• 제목/요약/키워드: CONSTRUCTION SCHEDULE MANAGEMENT

검색결과 543건 처리시간 0.022초

AUTOMATED CONSTRUCTION PLANNING AND VISUALIZATION

  • M. Kataoka
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.61-68
    • /
    • 2007
  • There has been a lot of research on and release of commercial systems that enable evaluation and visualization of construction methods. These have enabled the selection of good construction plans. However, the process in which engineers build 3D geometry, formulate a schedule and eventually synchronize them is still a time-consuming process. Changing any aspect of the geometry or the schedule and re-linking them is also time-consuming. Therefore, the engineers may compromise on getting the best solution. This paper describes a technique to automate the generation of multiple sets of schedules, quantity takeoffs and 4D visualization from a single 3D model.

  • PDF

건설공사 안전사고 예방을 위한 안전관리 체크리스트 개선과 공정관리와의 연계운영 방법 (A Study of Methods on Safety Checklist Improvement and Integrated Operation with Schedule for Construction Accident Prevention)

  • 양용철;최훈;김재준
    • 한국건설관리학회논문집
    • /
    • 제5권2호
    • /
    • pp.123-135
    • /
    • 2004
  • 건설공사에서 안전사고 예방을 위하여 안전조직, 교육, 점검과 평가에 많은 노력을 기울이고 있으나 안전사고가 감소하지 않고 있는 실정이다. 건설현장의 안전사고를 예방하기 위하여 안전관리자, 안전교육, 점검과 평가, 공정관리, 안전관리 체크리스트의 활용에 관한 실태조사를 실시하고 문제점을 분석하였다. 그에 따라 작업에 관한 안전관리 체크리스트를 상세하게 사전에 작성하여 전산화하고 부가적인 정보를 연계하여 활용도를 높이는 체크리스트 개선안을 제시하였다. 나아가 체크리스트와 공정표상의 작업과의 연계방법과 운영방법을 제시하여 체크리스트가 시간개념을 갖고 체계적으로 활용되어 안전사고를 예방할 수 있도록 하였다.

계획공정표, 모든 지연을 포함한 준공공정표, 발주자 지연을 제외한 준공공정표의 비교를 통한 공기지연분석 (A Delay Analysis based on the Comparison of the As-planned Schedule, As-built Schedule including All Delays and As-built Schedule absent Owner Delays)

  • 윤철성;주해금;김선규
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2003년도 학술대회지
    • /
    • pp.426-429
    • /
    • 2003
  • 건설공사는 프로젝트의 진행 중 내${\cdot}$외부의 여러 조건의 변경이나 사회적 요구에 따라 초기의 계약과는 다른 많은 변경사항이 발생하게 된다. 이러한 변경사항은 프로젝트 추진과정에서 많은 영향을 미치게 되며, 이로 인하여 발생되는 영향은 대부분 프로젝트의 공기지연으로 나타나게 된다. 건설공사에서 발생하는 공기 지연은 기본적으로 도급자의 면책여부에 따라 공기연장이나 지체상금의 부과 등의 결과로 나타나게 되는데 이러한 사항에 대한 발주자와 도급자의 의견이 대립될 경우 클레임으로 발전하게 된다. 클레임에서 가장 중요한 사항은 공기지연일수의 산정으로서 이는 공기지연 클레임에서 가장 중요한 부분이라고 할 수 있다. 본 연구에서는 공기지연 클레임에서 가장 중요한 자료가 되는 공기지연일수 산정방법의 한 방법으로 계약 초기에 작성된 계획공정표(As-Planned Schedule)와 모든 지연이 포함된 준공공정표(As-Built Schedule including all delays) 그리고 발주자 지연이 제외된 준공공정표(As-Built schedule absent owner delays)를 비교함으로써 각 계약 구성원의 귀책으로 인한 광기 지연일수 산정방법을 제시하고자 한다.

  • PDF

일일 공정 Check System을 활용한 인력관리 사례 연구 (A study on the Human Resource Management through Application of Daily Scheduling Check System)

  • 박찬정;박홍태
    • 한국건설관리학회논문집
    • /
    • 제5권1호
    • /
    • pp.124-132
    • /
    • 2004
  • 대부분 국내 건설현장의 인력관리는 협력업체별 당일 출역현황만을 관리하고 있다. 그러나 이와 같은 인력관리 방법은 적정투입 인력 및 생산성 확인, 계획대비 실투입 인력의 오차를 명확히 파악할 수 없기 때문에 이로 인해 발생하는 공기지연을 사전에 예방할 수 없는 한계를 가지고 있다. 이는 건설현장에서 공정계획과 인력자원이 상호 유기적으로 연계된 관리 노력의 부재에 그 원인이 있다. 따라서 건설현장의 공정관리 능력향상을 통하여 공정계획을 기반으로 한 체계적인 협력업체 인력관리의 필요성이 요구된다. 본 고에서는 CPM 공정표에 인적자원을 연계하여 관리할 수 있는 변혁 프로그램으로써 일일공정 Check System을 개발하였다. 또한 실제 공사 중인 아파트현장의 골조공사에 이를 적용하여 본 시스템의 활용 타당성과 효과를 검증하였다.

블로그 기반 공정리스크 관리시스템 (Blog-based Schedule Risk Management System)

  • 진수명;윤유상;장명훈;서상욱
    • 한국건설관리학회논문집
    • /
    • 제10권5호
    • /
    • pp.47-56
    • /
    • 2009
  • 정보화 사회로의 전환으로 대변되는 최근의 건설 환경 변화로 인하여 대형 건설업체는 정보관리사업에 투자를하고 있는 반면, 중소형 건설업체는 정보관리시스템의 필요성을 인식하고 있음에도 불구하고 기술력의 부재로 인하여 정보 관리에 문제점을 가지고 있다. 더욱이 중소형 건설업체는 경쟁력 강화를 위한 범용적인 정보관리시스템의 부재로 인하여 중장기적으로 경쟁력 강화를 위한 효율적인 공정관리와 공정리스크 관리에 문제점을 가질 것으로 예상된다. 따라서 IT시스템 기반이 미비한 중소형 건설업체를 대상으로 공정관리 업무 수행에 필요한 정보를 제공하고 건설프로젝트 수행과정에서 존재하는 공정리스크 요인에 대해서 프로젝트 초기단계와 착공 전 단계에서 미리 대비하며, 경험이 부족한 건설현장 실무자에게 공정리스크 관리지식을 제공하기 위한 시스템이 필요하다. IT시스템 중에서도 최근 웹상의 연계 기술과 네트워크의 힘으로 인해서 효율적인 KM 실행 도구로 인식되고 있는 블로그를 공정리스크관리와 연계시켜 활용함으로써 공사경험이 부족한 현장관리자가 시공단계에서 발생할 가능성이 높은 공정리스크에 대해 착공 이전 단계에서 확인하고 관리대상리스크 선정 및 대응방법의 기준을 마련하기 위해 공정리스크관리 지원도구로서 블로그 기반의 공정리스크 관리 시스템을 개발하였다.

베이지안넷 기반의 프로젝트 일정리스크 평가 (Project Schedule Risk Assessment Based on Bayesian Nets)

  • 성홍석;박철순
    • 산업경영시스템학회지
    • /
    • 제39권1호
    • /
    • pp.9-16
    • /
    • 2016
  • The project schedule risk in the engineering and facility construction industry is increasingly considered as important management factor because the risks in terms of schedule or deadline may significantly affect the project cost. Especially, the project-based operating companies attempt to find the best estimate of the project completion time for use at their proposals, and therefore, usually have much interest in accurate estimation of the duration of the projects. In general, the management of projects schedule risk is achieved by modeling project schedule with PERT/CPM techniques, and then performing risk assessment with simulation such as Monte-Carlo simulation method. However, since these approaches require the accumulated executional data, which are not usually available in project-based operating company, and, further, they cannot reflect various schedule constraints, which usually are met during the project execution, the project managers have difficulty in preparing for the project risks in advance of their occurrence in the project execution. As these constraints may affect time and cost which role as the crucial evaluation factors to the quality of the project result, they must be identified and described in advance of their occurrence in the project management. This paper proposes a Bayesian Net based methodology for estimating project schedule risk by identifying and enforcing the project risks and its response plan which may occur in storage tank engineering and construction project environment. First, we translated the schedule network with the project risks and its response plan into Bayesian Net. Second, we analyzed the integrated Bayesian Net and suggested an estimate of project schedule risk with simulation approach. Finally, we applied our approach to a storage tank construction project to validate its feasibility.

선형 공정계획 모델의 작업 관계성 적용 방법 (Application of Work Relationships for Linear Scheduling Model)

  • 류한국
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2010년도 춘계 학술논문 발표대회 1부
    • /
    • pp.131-133
    • /
    • 2010
  • As linear scheduling method has been used since 1929, Empire State Building linear schedule, it is being applied in various fields such as construction and manufacturing. When addressing concurrent critical path occurring on linear schedule of construction, the empirical researches stress the resource management which should be applied for optimizing work flow, flexible work productivity and continuos resource allocation. However, work relationships has been usually overlooked for making the linear schedule from existing network schedule. Therefore, this research analyze the previous researches related to linear scheduling model and then propose the method that can be applied for adopting the relationships of network schedule to the linear schedule.

  • PDF

IMPROVEMENT OF TACT SCHEDULE MANAGEMENT PROCESS FOR THE FINISH WORK OF APARTMENT HOUSES

  • Joo-Young Jung;Sang-Ho Yoon;Kyung-Kook Lee;Chang-Gyo Kim;Jae-Youl Chun
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.554-562
    • /
    • 2007
  • This study determined tact process paths by separating the finish works according to the properties of work areas and work relations in order to apply the tact schedule management to the finish works. In addition, by suggesting preparing and sharing the workflow charts, the experiments can be shared between the executors and any possible frictions between the specialist works can be identified in advance. In addition, any errors on the plan can be reviewed and modified through the measurement stage of tact plan attainment rate. The process of tact schedule management is improved with such tools and methods and the efficiency of the process through the application of cases was verified.

  • PDF

기성지급방식 비교분석을 통한 국내 공정관리 활성화 방안에 관한 연구 -경부고속철도 공사와 대만 고속철도공사 비교 중심으로- (A study activating devices in scheduling management for analyzing progress payment in Korea)

  • 이태식;김영현;정현진;김영환;김대영;윤철수;노시현
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2001년도 춘계학술대회 논문집
    • /
    • pp.66-71
    • /
    • 2001
  • Most payments in domestic construction are issued in lumpsum unit price contracts according to the completed construction rate. This method generates problems in losing time and increased costs for the owner and contactor. In overseas projects, payments are issued in accordance to completed milestones. The milestones themselves base on the original schedule and allow effective schedule management on the tasks. In domestic construction, however, introduction of milestone payments requires enhanced management capability of owners and contractors. Hence, this study investigating how to activate schedule management devices to analyze progress payments in domestic construction.

  • PDF

산출내역서.공정 통합관리 모형 구축에 관한 연구 (Work Management Model to Integrate Schedule and Bill of Quantit)

  • 박홍태;박찬정
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2002년도 학술.기술논문발표회
    • /
    • pp.123-131
    • /
    • 2002
  • Recently our government operates earned value management system (EVMS) for improving work management system of the construction projects over specific scale. The EVMS is based on the integrated management between construction cost and schedule, the existing systems, however, are focused on the cost management by using wort quantity. This study suggests a work management mode1 to integrate construction cost with activity information. The model introduces a work task concept as a tool that can connect construction cost to activity information. The suggested model in this study is verified by using actual data for the applicability to practical construction projects.

  • PDF