• Title/Summary/Keyword: Comparison time constant

Search Result 262, Processing Time 0.03 seconds

Comparison of CONWIP with Kanban in a Production Line with Constant Processing Times (상수 공정시간을 갖는 라인 생산 시스템에서 CONWIP과 간반의 성능 비교)

  • Lee, Ho-Chang;Seo, Dong-Won
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.36 no.2
    • /
    • pp.51-65
    • /
    • 2011
  • We compared a CONWIP(constant work-in-process) system with a kanban system in a production line with constant processing times. Based on the observation that a WIP-controlled line production system such as CONWIP and kanban is equivalent to a m-node tandem queue with finite buffer, we applied a max-plus algebra based solution method for the tandem queue to evaluate the performance of two systems. Numerical examples with 6 workstations were used to demonstrate the proposed analysis. The numerical results support the previous studies that CONWIP outperforms kanban in terms of expected waiting time and WIP. Unlike the kanban case, sequencing workstations in a CONWIP does not affect the performance of the system.

Designs and Comparison of Step and Constant-Stress ALTs for Acceleration Factor and Lognormal Lifetime Distributions

  • Sang Wook Chung;Seong-Woog Lee
    • Journal of Korean Society for Quality Management
    • /
    • v.25 no.1
    • /
    • pp.80-99
    • /
    • 1997
  • This paper considers designing the simple (2-level) constant-and step-stress ALTs minimizing the asymptotic variance of the maximum likelihood estimator of the accelaeration factor, which is defined as the ratio of the 100qth percentile at use stress to that a specified stress, for items having lognormally-distributed lives. It is assumed that (i) the log-linear relationship exists between the stress and the mean log life, (ii) the standard deviation of the log life is constant, and (iii) the cumulative exposure model holds for the effect of changing stress. For the constant-stress ALT the low stress and the sample proportion allocated to low stress are determined and for two modes of stress loading of step-stress ALTs, the low-to-high and high-to-low, the low stress and the stress change time are determined. For selected values of the design parameters the optimum plans are figured, two modes of step-stress ALTs and the constant-stress ALT are compared to each other, and the effects of the incorrect pre-estimates of the design parameters are investigated.

  • PDF

Reduction of Power Consumption for Constant Pressure Control of Variable Swash Plate-type Piston Pump by Varying the Pump Speed (가변 용적형 사판식 피스톤 펌프의 회전 속도 조절에 의한 정압 제어 소비 동력 절감)

  • Kim, J.H.;Hong, Y.S.
    • Journal of Drive and Control
    • /
    • v.11 no.4
    • /
    • pp.53-60
    • /
    • 2014
  • This paper proposes a control scheme to reduce the power consumption of a variable displacement swash-plate type piston pump supplying oil to a valve-controlled hydraulic cylinder at constant pressure. Whenever flow rate demand was absent, the swash plate angle and the pump speed were changed to the minimum values required to compensate for the internal leakage flow. In response to command signals, the pump speed was changed in proportion to the absolute mean value of the speed component for position commands. At the same time, a pressure regulator was activated to maintain constant system pressure by precisely adjusting the pump speed with the swash plate angle fixed at the maximum. The conventional system consisting of a pressure-compensated variable displacement type pump is driven at a constant speed of 1,800rpm. By comparison, computer simulation and experimental results showed that idling power at stand-by status could be reduced by up to 70% by reducing the pump speed from 1,800rpm to 300rpm and the swash plate angle to the minimum.

Estimation of Smoothing Constant of Minimum Variance and Its Application to Shipping Data with Trend Removal Method

  • Takeyasu, Kazuhiro;Nagata, Keiko;Higuchi, Yuki
    • Industrial Engineering and Management Systems
    • /
    • v.8 no.4
    • /
    • pp.257-263
    • /
    • 2009
  • Focusing on the idea that the equation of exponential smoothing method (ESM) is equivalent to (1, 1) order ARMA model equation, new method of estimation of smoothing constant in exponential smoothing method is proposed before by us which satisfies minimum variance of forecasting error. Theoretical solution was derived in a simple way. Mere application of ESM does not make good forecasting accuracy for the time series which has non-linear trend and/or trend by month. A new method to cope with this issue is required. In this paper, combining the trend removal method with this method, we aim to improve forecasting accuracy. An approach to this method is executed in the following method. Trend removal by a linear function is applied to the original shipping data of consumer goods. The combination of linear and non-linear function is also introduced in trend removal. For the comparison, monthly trend is removed after that. Theoretical solution of smoothing constant of ESM is calculated for both of the monthly trend removing data and the non monthly trend removing data. Then forecasting is executed on these data. The new method shows that it is useful especially for the time series that has stable characteristics and has rather strong seasonal trend and also the case that has non-linear trend. The effectiveness of this method should be examined in various cases.

Comparison of DBR with CONWIP in a Production Line with Constant Processing Times (상수 공정 시간을 갖는 라인 생산 시스템에서 DBR과 CONWIP의 성능 비교 분석)

  • Lee, Hochang;Seo, Dong-Won
    • Journal of the Korea Society for Simulation
    • /
    • v.21 no.4
    • /
    • pp.11-24
    • /
    • 2012
  • We compared a DBR(drum-buffer-rope) system with a CONWIP(constant work-in-process) system in a production line with constant processing times. Based on the observation that a WIP-controlled line production system such as DBR and CONWIP is equivalent to a m-node tandem queue with finite buffer, we applied a max-plus algebra based solution method for the tandem queue to evaluate the performance of two systems. Numerical examples with 6 workstations were also used to demonstrate the proposed analysis. The mathematical analyses support that CONWIP outperforms DBR in terms of expected waiting time and WIP. Unlike the CONWIP case, sequencing workstations in a DBR affects the performance of the system. Delaying a bottleneck station in a DBR reduces expected waiting time.

Finite Element Analysis in Finite Length Bar under Constant Amplitude Loading (일정진폭하중을 받는 유한 길이 봉의 유한요소해석)

  • Hwang, Eun-Ha
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.23 no.5
    • /
    • pp.525-533
    • /
    • 2010
  • Direct time integration method such as Newmark method is numerically performed under the assumption that continuous load function such as constant amplitude load can be treated as a discontinuous load fuction. It is due that the load can be treated as a constant value at the given time period regardless of variation of load at the time increment interval. It means the numerical results should be accompanied by the error due to approximation of load fuction. In contrast, the load function is calculated by convolution integral for the given time interval at finite element equation based on Gurtin's variation equation. Therefore. precise numerical results can be obtained by Gurtin's method because of convolution integral for the continuous load fuction curve even at the variation of load function in the given time interval. In this study, we prove that Gurtin's method can be more suitable than Newmark method in the problem of constant amplitude loading, using the numerical results for the free end of the one-dimensional rod. This study also shows that Gurtin's method is more effective in constant amplitude loading than in constant loading. The accuracy and the validity are verified by comparison between the results of in-house FORTRAN code and ADINA, a commercial software supporting Newmark method.

IMF 구제금융 전후의 최저임금 인상과 고용변화에 관한 실증연구 -미국과 한국의 패스트푸드 산업의 사례분석-

  • 김종권
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2004.05a
    • /
    • pp.117-127
    • /
    • 2004
  • In U.S.A., minimum wage of New Jersey in April 1, 1992 rose from $4.25 to $5.05. At this assession, there was survey by 410 numbers related back and pro minimum wage in New Jersey and eastern Pennsylvania.. At stores of New Jersey and eastern Pennsylvania, comparison of the increase of employment at constant minimum wag is with estimative effect of increase of minimum wage. Through comparison of stores of low wage and high wage above $5, employment volatility in New Jersey was studied. In U.S.A., increase of minimum wage was not caused to reduce to employment. Contrary to this, result of Korea was not consisted after timing of IMF bailout of 1997. It is because drop of revenue was caused to decrease employees of part-time and full-time job at the viewpoint of cost minimization.

  • PDF

The Performance Comparison of the ISCA and MSCA Algorithm for Adaptive Equalization (적응 등화를 위한 ISCA와 MSCA 알고리즘의 성능 비교)

  • Lim, Seung-Gag;Kang, Dae-Soo
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.12 no.4
    • /
    • pp.7-13
    • /
    • 2012
  • The performance of blind equalization algorithm ISCA was compared with MSCA that is used for the minimization of the inter symbol interference which occurs in the time dispersive communication channel for digital transmission. Because of the non-linearities of a magnitude and phase transfer characteristics of a communication channel, the transmitting signal will be received that band limited and time dispersived. Therefore the distortion was compensated by using the self adaptive equalizer at the receiving side, then passing through the detector for the decision of "1" or "0". At this time the Constellation Dependent Constant is played an important role in the adaptive equalizer used on the receiver. In order to calculation of this constant, the ISCA and MSCA was used the second order statistics. The ISCA and MSCA which are possible to compensation of mensioned transfer function simulataneously, are improved the performance of original SCA algorithm and then was compared the performance by computer simulation. For this, the recovered constellation, residual isi and MSE was used, and a result of performance comparison, the ISCA algorithm has better than the MSCA in every performance index. But on the steady state of equalizer, the variation of performance due to the CME terms in the MSCA equalization algorithm was less than the ISCA, so MSCA has better stability.

A Clinical Evaluation of the Tumor Volume Doubling Time in Primary Bronchogenic Carcinoma (폐암환자에서 본 Tumor Doubling Time 의 임상적 의의)

  • 홍기우;이홍균
    • Journal of Chest Surgery
    • /
    • v.6 no.1
    • /
    • pp.15-22
    • /
    • 1973
  • The definition of cancer, its diagnosis and its prognosis all depend upon description of growth. To the layman a synonym for cancer is a "growth". There are no quantitative terms for the description of growth or growth rate in clinical use. There has been no attempt to assign values that would define "rapidly" or "slowly" growing. Estimates of growth potentiality are implied in the descriptive phrases "poorly differentiated" or "well differentiated", "highly malignant" or "low grade malignancy". and in systems of grading. These qualifying terms represent a personal impression, clinically useful in prognosis, but relative in nature. They do not lend themselves to uniform application or precise measurement for purpose of comparison. Growth is related to size and time. The volume of tumor depends upon the duration of the period of growth and the rate of growth. If the interval and change in volume are known. the average growth rate can be determined. If the growth rate is determined, and assumed to be constant., the duration of a given tumor and the time of inception can be estimated. The commonest concept of the origin of cancer is that as a result of a mutation involving a single cell, succeeding divisions of cells establish a colony with the characteristics recognizable as cancer. If the growth rate of the hypothetical tumor were constant it could be described in terms of "tumor volume doubling time". In the department of thoracic surgery of St. Mary hospital in Catholic Medical College, a clinical evaluation for the growth rate, degree of malignancy, resectability and prognosis was done on a total 24 cases of primary bronchogenic carcinoma which contour was significant on the chest X-ray film as possible estimating the tumor volume doubling time. The following results were obtained: 1. In the cases of 6.0cm or more in diameter of minor size at operation the resectability rate was lower and in the cases of 60 days or more in the tumor or volume doubling time the resectability rate was higher. 2. If differentiation of cancer cells was lower graded in tissue pathology, the tumor volume was shorter and the resectability rate was lower. 3. The tumor volume doubling time of the primary bronchogenic carcinoma occured more over 60 years of age was slightly shorter than under 60 years of age. 4. The tumor size at operation was more important to evaluate the survival time and prognosis than the tumor volume doubling time because the tumor growth was not always constant, we presume.mor volume doubling time because the tumor growth was not always constant, we presume.

  • PDF

A Study on Reduction of Computation Time through Adjustment the Frequency Interval Information in the G.723.1 Vocoder (G.723.1 보코더에서 주파수 간격 정보조절을 통한 계산량 감소에 관한 연구)

  • 민소연;김영규;배명진
    • Proceedings of the IEEK Conference
    • /
    • 2002.06d
    • /
    • pp.405-408
    • /
    • 2002
  • LSP(Line Spectrum Pairs) Parameter is used for speech analysis in vocoders or recognizers since it has advantages of constant spectrum sensitivity. low spectrum distortion and easy linear interpolation. However the method of transforming LPC(Linear Predictive Coding) into LSP is so complex that it takes much time to compute. Among conventional methods, the real root method is considerably simpler than others, but nevertheless, it still suffers from its jndeterministic computation time because the root searching is processed sequentially in frequency region. We suggest a method of reducing the LSP transformation time using voice characteristics The proposed method is to apply search order and interval differently according to the distribution of LSP parameters. in comparison with the conventional real root method, the proposed method results in about 46.5% reduction. And, the total computation time is reduce to about 5% in the G.723.1 vocoder.

  • PDF