• Title/Summary/Keyword: Civil 3D

Search Result 2,749, Processing Time 0.035 seconds

A Study on the Estimation Measure of Delay Cost on Work Zone Using the Traffic Flow Model (교통류 모형을 이용한 도로 점용공사 구간의 지체비용 산정방안)

  • Kim, Yunsik;Lee, Minjae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.5
    • /
    • pp.120-129
    • /
    • 2016
  • The user cost is an important analysis item which should be considered together with life-cycle of facility, administrator cost and discount rate in LCCA for efficient asset management of SOC facilities. Especially, a significant delay cost occurs often for users in the road field due to a work zone for cleaning and maintenance, and in such case, the administrator should consider the administrator cost as well as the user cost for more rational decision making. However, the user cost has not been considered in most decision making steps until recently and relevant studies also have not been carried out actively. In this study, the methodology to estimate the user cost and delay cost required in the decision making step using the traffic flow model and the direct benefit estimation model in the traffic facility investment evaluation guideline is suggested. And, the traffic flow model was estimated on 4 national highway sections where maintenance was actually carried out in 2014 using VISSIM and, the user cost and the delay cost were estimated based on the suggested methodology. The analysis result showed that the average user cost of $17,569,000KRW/km{\times}day$ occurred on Section A with approximately 30,000 AADT before a work zone occurred, and in case the first lane was blocked for maintenance, the delay cost of $10,193,000KRW/km{\times}day$ (158%) on average occurred additionally. The delay cost of $1,507,000KRW/km{\times}day$ (115%) and $1,985,000KRW/km{\times}day$ (119%) occurred on Sections B and D with approximately 20,000 AADT respectively and the delay cost of $262,000KRW/km{\times}day$ (105%) occurred on Section C with approximately 10,000 AADT. This result of this study was estimated based on the simulation of traffic flow model so that there is a limitation in its actual application. A study ot develop a highly appropriate model using actual observation data and improve the possibility to apply it through the verification using the simulation will be necessary in future.

A Experimental Study on Exclusion Ability of Riprap into Bypass Pipe (저층수 배사관 내 유입된 사석 배출능력에 대한 연구)

  • Jeong, Seok Il;Lee, Seung Oh
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.37 no.1
    • /
    • pp.239-246
    • /
    • 2017
  • There are various transversal structures (small dams or drop structures) in median and small streams in Korea. Most of them are concrete structures and it is so hard to exclude low-level water. Unless drainage valves and/or gates would not be installed near bottom of bed, sediment from upstream should be deposited and also contaminants attached to the sediments would devastatingly threaten the water quality and ecosystem. One of countermeasures for such problem is the bypass pipe installed underneath the transversal structure. However, there is still issued whether it would be workable if the gravels and/or stones would roll into and be not excluded. Therefore, in this study, the conditions to exclude the rip stone which enter into the bypass pipe was reviewed. Based on sediment transport phenomenon, the behavior of stones was investigated with the concepts from the critical shear stress of sediment and d'Alembert principle. As final results, the basis condition (${\tau}_c{^*}$) was derived using the Lagrangian description since the stones are in the moving state, not in the stationary state. From hydraulic experiments the relative velocity could be obtained. In order to minimize the scale effect, the extra wide channel of 5.0 m wide and 1.0 m high was constructed and the experimental stones were fully spherical ones. Experimental results showed that the ratio of flow velocity to spherical particle velocity was measured between 0.5 and 0.7, and this result was substituted into the suggested equation to identify the critical condition wether the stones were excluded. Regimes about the exclusion of stone in bypass pipe were divided into three types according to particle Reynolds number ($Re_p$) and dimensionless critical shear force (${\tau}_c{^*}$) - exclusion section, probabilistic exclusion section, no exclusion section. Results from this study would be useful and essential information for bypass pipe design in transveral structures.

Development and Application of Mode II Fracture Toughness Test Method Using Rock Core Specimen (시추코어를 이용한 암석의 mode II 파괴인성 시험법 개발과 적용)

  • Jung, Yong-Bok;Park, Eui-Seob;Kim, Hyunwoo
    • Tunnel and Underground Space
    • /
    • v.26 no.5
    • /
    • pp.396-408
    • /
    • 2016
  • Rock fracture mechanics has been widely applied to various fields of rock and civil engineering. But most researches covered mode I behavior, though mode II behavior is dominant in rock engineering. Until now, there is only one ISRM suggested method for mode II toughness of rock. A new SCC (Short Core in Compression) mode II toughness test method was developed considering 1) application of confining pressure, 2) easiness of notch creation, 3) utilization of existing equipment, 4) simple test procedure. The stress intensity factors were determined by 3D finite element method considering line and distributed loading conditions. The tests with granite specimens were carried out using MTS 815 rock test system with a loading rate of 0.002 mm/s. The mean value of mode II fracture toughness of granite showed $2.33MPa{\sqrt{m}}$. Mode I toughness of the same granite was $1.12MPa{\sqrt{m}}$, determined by Brazilian disk test and $K_{IIC}/K_{IC}=2.08$. The smooth fracture surface with rock powder formation also supported mode II behavior of SCC method. The SCC method can be used for the determination of mode II fracture toughness of rocks based on the current results.

Experimental Implementation of Continuous GPS Data Processing Procedure on Near Real-Time Mode for High-Precision of Medium-Range Kinematic Positioning Applications (고정밀 중기선 동적측위 분야 응용을 위한 GPS 관측데이터 준실시간 연속 처리절차의 실험적 구현)

  • Lee, Hungkyu
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.3
    • /
    • pp.31-40
    • /
    • 2017
  • This paper deals with the high precision of GPS measurement reduction and its implementation on near real-time and kinematic mode for those applications requiring centimeter-level precision of the estimated coordinates, even if target stations are a few hundred kilometers away from their references. We designed the system architecture, data streaming and processing scheme. Intensive investigation was performed to determine the characteristics of the GPS medium-range functional model, IGS infrastructure and some exemplary systems. The designed system consisted of streaming and processing units; the former automatically collects GPS data through Ntrip and IGS ultra-rapid products by FTP connection, whereas the latter handles the reduction of GPS observables on static and kinematic mode to a time series of the target stations' 3D coordinates. The data streaming unit was realized by a DOS batch file, perl script and BKG's BNC program, whereas the processing unit was implemented by definition of a process control file of BPE. To assess the functionality and precision of the positional solutions, an experiment was carried out against a network comprising seven GPS stations with baselines ranging from a few hundred up to a thousand kilometers. The results confirmed that the function of the whole system properly operated as designed, with a precision better than ${\pm}1cm$ in each of the positional component with 95% confidence level.

Analysis of drought propagation using hydrometeorological data: from meteorological drought to agricultural drought (수문기상 정보를 이용한 가뭄 전이 분석: 기상학적 가뭄에서 농업적 가뭄)

  • Yu, Myungsu;Cho, Younghyun;Kim, Tae-Woong;Chae, Hyo-Sok
    • Journal of Korea Water Resources Association
    • /
    • v.51 no.3
    • /
    • pp.195-205
    • /
    • 2018
  • Drought is a complex phenomenon caused by various factors which can be classified into natural and anthropogenic causes. In Korea, the natural drought typically occurs when the high pressure of the Pacific Ocean develops rapidly or becomes stronger than usual in summer, resulting in a short-lived monsoon season. Drought also can be classified into meteorological, agricultural, hydrological, and socioeconomic drought depending on the development process and consequences. Each type of droughts can influence the other drought types directly or indirectly. Drought propagation refers a phenomenon that changes from meteorological drought to agricultural or hydrological drought. In this study, the occurrence and patterns of drought propagation are evaluated. The relationship between meteorological and agricultural droughts was assessed using hydrometeorological data. We classified the types of drought into five categories to evaluate the occurrence and characteristics of drought propagation. As results, we found drought propagation did not occur or delayed until three months, depending on the type of drought. The further generalized relationship of drought propagation is expected to be used for predicting agricultural drought from the preceding meteorological drought.

Hydraulic Stability and Wave Transmit Property of Stacked Geotextile Tube by Hydraulic Model Test (수리모형시험을 통한 다단식 지오텍스타일 튜브의 안정성 및 파랑 전달특성에 관한 연구)

  • Oh Young In;Shin Eun Chul
    • Journal of the Korean Geotechnical Society
    • /
    • v.21 no.2
    • /
    • pp.57-65
    • /
    • 2005
  • Geotextile have been used for the past 30 years for various types of containers, such as small sandbag, 3-D fabric forms and aggregate filled gabion etc. While they are mainly used for flood and water control, they are also used against beach erosion fir shore protection. Especially, large-sized geotextile tube structures are used in various innovative coastal systems involving breakwaters. This paper presents the hydrodynamic behavior of geotextile tubes based on the results of hydraulic model tests. These tube are generally about 1.0 m to 2.0 m in diameter, thou띤 they can be sized for any application. The tubes can be used solely, or stacked to add greater height and usability. Stacked geotextile tubes will be created by adding the height necessary for some breakwaters and embankment, therefore increasing the usability of geotextile tubes. The hydraulic model test was conducted as structural condition and wave conditions. Structural condition is installation direction to the wave (perpendicular and 45$^{circ}$$), and wave condition is varied with the significant wave height ranging from 3.0 m to 6.0 m. Compared with previous test result, the stacked geotextile tube is more stable against wave attack than single tube. Also, the case of none-water depth above crest is more stable than 0.5H of water depth above crest. The incline installed stacked tube is more effective for wave adsorption.

Numerical Analysis of Debris Flow Using Drone Images and NFLOW (드론 영상 및 NFLOW를 활용한 토석류 수치해석 연구)

  • Lee, Seungjoo;Lim, Hyuntaek;Lim, Moojae;Lee, Eungbeom;Lee, Kang-Il;Kim, Yongseong
    • Journal of the Korean Geosynthetics Society
    • /
    • v.19 no.3
    • /
    • pp.1-8
    • /
    • 2020
  • In this study, numerical analysis of debris flow was performed using the SPH (Smoothed Particle Hydrodynamics) technique to analyze the mechanism of debris flow, and the applicability of soil parameters was verified by comparison with previous studies. In addition, after performing aerial photographic survey using a drone, a topographic model was created based on this survey to check the applicability of the site to the valley part of Jagul Mountain basin. And after numerical analysis of debris flow was performed using NFLOW, and the result was compared and analyzed with the existing satellite image based method. As a result of this study, the numerical analysis method using drone image and NFLOW was found to have a higher applicability to predicting the impact of debris flow, because it can reflect the actual topography better than the existing method based on satellite imagery. Therefore, it is considered that this study can be used as basic data to establish the preventive measures for debris flow such as location selection of the eruption control dam.

Experimental Applicability Evaluation for Renewal and Modification Task of Digital Topographic Map by Low-Cost Drone Acquired Images (저가형 드론영상을 이용한 수치지형도 수정·갱신업무 적용 가능성 실험 평가)

  • YUN, Bu-Yeol
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.20 no.4
    • /
    • pp.115-125
    • /
    • 2017
  • In current, as the release of national base map with an equivalent scale and accuracy for the whole territory areas in South Korea, rapid spatial information industry such as national land development, GIS, and car navigation are used in a variety of spatial information industry as decision making method, and a lot of research and policies are proposed for the wide expansion of spatial information industry. For this, as of 2013, it contributes to the latest trend of spatial information field in order to solve the problems for the latest trend of spatial information, replacing modification of base maps as dividing the whole territory to zone with policy transformation by ordinary modifications. Therefore, this paper evaluates the possibility of modification and renewal of national base maps(scale: 1:5,000) using drones which currently get the limelight from a variety of research fields and industries. In particular, as a result of overlapping orthophoto, 3D point clouds extracted from images acquired by low-cost drones, and digital maps which are applied for the tasks of modification and renewal, it presents 0.2m precision and 0.1m accuracy. This means that drone-based photorgammetry technique can be fully utilized in the tasks of digital map modification and renewal because it conforms the error range of work regulation in making the national base maps(scale 1: 5000).

Proposal of Early-Warning Criteria for Highway Debris Flow Using Rainfall Frequency (2): Criteria Adjustment and Verification (확률 강우량을 이용한 고속도로 토석류 조기경보기준 제안 (2) : 기준의 조정 및 적용성 검토)

  • Choi, Jaesoon
    • Journal of Korean Society of Disaster and Security
    • /
    • v.12 no.2
    • /
    • pp.15-24
    • /
    • 2019
  • In the previous study, the rainfall data of 1 hour, 6 hours and 3 days were used as the rainfall criterion according to the grade to trigger the debris flow in the highway area, using the rainfall data of Gangwon area and the rainfall time-series data at the spot where the debris flow occurred. In this study, we propose an early warning criterion of the highway debris flow triggering through appropriate combination of three rainfall criteria selected through previous studies and adjustments of rainfall criterion in the highway debris flow triggering. In addition, simulations were conducted using the time-series rainfall data of 2010~2012, which had a large amount of precipitation for the five sites where debris flows occurred in 2013. As a result of the study, the criteria for the early warning of highway unsteadiness on the highway were prepared. In case of the grade-based adjustment, it is preferable to apply the unified rating to the grade B. Also, if the fatigue of the monitoring is not a problem, adjusting it to A or S may be a way to positively cope with the occurrence of highway debris flow.

A Numerical study on characteristics of fluid flow in a three-dimensional discrete fracture network with variation of length distributions of fracture elements (3차원 이산 균열망 흐름장에서 균열요소의 길이분포 변화에 따른 내 유체 흐름 특성에 관한 수치적 연구)

  • Jeong, Woochang
    • Journal of Korea Water Resources Association
    • /
    • v.52 no.2
    • /
    • pp.149-161
    • /
    • 2019
  • In this study, the effect of the fluid flow characteristics on the length distribution of the fracture elements composing the fracture network is analyzed numerically using the 3D fracture crack network model. The truncated power-law distribution is applied to generate the length distribution of the fracture elements and the simulations of fluid flow are carried out with the exponent ${\beta}_l$ from 1.0 to 6.0. As a result of simulations, when the exponent ${\beta}_l$ increases, the length distribution of the fracture elements gradually decreases, and the connectivity between the fracture elements affecting the permeability of the fracture network becomes weak. When we analyzed the distributions of flow rate calculated at each fracture element with the exponent ${\beta}_l$, the mean flow rate at ${\beta}_l=1.0$ was estimated to be about 447 times larger than that at ${\beta}_l=6.0$ and for the flow calculated at the outflow boundary of the fracture network, the case of ${\beta}_l=1.0$ was estimated to be 6,440 times larger than that of ${\beta}_l=6.0$.