• Title/Summary/Keyword: Case Manager

Search Result 395, Processing Time 0.042 seconds

An Exploratory Study on Causal Relationship between Perceptual Level of Employees and Information System Performance : Case of Public Side Information System Use (조직구성원의 인식 수준이 정보시스템 활용 성과에 미치는 영향에 관한 탐색적 연구 : 공공부문 정보시스템 사례를 중심으로)

  • Park, Ki-Ho
    • Journal of Information Technology Services
    • /
    • v.7 no.2
    • /
    • pp.165-180
    • /
    • 2008
  • Although a number of studies concerning the performance of information system (hereafter, IS) have been performed, those in governmental organizations have rarely conducted. Moreover, there were not many that the perceptual level of individuals might have influence on the information system performance actually. This study tried to investigate the causal relationship between personal perceptual level on the operation and performance of IS, as a result of project for public innovation which deployed in a governmental organization. The targeted IS is for task management. Our survey's respondents are real users in a governmental organization. As a result of statistical analysis, the affecting factors, the perceptual level of individuals such as task process standardization, training and system education, and the active participation of manager positively affected system performance. The result of study can provide some implications to the governmental organizations who want to improve the system performance and efficiently operate their own IS for achieving the organizational goals.

A Case Study on the application of Human Performance Technology for a strengthening of Convergence Project Management Capability (컨버전스 프로젝트 이행역량 강화를 위한 HPT(Human Performance Technology)적용 사례연구)

  • Kim, Woong-Geol;Park, Jai-Hyoung
    • 한국IT서비스학회:학술대회논문집
    • /
    • 2009.05a
    • /
    • pp.165-168
    • /
    • 2009
  • 현재 IT서비스 업체에서 새로운 성장동력으로 떠오르고 있는 분야가 융복합사업(IT+IT, IT+장비, IT+장비+시공)이라고 불리우는 컨버전스 프로젝트이다. 기존의 IT분야의 프로젝트와는 전혀 다른 특성을 갖고 있는 컨버전스 프로젝트에 대한 IT서비스 업체의 준비는 아직 미흡한 것이 현실이다. LG CNS에서는 이런 현실에서 컨버전스 프로젝트의 특성에 맞추어 기존 프로젝트 관리자(Project Manager)의 역할을 재정의하고 이를 현장에 적용시키기 위해 그동안의 컨버전스 프로젝트를 수행하면서 얻은 이슈에 HPT(Human Performance Technology; 수행공학)를 적용하여 조직적인 차원에서 프로젝트 관리자의 육성 로드맵을 만들고 이를 확산시키는 활동을 진행하고 있다. 이에 본 발표에서는 HPT측면에서 컨버전스 프로젝트 이행역량을 강화하기 위한 사례를 소개하고자 한다.

  • PDF

A Study on Real-time Monitoring System of Indoor Fire Detector using IoT (IoT를 활용한 옥내 화재감지기 실시간 모니터링 시스템에 관한 연구)

  • Lee, Hae-Keon;Kwak, Dong-Kurl;Lee, Bong-Seob
    • Proceedings of the KIPE Conference
    • /
    • 2018.07a
    • /
    • pp.267-269
    • /
    • 2018
  • This paper is a study to solve the malfunction of Fire Detection System and to react swiftly in case of fire. if a fire occurs because of malfunction of the fire receiver, it may not be possible to respond appropriately. in order to solve this problem, Fire Detection System using IoT, the manager studied the method of confirming the fire occurrence with mobile phone Application. We propose a wireless Fire Detection System by building a server and a client using a micom and a mobile phone application. This is to reduce the damage caused by the fire.

  • PDF

Applying BIM and GIS to Railway Maintenance Works in Taiwan

  • Liu, Li-Shih;Shr, Jin-Fang
    • International Journal of Aerospace System Engineering
    • /
    • v.2 no.1
    • /
    • pp.18-23
    • /
    • 2015
  • Based on real jobs, this study was carried out the Railway maintenance works in Taiwan. It hopes to use Geographic Information System(GIS) and Building Information Modeling(BIM) for changing the maintenance model from "post-damage repair" to "preventive maintenance". Accordingly, this research will build a Railway Repairing Database that installs all repair data. This database will also connect to GIS so that can be the source of analysis and statistic for repair paln. The main results of research are as follows: I. All data stored on cloud space that raises the ability to manage and plan on repair. II. Simplify the file work and increase the quantity of case data to the manager who can get more reliable source. III. The data offer objective judgment to avoid subjective argument. IV. Add the GIS information to improve the maintenance because of good analisis.

An Evaluation Method on the Environmental Camp Program: Hierarchical Holism and Open Inter-communication (위계적 총체성과 개방적 상호의사소통에 의한 환경캠프 프로그램 평가방법)

  • 이재영;이선경
    • Hwankyungkyoyuk
    • /
    • v.8 no.1
    • /
    • pp.107-121
    • /
    • 1995
  • The goal of this study was to establish the evaluation method, which consist of the principle, factor, procedure and checklist, on environmental camp program and then to support staffs of environmental camp for decision-making to improve pre-program and develop new one. The main principles of the evaluation method established in this study were Hierarchical holism and Open inter-communication. First, hierarchical holism focused at the interaction among six factors, which were divided by 3 steps : 1) goal(and objectives) 2) learners and sites 3) activities, staffs and media. Second, open inter-communication could be defined a feedback process among all program participants : manager, staff, teacher, volunteer, learner and so on. The evaluation checklist had been developed of 10 comprehensive items and 30 factor-items at the preliminary step but some items were assessed some complex or duplicate in the result of 3 case studies. The suggested checklist was diminished to 5 comprehensive items and 25 factor-items. Several alternatives, which included specifing learners and objectives, developing site-oriented program and establishing the evaluation sheet were suggested for improving environmental camp program.

  • PDF

Development of Technical Breakdown Structure Standard in Temporary Works (건설가설공사의 표준기술분류체계 구축)

  • Park, Jun-Mo;Kim, Ok-Kyue;Park, Gil-Bum
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.162-163
    • /
    • 2013
  • A temporary work are lifting equipment that tower crane or lift, and temporary architectures that office building and storage in construction site. And it is main construction work that built and used temporarily like to a scaffolding, a walk plate, and a formwork. This study is to adjust breakdown structure of temporary work to introduce technical tendency. With a site manager, it is collected a detailed statement and compared. As a result to break down a tendency that temporary equipment, additional function, and direct work of temporary technique, first, existing detail technical indexes that group I, group J, group K, and group L are classified. Second, due to set up and manage to main agents in case of existing detail technical indexes that B1, B2, it is not wrong to classify. But, it is somewhat different, and therefore adjust it to same level. Finally, as a technical tendency that temporary equipment, additional function, and direct work of temporary technique, it is adjusted the others.

  • PDF

Upward Influence to Overcome Hierarchical Authority Expectations: A New Approach for Stakeholder Management

  • Fan, Yang;Anantatmula, Vittal
    • Journal of Construction Engineering and Project Management
    • /
    • v.2 no.2
    • /
    • pp.28-35
    • /
    • 2012
  • Critical to project success is effective stakeholder management. This paper presents a challenge for the project manager who uses traditional approaches to manage mid-level stakeholders in an organization. Dual roles of a mid-level stakeholder (as a stakeholder of a project and as an agent of the corporate) may cause problems that would result in difficulties for project managers in identifying the stakeholder's attributes and overcoming hierarchical authority expectation. However, the dual roles of the stakeholder result in its weakness in the project-stakeholder relationship. Can a project leverage its strategic role for effective upward influence by linking project objectives to corporate strategic objectives? To address this research question, case study method was used to gain a deeper understanding of mid-level stakeholder's salience. This research proposes an upward influence strategy to embed a project-stakeholder relationship in a hierarchical stakeholder network.

A Case Study of Improving Operations Efficiency on the Steel Stockyard in Shipbuilding (강재적치장 운영 효율화 방안에 관한 사례연구)

  • Park, Chang-Kyu;Park, Ju-Chull
    • IE interfaces
    • /
    • v.18 no.2
    • /
    • pp.167-177
    • /
    • 2005
  • As the largest shipbuilding company in the world and the leader in the Korean merchant shipbuilding industry, Hyundai Heavy Industries is currently struggling to carry out intensive productivity improvement efforts in order to be the global merchant shipbuilding market leader by surpassing in the competition with Japan and being free from the defiance of China armed with very cheap labor costs. This paper introduces the academy-and-industry collaborative project, a part of the productivity improvement efforts, which has conducted on the steel stockyard operations. As a pilot project that researches for the way of improving the stockyard operations and ignites further projects on the stockyard operations, the project defined the stockyard operations, measured current situations, and analyzed management dilemmas. In addition, the project developed the steel stockyard operations simulator. Besides that the simulator is used by the operations manager who has heavily relied on his work-experienced intuition when making decisions, this paper expects that further projects on the stockyard operations utilize the simulator for their own purposes.

Development of NMS for Power Plant (전력설비를 위한 NMS의 개발)

  • Kwak Dong-Hyun;Park Hae-Won;Choi Seong-Kwan;Jo Heung Gi;Jeun Hee-Jong
    • Proceedings of the KIPE Conference
    • /
    • 2001.07a
    • /
    • pp.615-618
    • /
    • 2001
  • In this paper, a solution of network management system for power plant was introduced. In conventional systems, power installations use serial communication or MODEM for Management. In this case, it has a weak point in distance and speed. To solve these problems, the manage system based on Ethernet was developed. In order to implement, SNMP which is standard NMS of LAN was adapted, agent board and manager program for SNMP were developed.

  • PDF

A Study on the Estimating Probable Period of the Planting Work in Consideration of Weather Factor -In the Case of Seoul City- (기상요인을 고려한 조경식재 공사기간 설정에 관한 연구 -서울시를 사례로-)

  • 이상석;최기수
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.21 no.4
    • /
    • pp.69-82
    • /
    • 1994
  • The purpose of this study is to estimate the probable period of the planting work in consideration of weather factors. The impact degree of weather factors on the control of planting schedule was measured by the possible working days on the basis of weather condition. To establish the weather standard, the researcher analyzed the questionnaires on the manager of planting work and also the meteorological data for 10 years(1983-1992) in Seoul. The results are as follows; $\circled1$ The possible period of the planting work is from March 17 to May 18 Spring and from September 26 to December 15 in Autumn during a year. $\circled2$ The problem working days of the planting work(106-130) days per year) are less than the building construction days(174 days per year), because of handling the living material of plants, specially in summer and winter.

  • PDF