소형 열병합 발전기 계통연계 운전시의 적용 보호지침 개선 제안 (A case Study for Protection Relay System of small Cogeneration intertie)

  • 윤갑구;김경식;현대원
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2004년도 춘계학술대회 논문집 전기설비전문위원
    • /
    • pp.227-230
    • /
    • 2004
  • The Co-Gen System which maximize energy efficiency was installed at the industrial plants at the initial stage. However Small Scale Co-Gen System was expanded even to the general end-users such as housing and building owing to ESCO business recently. For this SSC, inter-connected operation to the utility is desirable due to voltage and frequency fluctuation following to unbalance between power output and load. Then voltage unbalance with utility system, frequency, increase of short circuit capacity, reclosing, and ALTS etc. should be fully considered for the inter-connected operation. Voltage variation, protection coordination, Co-Generators single running, and short circuit capacity should also be solved. For Con-Gen users, the several protection relays are recommended to install at the user's main incoming panel by the guide lines and/or instructions of the interconnected utility Then user's main CB(Circuit Breaker) have the chance to be tripped by some of this recommended relays and users have to undergo the unexpected blackout. So the circuit breaker trip schemes targeted to trip with these protection relays are reconsidered and the study result is hereunder proposed.

  • PDF

Prediction of Insulation Capability for Ground Fault to Consider Asymmetry in SF6 Circuit Breaker

  • Oh, Yeon-Ho;Song, Ki-Dong;Kim, Hong-Kyu;Lee, Hae June;Hahn, Sung-Chin
    • Journal of Electrical Engineering and Technology
    • /
    • 제10권5호
    • /
    • pp.2046-2051
    • /
    • 2015
  • Currently, most high-voltage gas circuit breakers (CBs) include asymmetrical geometries in the shield, the tank, the hot-gas exhaust, and the connection parts for bushings. For this reason, a 3-dimensional (3-D) analysis of the insulation capability is necessary, rather than a 2-D analysis. However, a 3-D analysis has difficulties due to the computational time and complex modeling. This paper presents a 3-D analysis considering the asymmetry in high-voltage gas CBs and a technique to reduce the calculation time. In the proposed technique, the arc plasma requiring the most computational time is first calculated by a 2-D analysis. Then, the results such as pressure, temperature, and velocity are input as a source for the 3-D analysis. This technique is applied to a 145kV self-blast-type CB and the analysis result exhibits good agreement with the experimental result.

고속 스위칭에 의한 송전선로 과부하 해소 연구 (A Study on the Transmission Overload Relief by Fast Switching)

  • 조윤성;이한상;장길수
    • 전기학회논문지
    • /
    • 제62권8호
    • /
    • pp.1053-1058
    • /
    • 2013
  • Because of computational burden and complex topology of substation, a transmission overload relief using circuit-breaker switching was very complex and difficult. However, a on-line algorithm for reducing the overloads in transmission lines has made progress due to the advance of IT technology. This paper describes the methodology for alleviating the overloads in transmission lines by circuit-breaker switching. First, the severe contingency lists and substations were selected from the results of contingency analysis. Then the switch combinations are determined using circuit-breakers of the selected substation. The topology changes are limited to equipment outage, bus split, island split, bus merge and island merge. Finally, the fast screening and full analysis methods are used to analyze the overload in transmission lines. To verify the performance of the proposed methodology, we performed a comprehensive test for both test system and large-scale power systems. The results of these tests showed that the proposed methodology can accurately alleviate the overloads in transmission lines from online data and can be applied to on-line applications.

EMTDC를 활용한 자가용 수용가 차단기 투입전류 확률해석 (Statistical analysis of CB making current in large seals industrial load using EMTDC)

  • 윤재영;최흥관
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2002년도 하계학술대회 논문집 A
    • /
    • pp.67-69
    • /
    • 2002
  • This paper presents the statistical analysis of the circuit breaker's making current in large sacle industrical loads using EMTDC. Typically, the making current includes DC components as the phase angel of making instances varies and represents as a instantaneous valus not rms. Consequently, in this paper, the statistical analysis results of making current and steady state fault current for typical industrial loads presents.

  • PDF

고장전류를 고려한 수도권 BTB HVDC 위치선정 연구 (A study on BTB HVDC location in metropolitan area considering fault current analysis)

  • 윤민한;장길수;박정수;장병훈
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2011년도 제42회 하계학술대회
    • /
    • pp.274-275
    • /
    • 2011
  • Fault current problems is considered a serious issue in the power system because large fault currents not only cause many side effects to the equipments of power system but also lead to severe problems, such as blackouts. This paper deals with the structural analysis and 3-phase fault current stability of the future Seoul metropolitan power system. The simulation composition and analysis are performed with the 4th KEPCO power supply planning data using PSS/e. Through the results of the simulations, it can be observed that the future Seoul metropolitan system results in a fault current which exceeds the circuit breaker (CB) rate. This unremovable fault current can cause critical damage to power system. To resolve the problem, the algorithm for the application of Voltage Sourced Converter Back-to-Back High Voltage Direct Current (VSC BTB HVDC) is being proposed. where the most suitable location for solving fault current problem in Seoul metropolitan area is being implemented.

  • PDF

배전계통에서의 디지털 과전류 계전기 자동 정정 시스템 개발 (Development of the Automative Correction System for the Digital Over-current Relay With Distribution System)

  • 백영식;이호준
    • 전기학회논문지
    • /
    • 제56권4호
    • /
    • pp.677-682
    • /
    • 2007
  • In the distribution system, Change of system happens frequently. However, most of the relays are operated manually by a person or not changed when system changed. So, when fault happened, a case that relaydoes not act rapidly happens. Also, in current power system, digital relays are used because of digitization of relay. Digital relay has very many advantages than existing analog relay. One of these advantages is that communication is available and easily can make characteristic curve. If specific values are sent to a relay by communication, A relay can make suitable characteristic curve according to the value. In this paper, by using voltages and currents measured by relay, state of CB(Circuit Breaker) and these relays, SCADA(Supervisory Control And Data Acquisition) system that control and correct characteristic curve of overcurrent relay at system change by using HMI(Human Machine Interface) is proposed.

도시철도 차단기 동작특성 검출장치 구성에 관한 고찰 (The study of Detection System Constuction For Urban Transit Circuit Breaker Motion Characteristic)

  • 임형길;유기선;이기승
    • 한국전기전자재료학회:학술대회논문집
    • /
    • 한국전기전자재료학회 2010년도 하계학술대회 논문집
    • /
    • pp.95-95
    • /
    • 2010
  • Because of the environmental matters the importance of the city railroad is as time goes by increasing. The case of obstacle of the power equipment which supplies electric power to city railroad will occur social and economical enormous loss. Thus, I studied on the preventing method in advance which makes it possible for us to maintain facilities efficiently. The main check points of the power facilities are voltage, current, humidity, partial discharge, move current. These points are gathered by sensor and transmitting to data acquisition device. These data are used to check equipment status in real time. In this paper I described in brief test process and results of the detection system.

  • PDF

사이리스터(Thyristor)의 서지(Surge) 전류 내력 평가에 관한 연구 (Surge current endurance evaluation of Thyristor)

  • 정종규;서동우;정홍주
    • 전력전자학회:학술대회논문집
    • /
    • 전력전자학회 2020년도 전력전자학술대회
    • /
    • pp.253-254
    • /
    • 2020
  • High Voltage Direct Current (HVDC) 시스템은 고압 직류송전을 위한 시스템이다. 고압 직류 송전을 위해서는 전력변환기가 교류전력을 직류전력으로 변환해주어야 하는데, 최근에는 모듈형 멀티레벨 컨버터(Modular Multilevel Converter, MMC)가 많이 적용되고 있다. MMC는 다수의 서브모듈이 직렬로 구성되어 있으며 DC-link단에 대용량 커패시터가 없다. MMC의 심각한 사고 중에 하나는 DC측 전력케이블의 단락사고로 시스템에 따라서 수십 kA 정도의 사고전류가 AC측 CB(Circuit Breaker)가 열리기 전까지 수십 ms에서 수백 ms동안 흐른다. 만약 하프브릿지 회로의 서브모듈로 구성된 컨버터에 별도 보호장치가 없으면 단락전류는 서브모듈의 하단 다이오드를 통해서 흐르게 되어 소손되게 된다. 이를 방지하기 위해 단락전류를 바이패스(by-pass) 시키기 위한 별도의 사이리스터를 추가하는데 이 기기의 사양은 DC 단락 전류를 충분히 견딜 수 있어야 한다. 본 논문에서는 사이리스터의 서지 전류 내력을 평가하기 위해 사양을 분석하고 시뮬레이션과 실험을 통해서 검증하였다.

  • PDF

SC 전용 보호계전기 개발 (Research for Protection Relay of Static Condenser Bank)

  • 정재기;윤시영;김석중;김근규
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2006년도 춘계학술대회 논문집 전기설비전문위원
    • /
    • pp.48-50
    • /
    • 2006
  • SC(Static Condenser) in KEPCO is used in voltage control and power factor compensation. Currently KEPCO uses SC to 154kv 50MVA and 23kv SMVA. It is not important in old days because a SC bank accident has no effect on power system. But we are interested in the SC bank for power quality in these days. The SC Bank has a reactor and a condenser using series connection. It is operated in critical point for resonance circuit normally. Therefore the SC bank has a small reliability against other Power instruments. If a 4th harmonic frequency as a resonance frequency is supplied in system, the condenser is damaged because of a resonance current. And a trip and a closing for CB(Circuit Breaker) in many times will have a big influence of SC bank destruction. General OCR(Over Current Relay) observing SC bank is not useful for this protection We think that protection relay must be have the SC bank characteristics. A solution for this problem is active Power, resonance frequency and impedance.

  • PDF

송전급 초전도한류기의 적용에 따른 선로보호용 비율전류차동계전기의 동작특성 및 보호협조 분석 (Analysis on the Operation Characteristics and Protection Coordination between the Current Ratio Differential Relay for Line Protection and the Trigger-type SFCL in the Power Transmission System)

  • 조용선;김진석;임성훈;김재철
    • 전기학회논문지
    • /
    • 제62권7호
    • /
    • pp.925-930
    • /
    • 2013
  • The fault current of the power transmission system is greater than that of the power distribution system. Therefore, the introduction of superconducting fault current limiter (SFCL) is more needed to reduce the increased fault current. The trigger-type SFCL consists of the high-temperature superconducting element (HTSC), the current limiting reactor (CLR) and the circuit breaker (CB). The trigger-type SFCL can be used to supplement the disadvantages of the resistive-type SFCL. The operation characteristics of the current ratio differential relay which is usually applied to the protection device of the power transmission system are expected to be affected under fault conditions and the applicability of the trigger-type SFCL. In this paper, we analyzed the operating characteristics, by the fault conditions, between the current ratio differential relay for line protection and the trigger-type SFCL in the power transmission system through the PSCAD/EMTDC simulation.