Browse > Article
http://dx.doi.org/10.5370/KIEE.2013.62.8.1053

A Study on the Transmission Overload Relief by Fast Switching  

Cho, Yoon-Sung (Department of Electric and Energy Engineering, Catholic University of Daegu)
Lee, Han-Sang (The School of Railway & Electrical Engineering, Kyungil University)
Jang, Gilsoo (School of Electrical Engineering, Korea University)
Publication Information
The Transactions of The Korean Institute of Electrical Engineers / v.62, no.8, 2013 , pp. 1053-1058 More about this Journal
Abstract
Because of computational burden and complex topology of substation, a transmission overload relief using circuit-breaker switching was very complex and difficult. However, a on-line algorithm for reducing the overloads in transmission lines has made progress due to the advance of IT technology. This paper describes the methodology for alleviating the overloads in transmission lines by circuit-breaker switching. First, the severe contingency lists and substations were selected from the results of contingency analysis. Then the switch combinations are determined using circuit-breakers of the selected substation. The topology changes are limited to equipment outage, bus split, island split, bus merge and island merge. Finally, the fast screening and full analysis methods are used to analyze the overload in transmission lines. To verify the performance of the proposed methodology, we performed a comprehensive test for both test system and large-scale power systems. The results of these tests showed that the proposed methodology can accurately alleviate the overloads in transmission lines from online data and can be applied to on-line applications.
Keywords
Transmission overload relief; CB switching; Topology processing; Power flow analysis;
Citations & Related Records
Times Cited By KSCI : 2  (Citation Analysis)
연도 인용수 순위
1 Y-S. Cho, Y-S. Yun, "Development of the contingency analysis program of Korean energy management system", The Transaction of KIEE, vol. 59, no. 2, pp. 232-241. Feb. 2010.   과학기술학회마을
2 J. N. Wrubel, P. S. Rapcienski, K. L. Lee, B. S. Gisin, G. W. Woodzell, "A practical experience with corrective switching algorithm for on-line applications", IEEE Trans. Power Syst., vol. 11, no. 1, pp. 415-421, Feb. 1996.   DOI   ScienceOn
3 W. Shao, V. Vittal, "Corrective switching algorithm for relieving overloads and voltage violations," IEEE Trans. Power Syst., vol. 20, no. 4, pp. 1877-1885, Nov. 2005.   DOI   ScienceOn
4 B-H. Lee, J-M. B, "A study on an algorithm based on sensitivity method for alleviating overloads in power networks", Journal of the Korean Institute of Illuminating and Electrical Installation Engineers, vol. 22, no. 8, pp. 96-103. Aug. 2008   과학기술학회마을   DOI   ScienceOn
5 Y-M. Park, K-H. Lee, "Application of bus seperation in substation for line overload alleviation", The Transaction of KIEE, vol. 44, no. 10, pp. 1252-1257. Nov. 1995.
6 A. A. Mazi, B. F. Wollenberg, M. H. Hesse, "Corrective control of power system flows by line and bus-bar switching", IEEE Trans. Power Syst., vol. PWRS-11, no. 3, pp. 258-264, Aug. 1986.
7 A. Monticelli, State Estimation in Electric Power Systems: A Generalized Approach, Boston: Kluwer, 1999.