• Title/Summary/Keyword: Compensation calculation standard

Search Result 14, Processing Time 0.029 seconds

A Study on Calculation Method of Compensation for Indirect Damage of Fishery by Undertaking Public Project (공익사업시행(公益事業施行)으로 인한 어업(漁業)의 간접피해(間接被害) 보상액(補償額) 산출방법(算出方法)에 관(關)한 연구(硏究))

  • Kim Ki-Dae;Kim Byung-Ho
    • The Journal of Fisheries Business Administration
    • /
    • v.37 no.1 s.70
    • /
    • pp.25-44
    • /
    • 2006
  • Under the provision of Article 63 of the Enforcement Regulation of the Act on Acquisition and Compensation of Land and Others for Public Project that is recently enacted and implemented (hereinafter referred to as the 'Lend Compensation Act') the compensation is required to make 'When the Actual Damage Amount' is confirmed for the damage in fishery affairs that is outside of the public project area. The compensation for fishery business on the indirect damage area has been excluded from the advance compensation subject to conflict with the existing laws on fishery business compensation with the controversy in method, procedure, time and others to confirm the actual damage amount, and it lacks the standard of calculation for detailed compensation on partial damages outside of business implementation area, which caused the ceaseless conflicts and straggles between the project implementation party and the victimized fishermen regarding the calculation method of damages, standard, compensation period and others. In particular, from the numerous problems in damage compensation in fishery on the indirect damage area, the most recent problem emerged is the issue on application method of damage period in calculating the damage compensation amount that the struggle has been deepened with the differences between the project implementation party and the victimized fishermen without the stipulation on the compensation, that caused the difficulties in carrying out the public project and other serious social problems. In this study, the reasonable application method for the damage period and the calculation plan of the damage amount for calculating the damages on fishery industry outside of the public project implementation zone that is not fully specified under the Land Compensation Act, and the indirect damage area is not influenced for the notification of project recognition, and the compensation to undertake with the damage in the fishery industry in project implementation area to have the nature of damage compensation, the right to engage in fishery industry has the perpetual nature of rights, the fishery damage compensation system of Japan also recognizes the perpetual right on fishery industry to calculate the compensation amount, and the compensation for damage amount has been exercised for the period of actual damage occurrence period regardless of remaining effective period for most of fishery permit and license for fishery compensation outside of the project implementation area following the recent various public projects as well as the development process of theory on fishery loss compensation that the calculation of damage amount on the fishery industry outside of the project implementation zone would be prudent to compensate by calculating the applicable damages during the period of actual damages, and by doing so, the 'just compensation' guaranteed under the Constitution may be materialized. Therefore, the calculation of the damages from the implementation of the public project shall consider the actual period of damages and the degree of damage from the public project to calculate by the income capitalization method, however, considering the equitable consideration with the compensation following the cancellation, it shall not exceed the compensation following the termination of the applicable fishery businesses. Furthermore, the calculation method of partial damage amount on the fishery business following the project implementation shall apply, depending on the period of damage occurrence, by (1) the case of calculating the future damage amount at the present time, and (2) calculating the damage from the past to the present time as well as the damage to be incurred later, by selecting the calculation method for damages following the damage occurrence type.

  • PDF

A Study on Improvement of the Calculation Methodology of Employee Invention Compensation (직무발명 보상액 산정 방법론의 개선 방안 연구)

  • Cho, Myunggeun;Lee, Hwansoo
    • Asia-pacific Journal of Multimedia Services Convergent with Art, Humanities, and Sociology
    • /
    • v.7 no.12
    • /
    • pp.101-110
    • /
    • 2017
  • According to the Statistics Korea in 2016, 56.9% of companies do not fairly pay compensation for employee invention, despite the increasing proportion of the inventions in corporations. One reason is that the objective calculation method for employee and patent's contribution and the clear standard of fair compensation have not been established. Therefore, this study proposes a new calculation method using DCF (Discounted cash flow) and AHP (Analytical hiearchy process) methodology to calculate the fair amount of employee invention compensation, and verified it through real case examples. As a result, 2.3 times higher amount of compensation was calculated than the previous approach. This study is meaningful that it provided objective compensation criteria that could more protect the inventor in the situation which the clear criteria for the calculation of fair compensation are not established. This methodology is expected to be applicable for SMEs as employee invention compensation.

A Study on the Realization of Dust Damage Compensation Calculation for the Prevention of Dust Damage in Construction Site (공사장 먼지피해 예방을 위한 먼지피해 배상액 산정 현실화 방안 연구)

  • Kim, Jinho
    • Journal of the Society of Disaster Information
    • /
    • v.18 no.2
    • /
    • pp.374-385
    • /
    • 2022
  • Purpose: Even if a damage is applied to the dust of the construction site containing the first-class carcinogen, it is dismissed or 5~30% of the amount of noise damage compensation is paid., Because of such loopholes, some construction companies are neglecting the dust management of the construction site, and the damage of the workers and the residents in the construction site continues. Method: The purpose of this study is to examine the problems of the calculation criteria of damage compensation amount of construction site dust, the measurement of dust concentration, the analysis of measurement data (the data of electric signboard measuring device by the mining scattering method), the prediction and evaluation methods such as modeling, and to suggest improvement measures. Result: It is found that it is impossible to calculate the amount of damages from dust damage in the construction site by calculating the current dust damage compensation amount and dust concentration modeling and measurement. Conclusion: It will receive an application for compensation for damage within the site where damage is expected (about 100m in the straight line and the boundary line of the site), and present a method of calculating the amount of compensation that differentially evaluates dust damage to the degree of dust management and compliance with dust-related legal standards.

Development of Standard Estimates for Garden Construction: Focused on Planting

  • Hong, Kwang-Pyo;Lee, Hyukjae
    • Journal of People, Plants, and Environment
    • /
    • v.22 no.5
    • /
    • pp.467-480
    • /
    • 2019
  • Standard estimates are the numerical data of a unit quantity required for construction work such as the amount of materials, manpower, and the use of equipment required and are also a basis to calculate construction costs. Unfortunately, standard estimates for construction have also been used for garden construction these days as no standard estimates for garden construction have been developed or documented until now. As a result, many problems have arisen at garden construction sites since landscape construction and garden construction differ in terms of scope, size, design and construction methods. The purpose of this study was to develop standard estimates for garden construction for proper calculation of the cost of garden construction and to ensure gardens are created following appropriate construction processes. In order to develop standard estimates for garden construction, a preliminary survey was conducted on experts to understand current issues at first. After that, a questionnaire survey was done to examine problems of construction processes and ways of improvement, and on-site inspections were conducted utilizing CCTVs at construction sites to identify the actual amount of manpower required on site. Based on the results of the surveys and on-site inspections, a draft version of standard estimates for 5 types of planting work for garden construction was developed. Developing standard estimates for garden construction will serve as a stepping stone for the transparent and proper compensation for garden construction work, which will not only contribute to addressing issues between consumers and construction companies, but also to the stabilization of market economy and job creation.

A Study on the Compensation Method in the Measuring System for Chopped Lightning Impulse (충격전압 재단과 측정을 위한 보상회로에 관한 연구)

  • Kim, Ik-Soo;Kim, Young-Bae;Kim, Jin-Gi;Kim, Min-Kyu
    • Proceedings of the KIEE Conference
    • /
    • 1996.07c
    • /
    • pp.1895-1897
    • /
    • 1996
  • Lightning impulse voltage is essential to evaluate the insulation performance of electric power apparatus. Recently international standard (IEC-60) on high voltage measurement techniques are being revised. In the draft of this standard, a new calibration method is introduced and the accuracy of most industrial measuring systems is maintained by means of comparison test against the reference measuring systems. Comparison tests of dividers for chopped lightning impulse measurement were rallied out by KERI. The 700kV shielded resisitive divider with and without compensation element were done comparison test with 300kV PTB divider which have the similar charateristics as that were circulated among the laboratories. This paper reports on the calculation results of response charateristics obtained by EMTP and the comparison test results with chopped lightning impulse voltages from 150kV to 250kV. It is demonstrated that KERI are capable of realizing the idea in the revision of the IEC standand, that is, to establish traceability.

  • PDF

Design of Prediction Unit for H.264 decoder (H.264 복호기를 위한 효율적인 예측 연산기 설계)

  • Lee, Chan-Ho
    • Journal of the Institute of Electronics Engineers of Korea SD
    • /
    • v.46 no.7
    • /
    • pp.47-52
    • /
    • 2009
  • H.264 video coding standard is widely used due to the high compression rate and quality. The motion compensation is the most time-consuming and complex unit in the H.264 decoder. The performance of the motion compensation is determined by the calculation of pixel interpolation and management of the reference pixels. The reference pixels read from external memory using efficient memory management for data reuse is necessary along with the high performance interpolators. We propose the architecture of a motion compensation unit for H.264 decoders. It is composed of 2-dimensional circular register files, a motion vector predictor and high performance interpolators with low complexity. The 2-dimensional circular register files reuse reference pixel data as much as possible, and feed reference pixel data to interpolators without any latency and complex logic circuits. We design a motion compensation unit and a intra-prediction unit and integrate them into a prediction unit and verify the operation and the performance.

Low-complexity Local Illuminance Compensation for Bi-prediction mode (양방향 예측 모드를 위한 저복잡도 LIC 방법 연구)

  • Choi, Han Sol;Byeon, Joo Hyung;Bang, Gun;Sim, Dong Gyu
    • Journal of Broadcast Engineering
    • /
    • v.24 no.3
    • /
    • pp.463-471
    • /
    • 2019
  • This paper proposes a method for reducing the complexity of LIC (Local Illuminance Compensation) for bi-directional inter prediction. The LIC performs local illumination compensation using neighboring reconstruction samples of the current block and the reference block to improve the accuracy of the inter prediction. Since the weight and offset required for local illumination compensation are calculated at both sides of the encoder and decoder using the reconstructed samples, there is an advantage that the coding efficiency is improved without signaling any information. Since the weight and the offset are obtained in the encoding prediction step and the decoding step, encoder and decoder complexity are increased. This paper proposes two methods for low complexity LIC. The first method is a method of applying illumination compensation with offset only in bi-directional prediction, and the second is a method of applying LIC after weighted average step of reference block obtained by bidirectional prediction. To evaluate the performance of the proposed method, BD-rate is compared with BMS-2.0.1 using B, C, and D classes of MPEG standard experimental image under RA (Random Access) condition. Experimental results show that the proposed method reduces the average of 0.29%, 0.23%, 0.04% for Y, U, and V in terms of BD-rate performance compared to BMS-2.0.1 and encoding/decoding time is almost same. Although the BD-rate was lost, the calculation complexity of the LIC was greatly reduced as the multiplication operation was removed and the addition operation was halved in the LIC parameter derivation process.

A Study on the Improvement of the Compensation Calculation Standard for Dust Damage in Construction Sites (공사장 먼지피해 배상액 산정기준 개선방안 연구)

  • Kim, Jin-Ho
    • Proceedings of the Korean Society of Disaster Information Conference
    • /
    • 2022.10a
    • /
    • pp.239-240
    • /
    • 2022
  • 공사장에서 발생하고 있는 먼지는 현장 근로자뿐만 아니라 인근 주민들의 건강에 치명적인 영향을 미치고 있다. 공사장 인근 주민들이 환경분쟁조정위원회에 먼지피해에 대한 피해배상을 청구하고 있지만 공사장 먼지피해 수인한도 초과여부를 확인하기 위한 측정, 예측, 평가가 어려워 먼지피해에 대한 보상이 제대로 이루어지지 않고 있다. 공사장 먼지관리의 법적기준이며 먼지 저감에 대한 구체적인 방법을 제시하고 있는"비산먼지 억제조치기준"의 준수 등을 점수로 평가하여 일정 점수 이하인 경우 피해배상액을 차등 적용하는 방안을 제안한다. 본 안이 제도화된다면 건설사는 먼지피해 배상액 지출을 줄이기 위해 현재보다 한층 더 먼지 저감 노력을 강화할 것이기에 먼지 발생을 획기적으로 줄일 수 있어서 현장 근로자 및 인근 주민들의 먼지피해를 최소화할 수 있으며, 먼지로 인한 환경, 보건 법규위반예방과 쾌적한 작업환경으로 노동 생산성 확보와 먼지로 인한 피해 배상액 지급 등 손실을 줄일 수 있을 것이라고 생각한다.

  • PDF

A Study on Motion Estimation Encoder Supporting Variable Block Size for H.264/AVC (H.264/AVC용 가변 블록 크기를 지원하는 움직임 추정 부호기의 연구)

  • Kim, Won-Sam;Sohn, Seung-Il
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.12 no.10
    • /
    • pp.1845-1852
    • /
    • 2008
  • The key elements of inter prediction are motion estimation(ME) and motion compensation(MC). Motion estimation is to find the optimum motion vectors, not only by using a distance criteria like the SAD, but also by taking into account the resulting number of 비트s in the 비트 stream. Motion compensation is compensate for movement of blocks of current frame. Inter-prediction Encoding is always the main bottleneck in high-quality streaming applications. Therefore, in real-time streaming applications, dedicated hardware for executing Inter-prediction is required. In this paper, we studied a motion estimator(ME) for H.264/AVC. The designed motion estimator is based on 2-D systolic array and it connects processing elements for fast SAD(Sum of Absolute Difference) calculation in parallel. By providing different path for the upper and lower lesion of each reference data and adjusting the input sequence, consecutive calculation for motion estimation is executed without pipeline stall. With data reuse technique, it reduces memory access, and there is no extra delay for finding optimal partitions and motion vectors. The motion estimator supports variable-block size and takes 328 cycles for macro-block calculation. The proposed architecture is local memory-free different from paper [6] using local memory. This motion estimation encoder can be applicable to real-time video processing.

Fast Motion Estimation for Variable Motion Block Size in H.264 Standard (H.264 표준의 가변 움직임 블록을 위한 고속 움직임 탐색 기법)

  • 최웅일;전병우
    • Journal of the Institute of Electronics Engineers of Korea SP
    • /
    • v.41 no.6
    • /
    • pp.209-220
    • /
    • 2004
  • The main feature of H.264 standard against conventional video standards is the high coding efficiency and the network friendliness. In spite of these outstanding features, it is not easy to implement H.264 codec as a real-time system due to its high requirement of memory bandwidth and intensive computation. Although the variable block size motion compensation using multiple reference frames is one of the key coding tools to bring about its main performance gain, it demands substantial computational complexity due to SAD (Sum of Absolute Difference) calculation among all possible combinations of coding modes to find the best motion vector. For speedup of motion estimation process, therefore, this paper proposes fast algorithms for both integer-pel and fractional-pel motion search. Since many conventional fast integer-pel motion estimation algorithms are not suitable for H.264 having variable motion block sizes, we propose the motion field adaptive search using the hierarchical block structure based on the diamond search applicable to variable motion block sizes. Besides, we also propose fast fractional-pel motion search using small diamond search centered by predictive motion vector based on statistical characteristic of motion vector.