• Title/Summary/Keyword: CPM model

Search Result 57, Processing Time 0.026 seconds

Flexible Process Performance Measures by Quadratic Loss Function (이차손실함수를 이용한 유동적인 공정수행척도)

  • 정영배
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.18 no.36
    • /
    • pp.275-285
    • /
    • 1995
  • In recent years there has been increasing interest in the issue of process centering in manufacturing process, The traditional process capability indices Cp, Cpk and Cpu are used to provide measure of process performance, but these indices do not represent the issue of process centering. A new measure of the process capability index Cpm is proposed that takes into account the proximity to the target value as well as the process variation when assessing process performance. However, Cpm only considers acceptance cost for deviation from target value within specification limits, do not includes economic consideration for rejected items. This paper proposes flexible process performance measures that considered quadratic loss function caused by quality deviation within specification limits, rejection cost associated with the disposition of rejected items, and inspection cost. In this model disposition of rejected items are considered under perfect corrective procedures and the absence of perfect corrective procedures.

  • PDF

Method for Designing Adaptive UI Based on User's Context in the Environment Including Mobile Device and Public Display Device (모바일 장치와 공용 디스플레이 장치를 포함하는 환경에서 사용자의 특성에 기반한 Adaptive UI 설계 방안)

  • Kang, Seung-Soo;Ko, Hyun;Youn, Hee Yong
    • Journal of Information Technology Services
    • /
    • v.11 no.4
    • /
    • pp.181-194
    • /
    • 2012
  • The one of the most meaningful change in the recent ubiquitous environment is the omnipresence of public digital display device for providing ubiquitous information. It is the important issue to provide publicity as well as adaptive information to each user in the field of the public digital display device. This research proposes the idea ensuring fast response speed by the selection of user preference function. The preference function is selected by statistics using Zipf distribution in the system comprising mobile device and digital display device based on NFC (Near Field Communication). The idea is proved by CPM-GOMS model and the improvement of user response can be achieved.

Analysis of Boundary Conditions for Activities' Relationships in Linear Scheduling Model (선형 공정계획 모델의 액티비티 관계의 경계조건 분석)

  • Ryu, Han-Guk;Kim, Tae-Hui
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.1
    • /
    • pp.23-32
    • /
    • 2011
  • Domestic leading construction companies has been establishing and performing TACT scheduling method, similar to linear scheduling model such as line of balance and repetitive schedule, and etc. in which repetitive construction works are involved like high-rise building. Linear scheduling model has been researched as a visual scheduling method presenting the work space and time information. Likewise scheduling constraints of CPM network such as finish-to-finish, start-to-start, finish-to-start, start-to-start, linear scheduling model also has the relationships constraints, namely boundary conditions, between activities. It is especially necessary to define the boundary conditions of the activities' relationships in order to apply the linear scheduling model to be compatible with the network schedule. Therefore, this research considers the boundary conditions between activities for establishing the linear scheduling model. This paper also applies the proposed boundary conditions to TACT schedule and then deduces the main considerations in order to establish and perform TACT schedule.

Design and Analysis of Online Advertising Expenditure Model based on Coupon Download (쿠폰 다운로드를 기준으로 하는 온라인 광고비 모델의 설계 및 분석)

  • Jun, Jung-Ho;Lee, Kyoung-Jun
    • Journal of Intelligence and Information Systems
    • /
    • v.16 no.4
    • /
    • pp.1-19
    • /
    • 2010
  • In offline environment, unlike traditional advertising model through TV, newspaper, and radio, online advertising model draws instantaneous responses from potential consumers and it is convenient to assess. This kind of characteristics of Internet advertising model has driven the growth of advertising model among various Internet business models. There are, conventionally classified, CPM (Cost Per Mile), CPC (Cost Per Click), and CPS (Cost Per Sales) models as Internet advertising expenditure model. These can be examined in manners regarding risks that stakeholders should stand and degree of responsibility. CPM model that is based on number of advertisement exposure is mechanically exposed to users but not actually recognized by users resulting in risk of wasted expenditure by advertisers without any advertising effect. While on aspect of media, CPS model that is based on conversion action is the most risky model because of the conversion action such as product purchase is determined by capability of advertisers not that of media. In this regard, while there are issue of CPM and CPS models disadvantageously affecting only one side of Internet advertising business model value network, CPC model has been evaluated as reasonable both to advertisers and media, and occupied the largest segment of Internet advertising market. However, CPC model also can cause fraudulent behavior such as click fraud because of the competition or dishonest amount of advertising expenditure. On the user aspect, unintentionally accessed advertisements can lead to more inappropriate expenditure from advertisers. In this paper, we suggest "CPCD"(Cost Per Coupon Download) model. This goes beyond simple clicking of advertisements and advertising expenditure is exerted when users download a coupon from advertisers, which is a concept in between CPC and CPS models. To achieve the purpose, we describe the scenario of advertiser perspective, processes, participants and their benefits of CPCD model. Especially, we suggest the new value in online coupon; "possibility of storage" and "complement for delivery to the target group". We also analyze the working condition for advertiser by a comparison of CPC and CPCD models through advertising expenditure simulation. The result of simulation implies that the CPCD model suits more properly to advertisers with medium-low price products rather than that of high priced goods. This denotes that since most of advertisers in CPC model are dealing with medium-low priced products, the result is very interesting. At last, we contemplate applicability of CPCD model in ubiquitous environment.

Web-based Three-step Project Management Model and Its Software Development

  • Hwang Heung-Suk;Cho Gyu-Sung
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2006.05a
    • /
    • pp.373-378
    • /
    • 2006
  • Recently the technical advances and complexities have generated much of the difficulties in managing the project resources, for both scheduling and costing to accomplish the project in the most efficient manner. The project manager is frequently required to render judgments concerning the schedule and resource adjustments. This research develops an analytical model for a schedule-cost and risk analysis based on visual PERT/CPM. We used a three-step approach: 1) in the first step, a deterministic PERT/CPM model for the critical path and estimating the project time schedule and related resource planning and we developed a heuristic model for crash and stretch out analysis based upon a time-cost trade-off associated with the crash and stretch out of the project. 2) In second step, we developed web-based risk evaluation model for project analysis. Major technologies used for this step are AHP (analytic hierarchy process, fuzzy-AHP, multi-attribute analysis, stochastic network simulation, and web based decision support system. Also we have developed computer programs and have shown the results of sample runs for an R&D project risk analysis. 3) We developed an optimization model for project resource allocation. We used AHP weighted values and optimization methods. Computer implementation for this model is provided based on GUI-Type objective-oriented programming for the users and provided displays of all the inputs and outputs in the form of GUI-Type. The results of this research will provide the project managers with efficient management tools.

  • PDF

Primary somatosensory cortex and periaqueductal gray functional connectivity as a marker of the dysfunction of the descending pain modulatory system in fibromyalgia

  • Matheus Soldatelli;Alvaro de Oliveira Franco;Felipe Picon;Juliana Avila Duarte;Ricardo Scherer;Janete Bandeira;Maxciel Zortea;Iraci Lucena da Silva Torres;Felipe Fregni;Wolnei Caumo
    • The Korean Journal of Pain
    • /
    • v.36 no.1
    • /
    • pp.113-127
    • /
    • 2023
  • Background: Resting-state functional connectivity (rs-FC) may aid in understanding the link between painmodulating brain regions and the descending pain modulatory system (DPMS) in fibromyalgia (FM). This study investigated whether the differences in rs-FC of the primary somatosensory cortex in responders and non-responders to the conditioned pain modulation test (CPM-test) are related to pain, sleep quality, central sensitization, and the impact of FM on quality of life. Methods: This cross-sectional study included 33 females with FM. rs-FC was assessed by functional magnetic resonance imaging. Change in the numerical pain scale during the CPM-test assessed the DPMS function. Subjects were classified either as non-responders (i.e., DPMS dysfunction, n = 13) or responders (n = 20) to CPM-test. A generalized linear model (GLM) and a receiver operating characteristic (ROC) curve analysis were performed to check the accuracy of the rs-FC to differentiate each group. Results: Non-responders showed a decreased rs-FC between the left somatosensory cortex (S1) and the periaqueductal gray (PAG) (P < 0.001). The GLM analysis revealed that the S1-PAG rs-FC in the left-brain hemisphere was positively correlated with a central sensitization symptom and negatively correlated with sleep quality and pain scores. ROC curve analysis showed that left S1-PAG rs-FC offers a sensitivity and specificity of 85% or higher (area under the curve, 0.78, 95% confidence interval, 0.63-0.94) to discriminate who does/does not respond to the CPM-test. Conclusions: These results support using the rs-FC patterns in the left S1-PAG as a marker for predicting CPM-test response, which may aid in treatment individualization in FM patients.

NEW TREND OF SCHEDULING IN LINEAR CONSTRUCTION PROJECT

  • S. Sankar;J. Senthil
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.917-923
    • /
    • 2005
  • Scheduling is one of the main functions in construction project to determine the sequence of activities necessary to complete a project. The scheduling techniques provide important information crucial to a project's success. Highway construction project the paving activity can be considered a linear activity. Linear scheduling technique may be better suited for linear projects than other scheduling techniques. A new type of scheduling in linear project is calling Linear Scheduling Model (LSM). The Project monitoring and controlling is very ease to identify that all the stage of linear project and have more advantages.

  • PDF

What Made Her Give Up Her Breasts: a Qualitative Study on Decisional Considerations for Contralateral Prophylactic Mastectomy among Breast Cancer Survivors Undergoing BRCA1/2 Genetic Testing

  • Kwong, Ava;Chu, Annie T.W.
    • Asian Pacific Journal of Cancer Prevention
    • /
    • v.13 no.5
    • /
    • pp.2241-2247
    • /
    • 2012
  • Objective: This qualitative study retrospectively examined the experience and psychological impact of contralateral prophylactic mastectomy (CPM) among Southern Chinese females with unilateral breast cancer history who underwent BRCA1/2 genetic testing. Limited knowledge is available on this topic especially among Asians; therefore, the aim of this study was to acquire insight from Chinese females' subjective perspectives. Methods: A total of 12 semi-structured in-depth interviews, with 11 female BRCA1/BRCA 2 mutated gene carriers and 1 non-carrier with a history of one-sided breast cancer and genetic testing performed by the Hong Kong Hereditary Breast Cancer Family Registry, who subsequently underwent CPM, were assessed using thematic analysis and a Stage Conceptual Model. Breast cancer history, procedures conducted, cosmetic satisfaction, pain, body image and sexuality issues, and cancer risk perception were discussed. Retrieval of medical records using a prospective database was also performed. Results: All participants opted for prophylaxis due to their reservations concerning the efficacy of surveillance and worries of recurrent breast cancer risk. Most participants were satisfied with the overall results and their decision. One-fourth expressed different extents of regrets. Psychological relief and decreased breast cancer risk were stated as major benefits. Spouses' reactions and support were crucial for post-surgery sexual satisfaction and long-term adjustment. Conclusions: Our findings indicate that thorough education on cancer risk and realistic expectations of surgery outcomes are crucial for positive adjustment after CPM. Appropriate genetic counseling and pre-and post-surgery psychological counseling were necessary. This study adds valuable contextual insights into the experiences of living with breast cancer fear and the importance of involving spouses when counseling these patients.

A Study on the Internet User's Economic Behavior of Provision of Personal Information: Focused on the Privacy Calculus, CPM Theory (개인정보 제공에 대한 인터넷 사용자의 경제적 행동에 관한 연구: Privacy Calculus, CPM 이론을 중심으로)

  • Kim, Jinsung;Kim, Jongki
    • The Journal of Information Systems
    • /
    • v.26 no.1
    • /
    • pp.93-123
    • /
    • 2017
  • Purpose The purpose of this study is to deduct the factors for explaining the economic behavior of an Internet user who provides personal information notwithstanding the concern about an invasion of privacy based on the Information Privacy Calculus Theory and Communication Privacy Management Theory. Design/methodology/approach This study made a design of the research model by integrating the factors deducted from the computation theory of information privacy with the factors deducted from the management theory of communication privacy on the basis of the Dual-Process Theory. In addition, this study, did empirical analysis of the path difference between groups by dividing Internet users into a group having experience in personal information spill and another group having no experience. Findings According to the empirical analysis result, this study confirmed that the Privacy Concern about forms through the Perceived Privacy Risk derived from the Disposition to value Privacy. In addition, this study confirmed that the behavior of an Internet user involved in personal information offering occurs due to the Perceived Benefits contradicting the Privacy Concern.

An Administration Model for Causation of the Schedule Delays in Construction Projects (건설공사 공기연장사유 관리모델)

  • Kim, Jong-Han;Kim, Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.3
    • /
    • pp.125-133
    • /
    • 2007
  • If project time extension were required in the construction projects, either liquidated damages or extension costs should be applied according to causation of the schedule delays. However, in actual cases it is not applied so far according to the contract conditions. The reason why this situation happened Is that function of the present planning and scheduling is not working feasibly. The CPM schedule could not provide a proper solution for apportioning responsibility for the schedule delays. This situation could be considered as breach of contract and will cause potential disputes for schedule delay. Therefore, in this research process based contract administration model for construction delay claim is proposed to prevent schedule delay and solve the claims. The model is based on pro-active management for causation of delay to provide apportionment of responsibility and written evidences.