• Title/Summary/Keyword: Building equipment construction

Search Result 494, Processing Time 0.022 seconds

Reviewing Countermeasures of Building Equipment Part Due to the Expansion of the Remodeling Project (리모델링사업 확대에 따른 설비분야의 대응방안에 관한 연구)

  • Lee, Chul-Goo
    • Journal of the Korean Society for Geothermal and Hydrothermal Energy
    • /
    • v.10 no.2
    • /
    • pp.1-6
    • /
    • 2014
  • As Korea's economy is entering a period of gradual growth, rate of growth on the construction market is becoming slow like that in developed countries. Remodeling construction market will be gradually expanded due to change in the social environment and diversification of individual demand. This study aims to promote the status of building equipment field with corresponding strategies based on the current situation that the importance of building equipment field is emphasized. Although it is desirable that building equipment construction companies lead remodeling construction, the building equipment part of general construction companies take the important role may be a advisable way, because the technology of building equipment construction companies is a little insufficient. Though building equipment field has become more important, the number of credits and professor of the field is still small than other fields of architectural engineering. More practical curriculums are necessary to meet the expectation of companies. Mechanical part of building equipment construction does not have independent law otherwise the other parts of building equipment construction. Establishing the independent law is urgent to promote the remodeling construction technology.

Knowledge and Perception Level on Building Equipment Required of CMrs at the Project Design Stage

  • Jang, Young-Jun;Kim, Jin-Dong;Kim, Gwang-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.6
    • /
    • pp.674-681
    • /
    • 2012
  • With the rise in the functions required in modern building structures, the role of the building equipment that maintains the functions of a building has been emphasized and increased. Effective management in this area is only possible when the construction manager (CMr) is qualified and has the knowledge of building equipment that is needed. Therefore, in this study, a questionnaire survey was carried out on equipment engineers and CMrs, in order to determine the level of building equipment knowledge required, and to identify the perception level of CMrs about the building equipment in the construction project at the project design stage. The results of this study revealed that the CMrs surveyed had a lower level of knowledge on the building equipment than the level that was desired by the equipment engineers. This indicates that CMrs currently have a weak capacity for the management of building equipment. It is thus necessary for CMrs to undergo systematic training in order learn more about building equipment and thus be able to manage construction projects more efficiently.

Analysis of Interference Elements for the Integrated Equipment Operation in Tall Building Construction (초고층 골조공사의 통합 장비 운영을 위한 장비 간의 간섭요소 분석)

  • Lee, Dongyoon;Lim, Hyunsu;Kim, Baek-Joong;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.173-175
    • /
    • 2013
  • In tall building construction, the equipment operation plans have an effect on productivity. Equipment, used in tall building construction, has operating plans of each it and restrictively operate owing to the first placed equipment operation. Therefore the interference of equipment was occur frequently. As it, the productivity is less effective and the construction delay occurs. This research was analysis the interference elements between the equipment for constructing the efficient equipment associated operational processes. The interference elements between the equipment derive through expert advice and analysis using IPA. Through the IPA, this research deducted the interference elements located 'Concentrate Here' which is the highest importance and the lowest performance.

  • PDF

The Development of Automated Building Equipment Design Process System Using 3D CAD (3차원 CAD정보를 활용한 건축설비설계 프로세스 시스템 개발방향)

  • Lee, Dong-Hyun;Jung, Woo-Shin;Kim, Young-Don;Song, Kyoo-Dong
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2008.04a
    • /
    • pp.269-274
    • /
    • 2008
  • It is attempted that the standardization of the construction, globalization of the engineering construction and an information oriented construction spread by setting a goal of the advanced construction industry and productivity increase of human resources within the country. Hence, it has been brought in the information oriented construction of BIM based technology for the field of construction and equipment of Korea. The current study that examines the possibility of application of 3D ; that is BIM based programs of building equipment, and make better the problems of 3D building equipment system through the Pilot Test, indicates the way of growth development about the construction of building equipment process system.

  • PDF

Significant Progress in Construction Equipment of Super High-Rise Building

  • Zhang, Kun;Wang, Hui;Wang, Kaiqiang;Cui, Jian;Chen, Bo;Li, Di
    • International Journal of High-Rise Buildings
    • /
    • v.7 no.3
    • /
    • pp.243-253
    • /
    • 2018
  • The construction of rapid developing super high-rise buildings constantly faces great challenges and the innovation of construction equipment is a focus of these challenges. In this paper, three new inventions including the operation platform, tower crane and hoist are put forward around two of the most important issues of super high-rise building construction: vertical transportation and operation environment. Study background, composition of the equipment, working principles and key technologies are introduced in sequence. In the end, the paper summarizes the main problems in the further development of construction equipment.

LIFT CYCLE PREDICTION METHOD FOR THE SELECTION OF LIFT EQUIPMENT IN SUPER TALL BUILDING CONSTRUCTION

  • Seo-kyung Won;Choong-hee Han;Junbok Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.153-160
    • /
    • 2009
  • The demand for super tall building construction is increasing worldwide. There has been a constant request for achieving early payback on investment by shortening the construction time. This pertains especially for the case of huge investment projects such as super tall building construction. It is very important to shorten the construction time for the building framework, which requires substantial construction time and cost, and this is directly related to the establishment of an optimum lift plan for construction. When there is a problem in the selection of the lift equipment, it is almost impossible to revise the selection, resulting in a possible failure of the project. Thus, the purpose of this study is to analyze the function and logic for the development of the process for the selection of lift equipment for super tall building projects and further development of making the analyzed process into a system. In line with this research objective, the process of selecting the optimum lift equipment by domestic construction company was investigated and analyzed as well as collecting the actual field data. The actual data were obtained by sensors installed on tower cranes at three construction sites with the help from the construction company.

  • PDF

The Development of Automated Building Equipment Design System Using 3D CAD Building Information (3차원 CAD정보를 활용한 건축설비 자동화시스템 구축에 관한 기초연구)

  • Song, Kyoo-Dong;Song, Seung-Yeong;Jeung, Woo-Shin
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2007.04a
    • /
    • pp.357-360
    • /
    • 2007
  • In the area of domestic construction industry, recently, standardization of construction. globalization of constructional and a building information arc required to advance increase productivity, shorten the term of works and reduce the cost of construction. The objective of this is to offer basic data of process new thesis and development for automated building equipment design system based on 3D CAD building information. This study contribute the development of automated Building equipment design system based on 3D which helps to conduct the equipment design handily and quickly.

  • PDF

How to Use Standard Market Prices for Ordinary Management System of Construction Equipment Prices in Poom-Saem (시가표준액을 활용한 건설공사표준품셈 건설기계가격 상시관리 방안)

  • Ahn, Bang-Ryul;Huh, Youngki;Kim, Dae Young;Tae, Yong-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.11a
    • /
    • pp.98-99
    • /
    • 2014
  • Construction equipment cost is critical to estimate the total construction costs, particularly in large and complicated projects. Despite its importance, the construction equipment cost may not reflect the current market value since the equipment database is being updated every 6 years at most. To keep construction equipment cost up to date, it is highly recommended to use the standard market price that is reported each year by the Ministry of Security and Public Administration (MOSPA). However, there is still a gap to adopt the standard market price system for the construction equipment cost computing system. Therefore, this paper suggests an effective way to develop a construction equipment cost estimation system.

  • PDF

Development of Algorithm for Measuring Performance Rate of Construction Equipment using a Multipurpose Composite Sensor (다목적 복합 센서를 이용한 건설 장비 성과율 측정 알고리즘 개발)

  • Kwon, Jae-bum;Kim, Chun-Hak;Kim, Chang-Won;Cho, Dae-Gu;Cho, Hun-Hee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.9-10
    • /
    • 2012
  • Efficient operation of construction equipment has become more and more important in the competitive construction environment. Accurate measurement of performance rate of construction equipment is a critical factor for a construction project planning. However, it might be quite difficult to measure the performance rate due to diverse practical limitations such as continuously variable performance rate of construction equipment, considerable indirect cost, large construction field, and so on. Therefore, the purpose of this paper is to propose an automatic algorithm that measures a performance rate of construction equipment with a multipurpose composite sensor. It is expected that the algorithm compiles database on construction equipment and in advance, facilitates efficient operation of construction equipment.

  • PDF

Heavy Equipment Management Plan for BIM-Based Construction Project (BIM을 적용한 건설공사 중장비 투입 계획 방안)

  • Kang, Kyoung-Hwan;Kim, Sang-Hwan;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.171-174
    • /
    • 2010
  • Recently, our construction industry progress using the BIM system in the construction designing part. However, there are not preparing government policy about BIM even if there are many good things using BIM system on planning of heavy equipment. Therefore, planning for a input system of heavy equipment using BIM will be a kind of first challenge in this part. However, we've tried using strength point of BIM system to make better condition of our construction fields. So this study will be expected to shorten the construction time and using heavy equipment effectively.

  • PDF