• Title/Summary/Keyword: Civil-BIM

Search Result 262, Processing Time 0.024 seconds

BIM Application for Civil Engineering Project in Planning and Design Phases (토목공사 기획 및 설계단계의 BIM 적용방안 연구)

  • Kang, Leen-Seok;Kim, Seol-Gi;Kim, Hyeon-Seung;Moon, Hyoun-Seok
    • Journal of KIBIM
    • /
    • v.1 no.1
    • /
    • pp.26-31
    • /
    • 2011
  • Due to the characteristics of 3D objects of building construction projects which have regular, vertical and repetitive shapes, the most practical utilization of BIM in the country is focused on building projects. The characteristics of 3D objects of civil engineering project have irregular, horizontal and non-repetitive shapes. Therefore, consisting of a practical BIM model is difficult comparing with building project. This study suggests an application process of BIM for the planning and design phases for civil engineering project. A BIM system is developed based on suggested BIM process and it is verified through a bridge construction project.

A Deep Learning Model to Predict BIM Execution Difficulty Based on Bidding Texts in Construction Projects (건설사업 입찰 텍스트의 BIM 수행 난이도 추론을 위한 딥러닝 모델)

  • Kim, Jeongsoo;Moon, Hyounseok;Park, Sangmi
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.6
    • /
    • pp.851-863
    • /
    • 2023
  • The mandatory use of BIM(Building Information Model) in larger Korean public construction projects necessitates participants to have a comprehensive understanding of the relevant procedures and technologies, especially during the bidding stage. However, most small and medium-sized construction and engineering companies possess limited BIM proficiency and understanding. This hampers their ability to recognize bidding requirements and make informed decisions. To address this challenge, our study introduces a method to gauge the complexity of BIM requirements in bidding documents. This is achieved by integrating a morphological analyzer, which encompasses BIM bidding terminology, with a deep learning model. We investigated the effects of the parameters in our proposed deep learning model and examined its predictive validity. The results revealed an F1-score of 0.83 for the test data, indicating that the model's predictions align closely with the actual BIM performance challenges.

Standardization of Infrastructure Information Modeling based on BIM Information Framework (BIM 정보프레임워크 기반의 토목구조물 정보모델링 표준화방안)

  • Nam, Jeong-Yong;Jo, Chan Won
    • Korean Journal of Computational Design and Engineering
    • /
    • v.19 no.3
    • /
    • pp.281-293
    • /
    • 2014
  • Although there have been a lot of BIM R&Ds in the civil engineering and their applications to the real projects, BIM in the field is still known to be behind the other areas. One of the reasons for this should be that the civil projects is generally too public for private participants to try new technologies, but it is mainly because the projects are so huge and complex that we still have the working environment where the systematic information sharing or exchanging is not smooth enough. In this paper, we are verifying the possibility and proposing the direction of BIM information standardization technology in civil engineering based on the integrated BIM information standard framework. For this purpose, after reviewing the introduction plan for BIM information framework, we applied it to an actual civil structure for test. The implementation result proved that the framework has possibility and effectiveness for the takeoff and construction cost calculation, which confirmed the standard framework needs to be extended consistently. This study is expected to contribute to the standard system establishment and its technology propagation for BIM development in the civil engineering.

Parametric Quantity Take-Off of Earthwork by Comparing the Use of Surface and Solid Models (Surface 및 Solid 방식의 비교를 통한 Parametric 기법의 토공물량산출 방법)

  • Hwang, Hee-Su;Lee, Jae-Hong;Kim, Tae-Young
    • Journal of KIBIM
    • /
    • v.8 no.1
    • /
    • pp.56-62
    • /
    • 2018
  • There exists no precedented case of quantity take-off, using parametric modeling, from BIM-based irregular structures. Civil 3D provides earthwork quantity take-off based on surface modeling. Generally, designers should enter data into the specification additionally after extracting quantity estimation from earthwork modeling design. The objective of this report is to suggest the method from quantity take-off to specification of BIM-based earthwork quantities. We intend to investigate earthwork take-off method by Civil3D and explain why parametric information extraction is required for quantity estimation and specification and how information of earthwork quantity based on solid and surface modeling is connected to open quantity take-off module. It is highly expected that this suggestion would be the practical methodology of earthwork quantity take-off and specification in the field of civil engineering.

3D Earthwork BIM Design Process for a Road Project

  • Raza, Hassnain;Park, Sang-Il;Lee, Seung Soo;Tanoli, Waqas Arshad;Seo, Jongwon
    • Journal of KIBIM
    • /
    • v.7 no.2
    • /
    • pp.8-15
    • /
    • 2017
  • Building Information modeling is playing an important role in transforming the construction industry. It helped the industry with better visualization, minimum design errors, and excellent planning of the construction activities. Time and cost saving can be effectively achieved by using BIM for any construction project. It improves information exchange between all the project stakeholders. However, the development of earthwork 3D BIM is still underway and has not been fully implemented yet. This paper presents the study of a complete process for Earthwork BIM design using Autodesk Civil 3D. A real site road construction project is used as a case study to explain the process of earthwork modeling, starting from laser scanning to 3D model. Quantity take off calculation is very important part of any road construction project so during this study earthwork volume from two 3D earthwork model is calculated. The results obtained through this study will be the basis for future work which has been concluded in this paper.

Empirical Analysis of Man-hour Data to Support a Cost-Plus Pricing Approach for Estimating BIM Service Costs

  • Koo, Bonsang;Lee, Ghang;Kim, Chung-woon;Shin, Byungjin
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.660-661
    • /
    • 2015
  • Building Information Modeling (BIM) is a nascent technology in Korea, and currently lacks formal guidelines to assist Architectural and Engineering (AE) firms in estimating BIM service fees, while also allowing government agencies to allocate budgets for the rendered BIM services. This research provides a method to estimate costs for BIM services based on the cost-plus pricing framework. The approach requires a generalized estimate of the man hour per floor area data to calculate the direct labor costs. Man-hour data were collected from forty five projects that have implemented BIM. Interpolation of the man-hours was performed to develop a general reference table for 'Type 2' (i.e., public schools and office buildings, etc.) projects. By providing an objective approach for estimating the costs of BIM services, it allows clients and AE firms to agree upon a fair cost for BIM related services, and thus expedite its adoption in Korea.

  • PDF

Effectiveness Analysis of BIM-based Architectural Facility Management Scenario (BIM 기반 건축 시설물 유지관리 시나리오 효과 분석)

  • Kang, Tae-Wook;Kim, Ji-Eun;Choi, Hyun-Sang
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.11
    • /
    • pp.10-19
    • /
    • 2016
  • Recently, according to a public order with BIM regulations, various technologies of facility management (FM) have been studied to use BIM data effectively. The technology for BIM-based FM, such as BIM data standard, BIM modeling, BIM server, and BIM-GIS platform, reverse engineering based on 3D image scans is developing constantly. On the other hand, there has been little research on the range of FM based on BIM, the role of actors by management works, the difference, and difference in effects between original FM and BIM-based FM. This study examined the scenario of architectural FM based on BIM and confirmed the effect. For this, after analyzing the research trends, the range of FM applications and the role of actors by management works were defined, and the effectiveness analysis of a BIM-based architectural FM scenario was deduced.

Automation Review of Road Design Standard using Visual Programming (비주얼 프로그래밍 기법을 활용한 도로설계기준 자동검토 방안)

  • Hyoun-seok Moon;Hyeoun-seung Kim
    • Journal of the Society of Disaster Information
    • /
    • v.18 no.4
    • /
    • pp.891-898
    • /
    • 2022
  • Purpose: There is not much time left for mandatory BIM implementation for all sectors and stages of the construction industry. Therefore, it is necessary to find a way to secure technology to substantially improve the productivity of BIM work. In the research, we proposed a method to automatically verify related construction standards for major objects produced by BIM modeling procedures so that engineers can verify construction standards in the BIM-based design process. Method: We defined a modeling work procedure for BIM-based road design work and prepared a method for constructing related design standards in a database. In addition, a process map for developing a BIM-based design basis review automation system was also presented. Result: A BIM-based design standard review automation module was developed using Civil3D and Dynamo. And it was confirmed by the test application that it is possible to quickly judge whether the BIM object manufactured in the design process conforms to the construction design standard. Conclusion: BIM-based design standard review automation technology can improve the productivity of BIM model production work and secure the quality of the BIM model.

A Study on BIM Guidelines for Model-based Infrastructure Management (모델기반 사회기반시설 유지관리를 위한 BIM 가이드라인 고찰)

  • Kim, Bong-Geun;Kim, Ji-Won;Ji, Seung-Gu;Seo, Jong-Won
    • Journal of KIBIM
    • /
    • v.2 no.2
    • /
    • pp.10-16
    • /
    • 2012
  • This study aims to investigate basic requirements for adopting the Building Information Modeling(BIM) technology to management of civil infrastructures. The state of the art on BIM guidelines developed major countries was investigated, and a common framework of the guideline contents was built in order to categorize the requirements. In addition, it was investigated that the point of view on the facility management in the BIM guidelines showed different from the traditional civil infrastructure domain. On the basis of the investigation results, this paper proposed the core requirements categorized into three respects: development of application models, standardization, modification of regulations.

A Development of Unified and Consistent BIM Database for Integrated Use of BIM-based Quantities, Process, and Construction Costs in Civil Engineering

  • Lee, Jae-Hong;Lee, Sung-Woo;Kim, Tae-Young
    • Journal of the Korea Society of Computer and Information
    • /
    • v.24 no.2
    • /
    • pp.127-137
    • /
    • 2019
  • In this study, we have developed a calculation system for BIM-based quantities, 4D process, and 5D construction costs, by integrating object shape attributes and the standard classification system which consist of Cost Breakdown System(CBS), Object Breakdown System(OBS) and Work Breakdown System(WBS) in order to use for the 4 dimensional process control of roads and rivers. First, a new BIM library database connected with the BIM library shape objects was built according to the CBS/OBS/WBS standard classification system of the civil engineering field, and a integrated database system of BIM-based quantities, process(4D), and construction costs(5D) for roads and rivers was constructed. Nextly, the process classification system and the cost classification system were automatically disassembled to the BIM objects consisting of the Revit-family style elements. Finally, we added functions for automatically generating four dimensional activities and generating a automatic cost statement according to the combination of WBS and CBS classification system The ultimate goal of this study was to extend the integrated quantities, process(4D), and construction costs(5D) system for new roads and rivers, enabling the integrated use of process(4D) and construction costs(5D) in the design and construction stage, based on the tasks described above.