• Title/Summary/Keyword: CM Delivery Support System

Search Result 6, Processing Time 0.018 seconds

Development of a Business Support System by Phase for Delivering Construction Management Contract in the Government Civil Project (공공토목사업 CM 발주를 위한 단계별 업무지원 시스템 구축)

  • Chae, Yeong-Seok;Park, Seo-Young;Moon, Hyoun-Seok;Kim, Seon-Yeong;Kang, Leen-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.5
    • /
    • pp.81-92
    • /
    • 2011
  • Recently, the MLTM (Ministry of Land, Transport and Maritime Affairs) has announced CM business guidelines, because it is expected that the CM deliveries are going to be increased for a civil engineering industry with enforcement of the CM at Risk. In this trend, The CM business guideline, which is currently announced, is for the steps after the CM contract. However, the practical business guideline from a planning phase for the CM delivery to a selection phase of a CMr (Construction Manager) is essential for public construction projects including the civil engineering projects that the frequency of the CM deliveries is not sufficient. Therefore, this study established a standardized process model from the planning phase for the CM delivery to the selection phase of the CMr. study configured a business breakdown structure for CM delivery. A prototype system for supporting the CM delivery was also developed, and a practical operability was verified by a case evaluation based on the developed system. Hence, it is expected that this study will be utilized as a supporting system of the CM delivery business for public clients, which have not sufficient cases of the CM delivery.

Project Performance Comparison Based on Different Types of Project Delivery System (사례연구 분석을 통한 발주방식별 성과비교)

  • Lee, Soo-Kyong;Jung, Young-Soo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05a
    • /
    • pp.207-209
    • /
    • 2011
  • Numerous reports show that alternative project delivery systems (PDSs) such as design-build (DB), construction management at risk (CMR), and design-build-maintain (DBM) are increasingly used in many countries. This study compared characteristics of each PDS (design-bid-build (DBB), DB, CMR, or DBM) by analyzing quantitative data from 9 research articles. In order to compare characteristics between DBB and alternative PDSs, the study is based on principal 3 factors - Time, Cost, and Quality. DB shows the best performance in the time part and also the cost performance depending on facility type and project size. The performance of quality has minor difference among different PDSs. These results support the fact that using an appropriate PDS by the characteristic of a project makes high value of efficiency and productivity.

  • PDF

Development of Stair Climbing Robot for Delivery Based on Deep Learning (딥러닝 기반 자율주행 계단 등반 물품운송 로봇 개발)

  • Mun, Gi-Il;Lee, Seung-Hyeon;Choo, Jeong-Pil;Oh, Yeon-U;Lee, Sang-Soon
    • Journal of the Semiconductor & Display Technology
    • /
    • v.21 no.4
    • /
    • pp.121-125
    • /
    • 2022
  • This paper deals with the development of a deep-learning-based robot that recognizes various types of stairs and performs a mission to go up to the target floor. The overall motion sequence of the robot is performed based on the ROS robot operating system, and it is possible to detect the shape of the stairs required to implement the motion sequence through rapid object recognition through YOLOv4 and Cuda acceleration calculations. Using the ROS operating system installed in Jetson Nano, a system was built to support communication between Arduino DUE and OpenCM 9.04 with heterogeneous hardware and to control the movement of the robot by aligning the received sensors and data. In addition, the web server for robot control was manufactured as ROS web server, and flow chart and basic ROS communication were designed to enable control through computer and smartphone through message passing.

Decision Making Process for Alternative Selection of Proper Design Change in Construction Project (적정 설계변경안 선정을 위한 의시결정 지원 프로세스)

  • Lee, Jong-Sik;Chun, Jae-Youl
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.2
    • /
    • pp.74-82
    • /
    • 2010
  • A government agency has been announced to increase 23,663 hundred million wons by cost of design change which occurred in the pre-construction and construction phase. As design change is a phenomenon to occur by means of a characteristic of the building design that standardization is difficult, even if it is said that a perfect design is done in design phase, design change is prevented, and it is going to decrease, and there is a limit. Because there are some causes in all of the construction project, it is change order of client, relative system, unfit design and field condition, etc. In this study, we are suggested logic and basic model of the decision making support process model that it should selecting the optimal alternative through complex and quantitative analyzed: that is cost, performance and constructability as respect Owner or CMr is executing project under the CM delivery system construction project which it occurred design change.

Patient-Specific Quality Assurance in a Multileaf Collimator-Based CyberKnife System Using the Planar Ion Chamber Array

  • Yoon, Jeongmin;Lee, Eungman;Park, Kwangwoo;Kim, Jin Sung;Kim, Yong Bae;Lee, Ho
    • Progress in Medical Physics
    • /
    • v.29 no.2
    • /
    • pp.59-65
    • /
    • 2018
  • This paper describes the clinical use of the dose verification of multileaf collimator (MLC)-based CyberKnife plans by combining the Octavius 1000SRS detector and water-equivalent RW3 slab phantom. The slab phantom consists of 14 plates, each with a thickness of 10 mm. One plate was modified to support tracking by inserting 14 custom-made fiducials on surface holes positioned at the outer region of $10{\times}10cm^2$. The fiducial-inserted plate was placed on the 1000SRS detector and three plates were additionally stacked up to build the reference depth. Below the detector, 10 plates were placed to avoid longer delivery times caused by proximity detection program alerts. The cross-calibration factor prior to phantom delivery was obtained by performing with 200 monitor units (MU) on the field size of $95{\times}92.5mm^2$. After irradiation, the measured dose distribution of the coronal plane was compared with the dose distribution calculated by the MultiPlan treatment planning system. The results were assessed by comparing the absolute dose at the center point of 1000SRS and the 3-D Gamma (${\gamma}$) index using 220 patient-specific quality assurance (QA). The discrepancy between measured and calculated doses at the center point of 1000SRS detector ranged from -3.9% to 8.2%. In the dosimetric comparison using 3-D ${\gamma}$-function (3%/3 mm criteria), the mean passing rates with ${\gamma}$-parameter ${\leq}1$ were $97.4%{\pm}2.4%$. The combination of the 1000SRS detector and RW3 slab phantom can be utilized for dosimetry validation of patient-specific QA in the CyberKnife MLC system, which made it possible to measure absolute dose distributions regardless of tracking mode.

Investigation of the Current Clinical Result of Korean Medical Treatment of Infertility -In Major University Korean Medicine Hospitals and Local Korean Medicine Clinics Participated in the Research- (한방 난임 치료의 특성과 결과에 대한 분석 -2011년 주요 한의과대학 부속한방병원 및 연구 참여 한의원을 중심으로-)

  • Lee, Dong-Nyung;Choi, Min-Sun;Kim, Dong-Il
    • The Journal of Korean Obstetrics and Gynecology
    • /
    • v.27 no.4
    • /
    • pp.69-87
    • /
    • 2014
  • Objectives: We analyzed retrospective clinical data of Korean medical institutes for infertility care and investigated current status and outcome of the Korean medical treatment of infertility as a part of foundational research for verifying validity of constructing national support system and developing appropriate policy on Korean medical treatment of infertility. Methods: We investigated data uploaded on the homepage of The Society of Korean Medicine for Subfertility (http://www.okinfertility.org) by Korean medical institutes for infertility care to get informations such as patients' age, body height, weight, methods of Korean medical treatment, cost and duration of treatment, success or failure of pregnancy and result of treatment. Results: The average age of patients was $33.1{\pm}3.8$ and the average body height was $161.2{\pm}5.3cm$ and the average body weight was $55.2{\pm}8.5kg$. The method of Korean medical treatment was Herbal medicine (97.5%), acupuncture (80.4%), moxibustion (57.7%), cupping (32.7%). The average cost of treatment was $1,160,625{\pm}882,499$ won, and the average medical cost per visit was $357,845{\pm}241,602$ won. The average duration of treatment was $11.26{\pm}10.58$ weeks, and the average number of visits per patient was $4.78{\pm}6.10$ times. The average duration of treatment was the longest in the group of infertile patients with the highest average medical cost per visit. The average pregnancy success rate was 30.9% overall, and that of the group of infertile patients was 25.8%. Conclusions: When we develop the standard project model with expectation for about 25% success rate of pregnancy and delivery in the group of patients who have idiopathic and ovulatory factors, it is desirable to perform acupuncture and moxibustion treatment 1-2 times a week with herbal medicine. The treatment period is set to at least 12 weeks. Average treatment fee maybe calculated by converting the averaged treatment cost of clinic's one month worth of daily treatment fee and medical hospital's ten day treatment fee into weekly treatment cost.