1 |
Collao, J., Lozano-Galant, F., Lozano-Galant, J.A., Turmo, J. (2021). "BIM visual programming tools applications in infrastructure projects: A state-of-the-art review." Applied Sciences, Vol. 11, No. 18, pp. 1 -24.
|
2 |
Dimyadi, J., Amor, R. (2013). "Automated building code compliance checking - Where is it at." Proceedings of CIB WBC, Hong Kong, pp. 172-185.
|
3 |
Kang, J.-Y., Hasan, S.-M., Min, J.-S., An, J.-S., Choi, J.-W. (2022). "Rule-based review and automated quality management processof BIM deliverables for railway infrastructures." Korean Institute of Building Information Modeling, Vol. 12, No. 1, pp. 23-34.
|
4 |
Ki, J.-S., Hong, M.-G. (2021). "A study of safety accident prediction model (Focusing on military traffic accident cases)." Journal of the Society of Disaster Information, Vol. 17, No. 3, pp. 427-441.
DOI
|
5 |
Kim, H.-S., Lee, H.-M., Lee, I.-S. (2020). "Development of automatic BIM modeling system for slit caisson." Journal of the Korea Academia-Industrial Cooperation Society, Vol. 21, No. 11, pp. 510-518.
|
6 |
Kim, I.-H., Jang, J.-M., Choi, J.-S. (2018). "A study on the additional properties management method for building code automated checking by BIM." Korean Journal of Computational Design and Engineering, Vol. 23, No. 2, pp. 92-104.
DOI
|
7 |
MOLIT (2022). Construction Industry BIM Implementation Guidelines. Sejong.
|
8 |
MOLIT (2022). Smart Construction Activation Plan: S-Construction 2030. Sejong.
|
9 |
Nam, J.-Y., Joo, J.-H., Kim, T.-Y. (2021). "A study on the automatic bim modeling method based on standard drawings for the maintenance of existing river facilities - Focusing on the drainage culverts -." Korean Journal of Computational Design and Engineering, Vol. 26, No. 1, pp. 12-21.
DOI
|