• Title/Summary/Keyword: Building Process

Search Result 4,664, Processing Time 0.036 seconds

A Study on the Adaptability of BIM-based Integrated Building Design Process in Domestic Architectural Design Firms (BIM기반 통합설계프로세스의 국내 적용 가능성에 관한 연구)

  • Lee, Jin-Hee;Jun, Han-Jong
    • Korean Institute of Interior Design Journal
    • /
    • v.16 no.6
    • /
    • pp.19-27
    • /
    • 2007
  • As AEC(architecture, engineering and construction) industry becomes larger and more complex, much information is going into each part and phase. Therefore, the existing building design process has to change and collaboration is emphasized among participants in various fields. The purpose of this study is to compare and analyze existing building design process and integrated building design process based on BIM using a IDEF0 methodology. And then, it establishes a desirable domestic integrated building design process application plan focusing on the design phase of domestic cases. As a result of analysis, flowing conclusions are included ; Firstly, problems occur on the existing building design process that are accomplished with focusing on the outcome. It makes much errors because of 2D-based information. Another problems is that collaboration doesn't go on smoothly. But, integrated building design process is accomplished with the collaboration and the coordination which pursues change and perfects cooperation. Secondly, BIM is a process of effecting optimum integrating, re-using information, and expense reduction throughout the life-cycle of a building. Moreover, it establishes a basis for the integrated building design process to build a collaboration system.

Development of Green Building Construction Process for Quality Improvement of Green Building -Focus on Case Study(POSCO Green Building)- (그린빌딩의 품질향상을 위한 친환경 시공프로세스 개발 -포스코그린빌딩 사례연구를 중심으로-)

  • Hwang, Hyun-Jun;Kim, Dae-Geon;Ryu, Kyoung-Gu
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.301-302
    • /
    • 2013
  • Green building can contribute to reduce the energy usage dramatically and can be applied to new building projects. This paper explored the efficient construction process for sustainable and green building. Construction process will be performed on the new green building projects and performance evaluation will be carred out as well. For this background, a pilot project of POSCO Green Building provides how to invigorate the low-energy green building which ensure quality and performance by establishing process concept of construction phase to realize the sustainable green building.

  • PDF

Design Criteria for Effective Public Building Construction Process (공공청사의 효율적 조성을 위한 건축디자인 기준 설정 연구)

  • Kim, Chang-Shin;Dong, Jae-Uk;Lee, Hwa-Ryong
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.13 no.1
    • /
    • pp.43-53
    • /
    • 2013
  • The purpose of this study is to propose the reasonable method for effective public building construction process. Public building service administration is necessary to make efficient public building supply and demand program. As a result, current public building precess need four steps(organize public assets, various process, establish public building service administration, design criteria). 1. Planning phase : Participation of Private Experts is guaranteed to enhance public building's function such as welfare, entertainment. 2. Design Phase : Detailed design review makes efficient and user oriented public building. 3. Construction Phase : Public Architect solve various problems among the participator especially in case of government local building construction. In conclusion, well formulated design criteria and Public building service administration make public building efficient in various field.

Integrated Architectural Engineering Design Process Using BIM Tools (BIM 도구 활용을 통한 건축공학설계의 프로세스)

  • Kang, Da-Young;Shin, Kyoo-Chul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.175-178
    • /
    • 2010
  • Public institutions and owners have been introduced to use Building Information Modeling (BIM) tools. Learning BIM becomes an important factor in design process of undergrad program. The purpose of this study is to demonstrate an integrated architectural engineering design process using BIM tools. BIM education programs are analyzed to compare the level of detail in BIM education. An architectural engineering design class needs to involve BIM to introduce integrated process. An architectural engineering design process needs be based on understanding design, building structure, construction and building services. 3D Modeling helps understanding a building structure and checking environment-friendly element analysis. As a result of this research, new process of design education is proposed under four issues.

  • PDF

Application of BIM-Based Integrated Building Design Process at the Design Phase (설계단계에서의 BIM기반 통합설계 프로세스 적용 방안에 대한 연구)

  • Seo, Chang-Seok;Ham, Nam-Hyuk;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.195-199
    • /
    • 2010
  • Today, as construction industry grows rapidly, technology has advanced throughout the whole industrial world. Architectural design phase has gone digital from the traditional method of drawing which was an important means in the past, and Building Information Modeling(BIM), an emerging new paradigm, changed architectural design process. So this paper studies the difference between a 2D-based and a BIM-based design process which are currently applied to domestic, and proposes a BIM-based integrated design process in order to help establish BIM to domestic efficiently.

  • PDF

Building Facilities Management Using the Condition Prediction Process: A Case Study of Fiberglass Doors

  • Amani, Nima
    • Journal of Construction Engineering and Project Management
    • /
    • v.4 no.3
    • /
    • pp.47-52
    • /
    • 2014
  • In the last decades, Facility Management (FM) has established itself as a key building service factor.FM includes supporting services and organizing functions essential for maintaining, operating and managing physical component and material. The purpose of the paper is to develop an economical analysis for building facilities management during its service life based on limited cost. This method helps to facilities managers and engineers to make better decisions for reducing of facilities assessment costs and increasing the facilities' service life. This paper presents the preliminary development of a model involves three stages process namely data collection, economic computation and economic process optimization. This process was tested for fiberglass doors example in a building interior and exterior system. If executives can manage essential points effectively and make decisions according to a key performance index, cost can be optimized and safety can be enhanced for installation building.

A Work Process for Productivity Improvement of Concrete Structural Frame Work in Tall Building (초고층 골조공사 생산성 향상을 위한 작업 프로세스 개선)

  • Jang Ji-Sun;Shin Yoon-Seok;Kang Kyoung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2005.05a
    • /
    • pp.161-164
    • /
    • 2005
  • According to the trend of tail building, it is essential to improve productivity in tall building construction. However, the study on that is insufficient until now. Therefore, the purpose of this study is to propose a new work process of efficient concrete structural fame work to improve productivity in tall building construction. The results of being applied proposed work process are that the 5day cycle time of concrete structural frame work is cut by 0.5day and the quantity of rebar to be demanded in concrete structural frame work is reduced.

  • PDF

A Study on the Changes of the Apartment price in Accordance with Project process of Super high-rise mixed use buildings (초고층 주상복합 건물의 개발사업 단계에 따른 주변지역 아파트가격의 변화에 관한 연구)

  • Kim, Sang Hwan;Choy, Won Cheol;Kim, Ju Hyung;Kim, Jae Jun
    • KIEAE Journal
    • /
    • v.10 no.5
    • /
    • pp.159-164
    • /
    • 2010
  • High-rising buildings are a sort of solution to recent cities. Till now real estate development was concentrated in new development on vacant lots, and it resulted urban sprawl. Generally large cities are confronted with the exodus of industry and population from city. High-rising buildings solve many problems associated with this problem. The purpose of this research is to identify the effect of super high-rise mixed use building project process on apartment price. For this study, the hypothesis is that price of apartments is influenced by project process of super high-rise mixed use building. The study concerned 4 variations of project process that is building permits stage, sale stage, construction starting stage and stage of moving into building. The target projects of buildings are selected by number of floor(over 40 floors) and construction time. And 48 apartment complex are selected around super high-rise mixed use building. This study uses hedonic price function to analysis effect of project process of super high-rise mixed use building. A price of apartments is defined as a dependent variable. Characteristics of residence, complex, district and super high-rise building are defined as independent variables. The results are as follows; first, there is no error in price model of this study. Second, it is found that apartment price was influenced negatively by building permit stage and sale stage of super high-rise mixed use building. But that was influenced positively by construction starting stage and stage of moving into building of that. Third, as the project process of super high-rise mixed use building was proceeded, price of apartments was increased.

Case Study for Developing of Standard Process about Defect Consulting Work in Apartment Building (공동주택 하자감정업무 표준절차개발을 위한 사례분석)

  • Park, Jun-Mo;Seo, Deok-Seok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.158-159
    • /
    • 2014
  • There is urgent for defect consulting work to standardize the investigated method, repaired and reinforced method, and estimated cost about defect in increasing a defect lawsuit of apartment building. For the purpose of developing the standard process of defect consulting work, the review that a used process in law and institution should take precedence. There is not prepared the national standard for defect consulting but is dependent on an experience and a practice of consultants. This study analyzes defect consulting case, defines main steps for developing the standard process, and draws phased work factors. As systemizing this, it is expected to apply to basic structure for developing the standard process of defect consulting work for the next.

  • PDF

A Study on the Design Process for Building in District of Housing through Preferences of Design Concept Determinants (개념도출인자의 선호를 고려한 주거지역 건축물의 설계과정)

  • Ryu Im-Woo;Jeong Ji-Seok;Choi Moo-Hyuk
    • Journal of the Korean housing association
    • /
    • v.15 no.6
    • /
    • pp.67-76
    • /
    • 2004
  • It is the purpose of this study that propose design process of building in residential district con-sidering preferences of design concept determinants. The procedure of this study is as follows : First, classifying concept determinants and then investigate the preference of concept determinants according to the use of building in residential district. It will be proposed the process of design concept determinants through such preferences. And We will investigate applicable steps for constructing an elementary school in land development district, in order to verify these process of architectural design. It was investigated paper-survey and case studies, made up questionnaires twice. In the results, we could verify that design process considering the preference of concept determinants in residential district. These results can help designers to design appropriately, according to building usage in residential district.