the embankment must be effectively transferred to the piles to prevent punching of the piles through the embankment fill creating differential settlement at the surface of the embankment. The arrangement of the piles can create soil arching to carry the load of embankment to the piles. In order to minimize the number of piles geogrid reinforced pile supported construction method is being used on a regular basis. This method consists of one or more layers of geogrid reinforcement placed between the top of the piles and the bottom of the embankment. This paper presents several methods of pile supported geogrid reinforced construction and calculation results from the several methods and comparison of them.

  • PDF