• 제목/요약/키워드: CSP model

검색결과 73건 처리시간 0.028초

운용가용도 제약하에서 소모성부품과 수리순환부품이 혼재된 동시조달부품의 최적구매량 결정 (Optimal Provisioning Quantity Determination of Concurrent Spare Parts including Consumable Items and Repairable Items under the Availability Limitation)

  • 오근태;김명수
    • 산업경영시스템학회지
    • /
    • 제23권59호
    • /
    • pp.53-67
    • /
    • 2000
  • In this paper we consider the CSP requirements determination problem of new equipment(machine) system. For the newly procured equipment systems, mathematical analyses are made for the system which is constructed with the consumable parts and the repairable parts to derive the associated CSP requirement determination model in mathematical expression. Based on these analyses, a mathematical model Is derived for making an optimal CSP requirement determination subject to the constraint of satisfying any given operational availability limitation. We assume that the failure of a part follows a Poisson process and the repair time has an exponential distribution. Firstly, the operational availability concept in CSP is defined and the relation between the general system availability and the operational availability is established. Secondly, the problem is formulated as the cost minimization problem that should satisfy the operational availability limitation, and then, using the generalized Lagrange multipliers method, the optimal solution procedure Is derived.

  • PDF

고출력 CW Nd:YAG 레이저를 이용한 CSP 1N 냉연강판 절단 공정의 3 차원 열전달 해석 (Three-dimensional heat transfer analysis of laser cutting process for CSP 1N sheet using high power CW Nd:YAG laser)

  • 김민수;안동규;이상훈;유영태;박형준;신호준
    • 한국정밀공학회:학술대회논문집
    • /
    • 한국정밀공학회 2005년도 추계학술대회 논문집
    • /
    • pp.162-165
    • /
    • 2005
  • The objective of this research work is to investigate into the three-dimensional temperature distribution using quasi steady-state heat transfer analysis fur the case of the laser cutting of CSP 1N sheet using high power CW Nd:YAG laser. The laser heat source is assumed as a volumetric heat source with a gaussian heat distribution in a plane. Through the comparison of the results of analyses with those of the experiments, the optimal finite element model is obtained. Finally, characteristics of the three-dimensional heat transfer and temperature distribution have been estimated by the optimal finite element model.

  • PDF

CspA의 발현이 저온에서의 재조합 단백질 생산성에 미치는 영향에 관한 연구 (A study on the effect of CspA expression on the productivity of recombinant protein at low temperature)

  • 김수현;허미애;이선구
    • KSBB Journal
    • /
    • 제24권1호
    • /
    • pp.96-100
    • /
    • 2009
  • 본 연구에서는 저온에서의 재조합 단백질 생산성 향상을 위하여 저온에서 RNA 샤페론 활성을 지닌다고 알려진 CspA 단백질의 발현이 서로 다른 온도에서 대장균의 성장 및 GFP의 발현 속도에 어떻게 영향을 미치는지를 살펴보았다. $20^{\circ}C$, $25^{\circ}C$, $37^{\circ}C$에서는 세포 성장 및 GFP의 생산이 CspA의 발현에 영향을 받지 않았으나, $15^{\circ}C$에서는 GFP의 총 생산성이 CspA의 동시 발현에 의해 향상되었으며 이는 세포 성장 속도의 향상에 기인함을 확인하였다. 결론적으로 CspA의 발현은 $15^{\circ}C$에서 세포 당 재조합 단백질 생산량의 증가에는 영향을 미치지 않으나, 즉 재조합 단백질의 번역 효율에는 큰 영향을 미치지 않으나, 대장균 성장 속도에 영향을 미치며, 이를 통해 재조합 단백질의 총 생산량 향상을 유도 할 수 있을 것으로 기대된다.

고장-기능 간 관계도를 이용한 다 기능 무기체계의 동시조달수리부속 최적화 연구 (Study to Optimize the Concurrent Spare Parts of Multiple Function Weapon System using Failure-Function Matrix)

  • 김경록;최효준
    • 한국산학기술학회논문지
    • /
    • 제16권8호
    • /
    • pp.5260-5266
    • /
    • 2015
  • 무기체계 개발 시 종합군수지원 측면에서 중요한 것 중 하나가 동시조달수리부속 산출이다. 동시조달수리부속은 무기체계 가용도 향상 측면에서 매우 중요한 것으로, 이에 대한 다양한 연구가 이루어지고 있다. 그러나 대부분의 연구는 하부 구성품의 고장이 무기체계의 다양한 기능에 미치는 세부 영향들을 고려하지 못하고 있다. 즉 하부 구성품의 고장이 무기체계의 특정 기능에 미치는 영향이 미비하면, 구성품 교환과 같은 정비가 필요 없다는 점을 고려하지 못한다. 그래서 본 연구에서는 고장-기능 간 관계도를 이용하여, 하부 구성품의 고장이 무기체계의 다양한 기능에 미치는 세부 영향을 고려한 동시조달수리부속 산출 방법을 기술하였다. 본 연구 절차는 다음과 같다. 첫째, 무기체계의 운용 및 정비 시스템을 분석한다. 둘째, 고장-기능 간 관계도를 개발한다. 셋째, 수집된 자료를 바탕으로 시뮬레이션 모델을 설계 한다. 마지막으로, 시뮬레이션과 메타 휴리스틱 모형인 진화 전략을 통해 동시조달수리부속 최적 수량을 선정한다. 해당 연구는 동시조달수리부속 산출 연구에 새로운 방향을 제시하였다.

생산공정의 형태가 AOQ에 미치는 영향 (The Effect on AOQ in CSP-1 by a Type of Production Process)

  • 주용준;강경식;김창은
    • 품질경영학회지
    • /
    • 제20권2호
    • /
    • pp.55-66
    • /
    • 1992
  • The sampling plan CSP-1 for continuous production was first proposed by Dodge in 1943. Continuous production refers to products which are flowing past the inspection station such as products moving on a conveyor belt. One important measure of the effectiveness of a CSP is the average outgoing quality(AOQ). A concept for a short run of production length time, denoted by AOQ(t), is provided. The assumption of a s-independence in CSP-1 is unrealistic. It is possible to relax the assumption of a s-independence. The need for Markov model in a continuous production process can be discussed in this paper. The Markov and renewal theory are used to describe the property of AOQ in CSP-1.

  • PDF

예산제약 하에서 운용가용도를 고려한 최적 동시조달수리부속품 소요 산출 모델 (The Computing Model of Demand Quantity for Optimal Current Spare Parts considering the Operational Availability under Budget)

  • 나인성;이계경;박명규
    • 대한안전경영과학회지
    • /
    • 제8권5호
    • /
    • pp.167-180
    • /
    • 2006
  • This study expands limitation of OASIS(Optimal Allocation of Spares for Initial Supports) program, which calculates CSP(Concurrent Spare Part), not only availability but also cost, and developed the program enabling run in WINDOW OS. By considering multi-step repair and logistics support system, repairing capability at the time of deployment, and procurement period, this model is the first local model reflecting circumstances of the armed forces of the Republic of Korea. Furthermore, the programmed model was selected as the military standard software and has being essentially used for CSP calculation.

The Thermal Characterization of Chip Size Packages

  • Park, Sang-Wook;Kim, Sang-Ha;Hong, Joon-Ki;Kim, Deok-Hoon
    • 한국마이크로전자및패키징학회:학술대회논문집
    • /
    • 한국마이크로전자및패키징학회 2001년도 3rd Korea-Japan Advanced Semiconductor Packaging Technology Seminar
    • /
    • pp.121-145
    • /
    • 2001
  • Chip Size Packages (CSP) are now widely used in high speed DRAM. The major driving farce of CSP development is its superior electrical performance than that of conventional package. However, the power dissipation of high speed DRAM like DDR or RAMBUS DRAM chip reaches up to near 2W. This fact makes the thermal management methods in DRAM package be more carefully considered. In this study, the thermal performances of 3 type CSPs named $\mu-BGA$^{TM}$$ $UltraCSP^{TM}$ and OmegaCSP$^{TM}$ were measured under the JEDEC specifications and their thermal characteristics were of a simulation model utilizing CFD and FEM code. The results show that there is a good agreement between the simulation and measurement within Max. 10% of $\circledM_{ja}$. And they show the wafer level CSPs have a superior thermal performance than that of $\mu-BGA.$ Especially the analysis results show that the thermal performance of wafer level CSPs are excellent fur modulo level in real operational mode without any heat sink.

  • PDF

자금제약하에서 동류전용이 허용될 때 수리가능한 동시조달부품의 적정소요량 결정 (Provisioning Quantity Determination of Repairable Concurrent Spare Part under Budget Constraint and Cannibalization Allowed)

  • 오근태;나윤균
    • 한국신뢰성학회지:신뢰성응용연구
    • /
    • 제12권3호
    • /
    • pp.225-238
    • /
    • 2012
  • In this paper determined is the quantity of repairable concurrent spare parts(CSP) of a new equipment system to maximize the operational availability under budget constraint and cannibalization allowed. When a part fails, the part is replaced and the failed part is repaired for later use while cannibalization is allowed. The failure of a part is assumed to follow a Poisson process and the availability in CSP is defined. The solution procedure consists of two parts. Firstly, a mathematical model is developed under the assumption that the failure rate is constant during the CSP period and cannibalization is not allowed. Secondly, proposed is a simulation search procedure which improves the heuristic solution to the near optimal solution in a reasonable amount of time under the assumption that the cannibalization is allowed.

부품재활용이 허용될 때 목표운용가용도 조건을 갖는 소모성 동시조달부품의 구매량 결정 (Provisioning Quantity Determination of Consumable Concurrent Spare Part with Objective Availability Limitation under Cannibalization Allowed)

  • 오근태;김명수
    • 한국신뢰성학회지:신뢰성응용연구
    • /
    • 제4권2호
    • /
    • pp.91-104
    • /
    • 2004
  • In this paper we consider the concurrent spare part(CSP) requirements problem of new equipment system. When a part fails, the part is replaced and the repair of failed part is impossible and cannibalization is allowed. We assume that the failure of a part knows a Poisson process. The operational availability concept in CSP is defined, and derive a formula to calculate the operational availability using expected machine operating time during CSP period. A mathematical model is derived for making an CSP requirement determination subject to the constraint of satisfying any given operational availability limitation and an heuristic solution search procedure is derived. An illustrative example is shown to explain the solution procedure.

  • PDF

2계층 분배시스템에서 혼합재고정책을 이용한 적정재고수준 결정에 관한 연구 (Determining the Proper Level of Spare Parts using the CSP and (r,Q) Policies in a Two-Echelon Distribution System)

  • 정석재;이정학;김경섭
    • 대한안전경영과학회지
    • /
    • 제9권4호
    • /
    • pp.121-127
    • /
    • 2007
  • CSP(Concurrent Spare Parts) is supplied with the procurement of new equipment or weapon system and is used to sustain the equipment without resupply during the initial coverage period. This study is concerned with a problem of determining the near optimal inventory level of the spare parts, especially Concurrent Spare Parts. For this, we utilize the mixed periodic and continuous review polices considering the CSP and (r,Q) Policies concurrently in a two-echelon distribution system. We propose the mathematical model to minimize the total cost which is composed with ordering cost, purchasing cost, holding cost, and stickout cost. If the mixed policy is compared to other policies(CSP, (r,Q)), the proposed methodology performs well and is best policy in the equipment maintenance expenses.