• 제목/요약/키워드: Chung-ju Dam

검색결과 27건 처리시간 0.024초

충주댐 상류지역 하수도시설 확충사업에 관한 주민의 지불의사액 추정을 위한 CVM의 적용에 관한 연구 (Application of contingent valuation method for estimating willingness-to-pay in planning the integrated sewerage system in the catchment of Dam Chung-Ju)

  • 정동환;박규홍;진영선;조중무
    • 환경영향평가
    • /
    • 제13권2호
    • /
    • pp.73-86
    • /
    • 2004
  • The objective of this research was to estimate residents' willingness-to-pay using contingent valuation method and to investigate their environmental sensibilities prior to conduct the costbenefit analysis on the watershed management program of integrated sewerage construction and operation in the catchment of Dam Chung-Ju. A set of questionnaire was prepared and asked to 1,200 residents at downstream area as well as upstream area of Dam Chung-Ju. As a result, environmental sensibility of the residents living in the catchment of upstream of Lake Chung-Ju seemed very high. However, the substantial practice in their own life for conserving their environment was inactive, although residents' efforts trying to collect and dispose garbages in separate containers and to minimize the waste discharge load were actually made. The willingness-to-pay on each month for 20 years was estimated as 4,841 wons for the openended question and 3,411 wons for the close-ended question. Factorial analysis was also performed to obtain correlation among the questions asked. Seven groups of the correlated questions were identified and their contribution to the estimated willingness-to-pay was analyzed.

Framework for Estimating Appropriate Construction Duration of CFRD in the Planning Phase

  • Kim, In Kyum;Kim, Kyong Ju;Yun, Won Gun
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.604-605
    • /
    • 2015
  • To secure quality of dam construction needs appropriate construction duration. Tight construction schedule may have negative influence on infrastructure quality, work safety and maintenance cost. It is necessary to reflect proper construction duration in the planning phase. There have been standards for estimating construction duration of building and industrial complex development but dam construction have not. In order to estimate construction duration of CFRD, feasible study reports and design reports were analyzed to acquire available information. After that, considering on construction duration methods such as comparison with similar cases, approximate estimating formula, approximate quantity assumption were adapted to Critical Path items. Hence, this study present framework for construction duration estimating of CFRD in the planning phase. This framework can be applied other types of dam along the same line.

  • PDF

Korean Streamflow Patterns In Relation To EI NiNO/Southern Oscillation

  • Kim, Young-Oh;Lee, Hyun-Suk
    • Water Engineering Research
    • /
    • 제1권2호
    • /
    • pp.107-117
    • /
    • 2000
  • Streamflow patterns at two gauging stations in Korea, An-Dong dam and Chung-Ju dam, are statistically analyzed in relation to EI Nino/Southern Oscillation (ENSO). As a measure of ENSO, the Southern Oscillation Index (SOI) is used on a monthly and seasonal basis. The traditional correlation analysis shows that cross correlations of the SOI with the seasonal streamflow are generally weak. To investigate the relationship between the extreme values of the SOI, which represent the EI Nino and La Nina events, and the corresponding streamflow patterns, the composite analysis is employed in this study. The composite analysis demonstrates that when EI Nino occurs, seasonal streamflows at An-Dong and Chung-Ju dams during the period from September of the EI Nino year to February of the following year appear to be drier than their means.

  • PDF

ENSO 정보를 이용한 저수지 운영울의 산출 (Deriving a Reservoir Operating Rule ENSO Information)

  • 김영오
    • 한국수자원학회논문집
    • /
    • 제33권5호
    • /
    • pp.593-601
    • /
    • 2000
  • Kim and Lee(2000)는 우리 나라 충주댐의 월 유입량을 EI Nino Southern Oscillation (ENSO)과 연관지어 분석한 결과, 엘리뇨가 발생한 해의 가을과 겨울의 유입량은 평년보다 적은 반면, 라니냐가 발생한 해의 가을과 겨울의 유입량은 평년보다 많음을 밝힌바 있다. 본 연구에서는 이런 ENSO와 유입량 사이의 원격상관관계를 저수지 운영에 활용하는 방안을 제시하고자 한다. 즉, ENSO 정보를 추계동적계획법(SDP)의 수문상태변수로 사용하여 충주댐의 월 운영율을 산출하였다. 대안으로, 수문상태변수를 사용하지 않은 SDP로 월 운영율울 또한 산출하였다. 이러한 두 가지 운영율을 모의운영을 통하여 비교함으로써, ENSO 정보를 이용하였을 때의 가치를 검토하였다. 모의운영 결과, ENSO 정보를 이용한 운영울은 발전량과 용수공급의 안정성을 증대시키고 동시에 월류량을 감소시키는 것으로 나타났다.

  • PDF

수공구조물 여유고 산정을 위한 파랑모형의 적용성 검토 (Review on Application of Wave Model for Calculation of Freeboard in Hydraulic Structure)

  • 김경호;이호진
    • 한국해양공학회지
    • /
    • 제21권1호
    • /
    • pp.25-30
    • /
    • 2007
  • Most of dams and reservoirs were made from natural materials, such as soil, sand and gravel. This type of hydraulic structure has the danger of collapse by overflow during a flood. Freeboard is the vertical distance between the crest of the dam and the full supply level in the reservoir. It must be sufficient to prevent overtopping from over flow. Thus, freeboard determination involves engineering judgment, statistical analysis, and consideration of the damage that would result from the overtopping of a hydraulic structure. This study attempts to calculate the wave height in dam, which is needed for the determination of the freeboard of the dam. Chung-ju dam is selected as the study area. Using the empirical formulas, the wave heights in dam were calculated, and the results were compared with those by the SWAN model, which is a typical wave model. The difference between the calculated results from the empirical formulas and those by the SWAN model is considerably large. This is because empirical equations consider only fetch or fetch and wind velocity, while the SWAN model considers depth and topography data as well.

충주댐 수몰지구의 3차원 영상복원 기법에 관한 실험적 연구 (A Experimental Study on the 3-D Image Restoration Technique of Submerged Area by Chung-ju Dam)

  • 연상호
    • 한국측량학회지
    • /
    • 제22권1호
    • /
    • pp.21-27
    • /
    • 2004
  • 다목적 대형 댐의 건설로 수몰된 과거의 삶의 공간을 20년이 지나서 다시 복원한다는 것은 그곳에 살던 실향민에게는 참으로 반가운 소식이다. 본 연구에서는 1980년대 초에 완공된 충주댐으로 인하여 물 속에 잠긴 청풍지구를 수몰이전의 입체 지형 공간적으로 원형복원하기 위한 원격탐사 기법을 적용한 것이다. 비교적 해상도가 좋은 인공위성 사진자료와 원격탐지된 디지털 영상자료를 수집하고, 수몰 직전에 제작된 지형도를 이용하여 위성영상자료의 통합 적용하여 수몰이전의 지형공간정보를 현재시간으로 영상 복원하는 실험을 한 것이다. 이를 위하여 지형도에서 추출한 등고선과 현재의 등고선과의 접목을 통하여 청풍 주변지역을 중심으로 당시의 수치표고모형을 생성하였다. 또한 이를 입체적으로 보여주기 위한 투시조감도를 각 방향에서 생성함으로서 수몰이전의 아름다운 모습을 3차원적으로 영상복원 하였다. 좀 더 가깝게 수몰마을을 보기 위한 근접 비행 시뮬레이션 동영상을 제작하여 과거 기억 속의 고향을 찾아볼 수 있도록 한 것이다. 이러한 실험적인 연구 결과로 새로운 퓨젼 영상의 생성에 의한 3차원 투시조감도의 생성과 근접방문이 가능한 비행시뮬레이션에 의한 과거 수몰된 댐 유역의 지형에 대한 영상복원이 가능하도록 하였다.

Implementation of Chaotic State Machine using Deterministic Chaos Function

  • Park, Kwang-Hyeon;Hwang, Jong-Sun;Chung, Chong-Eun
    • Journal of Electrical Engineering and information Science
    • /
    • 제3권2호
    • /
    • pp.145-150
    • /
    • 1998
  • For practical application of the concept of chaos, we propose a chaotic state machine as a sequential system. Chaotic state machine which is suggested and implemented in this paper has chaotic motions relying on the dynamics only through the deterministic chaos function. Also, we present and verify that the properties of chaotic state machine is equal to the characteristics of chaos.

  • PDF

폐적(肺積) 폐옹(肺癰) 폐저(肺疽) 폐암(肺癌)에 관(關)한 문헌적(文獻的) 고찰(考察) (The bibliographical study on Pyu-Juk (肺積), Pyu-Ong(肺癰), Pyu-Ju(肺疽), Pyu-Am(肺癌))

  • 한재수;오태환;정승기;이형구
    • 대한한방내과학회지
    • /
    • 제12권2호
    • /
    • pp.113-128
    • /
    • 1991
  • This study has been carried out to investigate Pyu-Juk ( 肺積 ), Pyu-Ong ( 肺癰 ), Pyu-Ju ( 肺疽 ), Pyu-Am ( 肺癌 ) by referring to 56 literatures. The results were obtained as follows; 1. The treatllent-method of Pyu-Juk ( 肺積 ) are Ik Ki ( 益氣 ), SuI Yem Wha ( 洩陰火 ), So Juk ( 消積 ), Wha Juk ( 化積 ), Son Juk ( 損積 ), Ma Juk ( 摩積 ) Jo Chil Gi ( 調七氣 ), and herbs are Sik Bun Tang ( 息賁湯 ), Sik Bun Hwan ( 息賁丸 ), O Juk Hwan ( 五積丸 ), Ban ha Tang ( 半夏湯 ), Gil Gyung Tang ( 桔梗湯 ), Dae Chil Gi Tang ( 大七氣湯 ), Chil Gi Hwan ( 七氣湯 ) , Ga Gam Sik BlDl Hwan ( 加減息賁丸 ), Bil Rang San ( 檳郞散 ). 2. The treatment-method of Pyu-Ong ( 肺癰 ) Yang pyu ( 養肺 ), Yang Hyul ( 養血 ), Yang Gi ( 陽氣 ), Chung Geam Youn Pye ( 淸金潤肺 ), Hal Dam Bae Nong ( 豁痰排膿 ), Saeng Gi ( 生肌 ), herbs are Gil Gyung Tang ( 桔梗湯 ), Jung Ryuk Dae Jo Sa Pyu Tang ( ??大棗瀉肺湯 ), Chung Geom Wy Gyung Tang ( 千金 葦莖湯 ) Hwang Gi tang ( 黃嗜湯 ), Hyun Sam Chung Pyu Eum ( 玄蔘淸肺飮 ), Sip Mi Hwan ( 十味丸 ), Gil Gyung Baek San ( 桔梗白散 ), So Hong Eum ( 消膿飮 ), Sam Gi Bo Pyu Tang ( 蔘嗜補肺湯 ), sam Chul Gun Bi Tang ( 蔘朮健脾湯 ), Chung Pyu Gil Gyung Tang ( 淸肺桔梗湯 ), Yu Sung Hwan ( 如聖丸 ). 3. The treatment-method of Pyu-Ju ( 肺疽 ) are Be Bi ( 補脾 ), Bo Pyu ( 補肺 ), herbs are Hwang Gi Gum Jung Tang( 黃嗜補裨湯 ), lnSamBoPyuSan (人蔘補肺散) 4. The treatment-method of Pyu-Am ( 肺癌 ) are Bal Han ( 發汗 ), Chung Yul Hae Dok ( 淸熱解毒 ), Gang Hwa Do Dam ( 降火導痰 ), Hwa Rak Hwa a ( 和絡化瘀 ) Ik Pyu ( 益肺 ), Gun Bi ( 健脾 ), Ja Eum Yun Pyu ( 滋陰潤肺 ), Gi Hu Yang Bo ( 氣虛兩補 ), herbs are Gyul Yua Hae Dok Tang ( 莖熱解毒湯 ), Gang Hwa Jae ( 降火劑 ), Chil Yul Do Dam Tang ( 治熱導痰湯 ), Chong Ho Byul Gap Tang ( 靑蒿鱉甲湯 ), Ga gam Gil Gyung Tang ( 加減桔梗湯 ), Sang Mak San ( 生脈散), Yuk Mi Ji Hwang Tang ( 六味地黃湯 ), Baek Hap Go Geum Tang ( 百合固金湯 ), Dae Be Won Jun ( 大補元煎 ), Ga Mi Jae Che Bo Pyu Tang ( 加味載體補肺湯 ).

  • PDF

한강 팔당하류의 갈수 시 댐 용수공급 가능유하량 분석 (The Analysis of Potential Discharge by Dam in Han River Basin at Dry Season)

  • 김영규;최계운;함명수;김남원
    • 한국수자원학회논문집
    • /
    • 제41권11호
    • /
    • pp.1143-1152
    • /
    • 2008
  • 우리나라는 강우량의 편기 현상으로 6월부터 9월중에 전체 강우량의 2/3가 내리고 있으며 갈수기에는 극히 적은 강우가 발생하고 있다. 또한 이러한 갈수기에는 물 부족으로 인하여 수질이 악화되는 문제까지 발생하고 있다. 본 연구에서는 갈수기에 발생하는 수질 악화현상을 방지하기 위해 저수지로부터 하천 유하량을 증가시켜 희석을 통한 수 질개선효과를 얻을 수 있는 방법에 대하여 한강유역을 대상으로 분석하였다. SWAT-K를 이용하여 한강유역을 총 33개의 소유역으로 구분하였으며, 각 소유역에서 발생되는 자연유출량을 모의하였다. 또한 용수수요량은 과거 용수 사용량 자료를 이용하여 추정하였다. 한강유역에서 유량을 공급하는 대규모 저류지는 남한강과 북한강에서 각각 한 개씩의 다목적댐(충주댐, 소양강댐)이 있는 것으로 고려하였으며, 각각의 댐에서 물을 공급하는 경우와 동시에 공급하는 경우에 대하여 댐 용수공급 가능유하량을 분석하였다.