• 제목/요약/키워드: Concrete stream grade stabilization structures

검색결과 3건 처리시간 0.017초

동해안 대형 산불피해지의 사방사업 실태진단 (The investigation of erosion control works' condition in East sea fire area)

  • 염규진;전근우;차두송;이시영;이현규;이명욱;김윤진;이진호;김석우;강기차부
    • 한국방재학회:학술대회논문집
    • /
    • 한국방재학회 2007년도 정기총회 및 학술발표대회
    • /
    • pp.509-512
    • /
    • 2007
  • The fire area need management to prevent enlargement of collapes and sinkage. and it need that repair Vegetation sack work, Soil arresting structure, Terrace-sodding works, Direct seeding works in greening works and Water cushion in erosion control dam. The whole of the Concrete stream grade stabilization structures were broken, it need to be repair. As pass the time, a lot of structures were abandoned. Therefore, it need to reorganize erosion control structures and the method of construction in the fire area

  • PDF

산지계류에 설치된 계상구조물이 어류의 이동에 미치는 영향: 버들치를 중심으로 (Influence on the Movement of Fish by the Installation of Structures in Mountain Streams: Focused on Chinese Minnow)

  • 마호섭;박재현
    • 한국산림과학회지
    • /
    • 제108권2호
    • /
    • pp.224-232
    • /
    • 2019
  • 산지계류에서 다양한 계상공작물의 설치에 따른 어류의 상부 및 하부로의 이동상태를 조사하여 분석한 결과를 요약하면 다음과 같다. 콘크리트 박스공과 같은 개방형 구조물의 경우 강우의 영향으로 유량이 늘어나는 시기에는 낙차의 높이가 줄어드는 효과가 발생하여 버들치와 같은 유영성 어류들은 상부에서 하류로의 이동과 하부에서 상부로 소상하는데 비교적 양호하였다. 또한, 1 m 미만의 돌낙차공, 돌바닥막이 등 횡단 계상구조물은 상부에서 방사한 버들치의 개체가 하부에서 재 포획되어 구조물 상부에서 하부로의 이동은 가능하였으나, 유량이 많은 장마 직후에도 하부에서 상부로의 소상은 어려운 것으로 나타났다. 특히, 3 m 이상의 사방댐 등 횡단 사방공작물도 댐의 하단부에 물빼기 구멍의 수가 적거나 어류를 위한 소통 공간이 없는 경우는 유량이 많아도 버들치의 이동에 제한을 받고 있는 것으로 나타났다. 버들치는 활발하게 행동은 하지만 계상구조물의 유형 및 구조적인 특성에 따라 이동에 제한을 받고 있다. 산지 계류에서 구조물을 설치할 때에는 구조물의 종류, 높이 및 어류서식 상태와 평소 계류에 물이 있는 지를 고려하여 어류가 소통할 수 있도록 가능한 높이를 낮추거나 개방형의 구조물을 적절하게 설치할 필요성이 있다.

북한산국립공원 계곡 내 인공구조물에 대한 경관선호 분석 - 바닥막이, 기슭막이, 낙차공을 중심으로 - (Analysis of Scenery Preference of the Artificial Structure in Valley within Bughansan National Park - With a Special Reference on Stream Grade-Stabilization Structure, Revetment and Drop fall Structure -)

  • 박재현
    • 한국환경복원기술학회지
    • /
    • 제8권2호
    • /
    • pp.21-32
    • /
    • 2005
  • Questionnaire survey from 101 visitors and 77 specialists was carried out to establish the management plan on landscapes of the artificial structure constructed in valley within Bughansan National Park. When comparison was made between ground sill work structure and valley landscape, visitor group responded to the highest scores in valley landscape after planting of vine species in the bottom of the constructure, while specialist group responded to valley landscape after the removal of the constructure. When it made a comparison between revetment work constructure and valley landscape, visitor group responded to highest scores in valley landscape after planting of vine species in the top of the constructure, while specialist group responded to valley landscape after replacing concrete revetment by stone revetment constructure. When it made a comparison between fall work constructure and valley landscape, both groups responded to the highest scores in valley landscape after the removal of the constructure. According to the valley landscape analysis, artificial constructures built in water channel should be matched to adjacent landscape with the removal of concrete constructure. The slope of water channel should be considered to build fall work constructure.