• Title/Summary/Keyword: Building modeling

Search Result 1,978, Processing Time 0.03 seconds

A STUDY FOR FIRE EXTENSION MECHANISM BETWEEN FLOORS IN A RESIDENTIAL BUILDING WITH NUMERICAL MODELING (주거형 빌딩의 층간 화염전이 화재해석 모델링)

  • Ahn, Chan-Sol
    • 한국전산유체공학회:학술대회논문집
    • /
    • 2011.05a
    • /
    • pp.512-517
    • /
    • 2011
  • This study is intended for validation of numerical modeling of a residential building which is made to simulate a phenomenon of fire extension from floor to floor. A common residential building which has the area of 80m2 each floor and some combustibles were chosen for numerical modeling. The combustible models were verified through comparing results of numerical simulations and real fire tests. For computational analysis, the Fire Dynamics Simulator was used with Large Eddy Simulation model for turbulence. Consequently, fire-intensity was well predicted and flash-over of rooms were successfully estimated.

  • PDF

BIM-Based VE Proposal Management Using Parametric Modeling (파라메트릭 모델링을 활용한 BIM기반 VE제안 관리 방안)

  • Kim, Dain;Choi, Jaehyun;Lee, Jin Gang
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.163-164
    • /
    • 2023
  • The technical proposal bidding system emphasizes the evaluation of the construction company's technical capabilities, with the aim of improving the quality and cost-effectiveness of the construction. However, in the VE analysis and proposal process for technical proposal bidding, the ideas are often reused from similar past construction projects, and the application of new construction technologies/methods is often lacking. Therefore, this study proposes a methodology for managing VE proposal information by integrating it into a BIM model using parametric modeling. This research developed database based on the existing VE proposals and new construction technology/method information from the Korea Institute of Civil Engineering and Building Technology. And by using parametric modeling, the proposed method integrate the VE database with BIM model. The methodology proposed in this study is expected to improve the reliability and effectiveness of VE-related idea proposals in technical proposal bidding.

  • PDF

BIM-Based New Construction Technology Database Using Parametric Modeling (파라메트릭 모델링을 활용한 BIM 기반 건설신기술 데이터베이스 구축)

  • Kim, Dain;Choi, Jaehyun;Lee, Jin Gang
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.11a
    • /
    • pp.163-164
    • /
    • 2023
  • The active promotion of construction technology application, aimed at cost reduction, construction time shortening, and performance enhancement during the implementation of Value Engineering (VE) in design, is underway. However, in the process of deriving VE ideas, it is common to simply reuse VE ideas from similar past construction projects, and the application of construction technology is often insufficient. Therefore, in this study, we intend to establish a database linking construction technology information with Building Information Modeling (BIM) models to activate the application of construction technology in the process of deriving VE ideas.

  • PDF

A Study on the BIM Application in Architecture Design Phase - Focus on BIM(Building Information Modeling) Process for Schematic Design- (건축설계에서 BIM(Building Information Modeling) 적용에 관한 연구 -계획설계 BIM(Building Information Modeling) 프로세스를 중심으로-)

  • Min, Young-Gi;Lee, Jae-Kook
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.11 no.4
    • /
    • pp.29-38
    • /
    • 2011
  • In this study, neighborhood facility and office building to target two cases were performed BIM process. In the initial design phase of the planning process was conducted for the BIM process modeling, BIM in the design stage while performing the required range and level of the process were studied. Accordingly, from architectural firms to leverage BIM process, the proposed methods, efficient use of the modeling process proposed. Quality management information and input for the modeling and design process should be determined from the initial design and construction, including, for each field should be considered BIM, which require an appropriate range of information, according to these requirements, BIM creation and expansion of the level of information should be clearly defined. Perform the procedure for BIM in the process of communicating with stakeholders is critical. In addition, the input data and output data needed to perform management and to perform at the level obtained BIM design process and the model should be clear.

Cost Management System for Mechanical, Electrical, and Plumbing(MEP) Coordination Using Building Information Modeling(BIM) - A Case Study (BIM 기반 MEP 설계 조율 프로세스 분석을 통한 비용 관리 시스템 개발 사례 연구)

  • Won, Jongsung;Ham, Sungil;Jang, Sejun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.22 no.2
    • /
    • pp.195-205
    • /
    • 2022
  • This paper aims to propose a cost-based mechanical, electrical, and plumbing(MEP) coordination process using building information modeling(BIM). The proposed process can help project participants eliminate identified clashes between the MEP elements, analyze trends relating to MEP costs during the coordination process, and share their findings. MEP quantity-related information extracted through BIM was integrated with the cost database and schedule information. To check the applicability of the proposed process, it was applied to a construction project in South Korea. Through the application of the proposed process, MEP-related cost was reduced.

Definition of 3D Modeling Level of Detail in BIM Regeneration Through Reverse Engineering - Case Study on 3D Modeling Using Terrestrial LiDAR - (역설계를 통해 BIM 구축시에 3D 모델링에 대한 세밀도(LoD) 정립 - 지상 LiDAR 활용한 3D 모델링 연구 중심 -)

  • Chae, Jae-Hyun;Lee, Ji-Yeong
    • Journal of KIBIM
    • /
    • v.7 no.4
    • /
    • pp.8-20
    • /
    • 2017
  • When it comes to set up the BIM through the reverse engineering, the level of detail(LoD) required for finalized outcomes is different from each purpose. Therefore, it is necessary to establish some concrete criteria which describe the definition of LoDs on 3D modeling for the purpose of each reverse engineering. This research shows the criteria of the 1) positional accuracy, 2) generalization level, 3) scale level, 4) scope of description, and 5) the area available for application by classifying LoD from 1 to 6 on 3D modeling for each purpose of reverse engineering. Moreover, through applying those criteria for the 3D point cloud dataset of building made by terrestrial LiDAR, this research finds out the working hour of 3D modeling of reverse engineering by each LoDs according to defined LoD criteria for each level. It is expected that those findings, how those criteria of LoD on reverse engineering are utilized for modeling-workers to decide whether the outcomes can be suitable for their budget, applicable fields or not, would contribute to help them as a basic information.

Application of Library-Based Texture Mapping Method (라이브러리 기반의 Texture Mapping 기법 활용연구)

  • Song Jeong-Heon;Park Su-Yong;Lim Hyo-Suk;Kim Yong-Il
    • Proceedings of the Korean Society of Surveying, Geodesy, Photogrammetry, and Cartography Conference
    • /
    • 2006.04a
    • /
    • pp.369-373
    • /
    • 2006
  • A 3D modeling of urban area can be composed the terrain modeling that can express specific and shape of the terrain and the object modeling such as buildings, trees and facilities which are found in urban areas. Especially in a 3D modeling of building, it is very important to make a unit model by simplifying 3D structure and to take a texture mapping, which can help visualize surface information. In this study, the texture mapping technique, based on library for 3D urban modeling, was used for building modeling. This technique applies the texture map in the form of library which is constructed as building types, and then take mapping to the 3D building frame. For effectively apply, this technique, we classified buildings automatically using LiDAR data and made 3D frame using LiDAR and digital map. To express the realistic building texture, we made the texture library using real building photograph.

  • PDF

A Study on the Application Possibility of Green Building Design Process based on Building Information Modeling(BIM) for Sustainable Architecture (지속가능한 건축을 위한 BIM기반 친환경건축 설계프로세스 적용가능성에 관한 연구)

  • Kim, Mi-Kyoung;Jang, Won-Jun;Choi, Hyun-Ah;Jun, Han-Jong
    • KIEAE Journal
    • /
    • v.11 no.2
    • /
    • pp.113-122
    • /
    • 2011
  • About 30% of the total annual energy consumption on the earth is used in the architectural activities, including construction, maintenance management, and demonstration of a building. Also, 40% of the natural resource consumption, 50% of $CO_2$ emissions, and 20%~50% of industrial waste emissions are produced from a building. Unfortunately, the percentage of its energy consumption is staidly increasing year by year, about 8% every year, and it recently causes a sustainable architectural concept to come to the fore globally. Indeed, the importance of the sustainable architecture is increasingly becoming a worldwide trend. BIM(Building Information Modeling) is considered a new paradigm and a powerful method in building design, construction and maintenance. BIM has characteristics similar to a building's systems. All of the components in a model have a parametric relationship to each other. Understanding and capitalizing on these interrelationships typically takes numerous iterations that span multiple projects. Optimizing the integrated strategies and technologies for a high-performance, sustainable design requires a continual look at understanding how they work together to deliver the best potential. Throughout all of these concepts, we are going to be using a variety of tools that revolve around a BIM model. Some of the tools will require a heavier use of BIM than others, but all of them will utilize the model geometry you've created as part of your design. This study presents importance and validity of energy performance analyzation in the pre-design phase for the sustainable architecture with the support of Building Information Modeling (BIM) technology.

AN INTERACTIVE BUILDING MODELING SYSTEM BASED ON THE LEGO CONCEPT

  • Chen, Sheng-Yi;Lin, Cong-Kai;Tai, Wen-Kai
    • Proceedings of the Korean Society of Broadcast Engineers Conference
    • /
    • 2009.01a
    • /
    • pp.128-135
    • /
    • 2009
  • In this paper, we proposed an interactive GUI (Graphical User Interface) system to model buildings with an editable script. Our system also provides probabilistic finite-state machine (PFSM) to define the relationships of sub-models with transformation matrices and transition probabilities for constructing new novel building models automatically. User can not only get various building models by PFSM but also adjust the probabilities of sub-models from PFSM to get desired building models. As shown in the results, the various and vivid building models can be constructed easily and quickly for non-expert users. Besides, user can also edit the script file which is provided by our system to modify the properties directly.

  • PDF

Optimal Implementation Strategies of Building Information Modeling for Construction Projects of LH

  • Lee, Ji-Eun
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.60-62
    • /
    • 2015
  • The BIM-based architectural design can be the optimal method to improve all sectors of construction industry and reduce environmental impact through digital technologies. The goals and effects of BIM needs in LH to be newly planned based on the experience of public sectors, which will ultimately contribute to maximization of effectiveness. Referring the excellent case in the UK, the current BIM standards according to maturity level 2 handle the contents related to modeling, collaborative data production, data management and assure BIM data have to be used from building construction to operation and maintenance of buildings. Therefore the strategy for the utilization of BIM for construction projects in LH consisted of three steps; first, the minimization of defects via BIM: second, strengthening the competitiveness of construction and asset management: third, upgrading the system of building production and maintenance control. After this trial, LH can accumulate know-how for building construction to be more costeffective and competitive.

  • PDF