• 제목/요약/키워드: Building Method

검색결과 8,196건 처리시간 0.032초

An Experimental Study on Concrete Filled Steel Tube Column of Mock-up test take advantage of the High Strength Concerete(over the 80MPa) (초고강도 콘크리트(800kgf/$\textrm{cm}^2$ 이상)를 이용한 콘크리트충전 강관기둥에 대한 실물대 실험)

  • 이장환;공민호;전판근;정근호;이영도;정상진
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 한국건축시공학회 2004년도 학술.기술논문발표회
    • /
    • pp.21-25
    • /
    • 2004
  • The column for Steel Framed Reinforced Concrete Structure (SFRCS) and the column for Reinforced Concrete Structure (RCS) could be the most common building structure. The increasing of the need for massive space hasaffected the size of building components for supporting the massive structure. However, the changing of components size makes inefficient space of building. Hence, to meet the need for acquiring efficient space comparing the budget and cost the new structure method, Concrete Filled Tube Steel (CFT), was developed. CFT is the structure for which steel tube instead of other materials such as wood for holding concrete is used. The most benefit of this one is to help in reducing the size of the building components and local buckling because of tube steel holding concrete. For this reason, this research will examine the probability of applying CFT on construction sites by using the concrete (800kgf/$\textrm{cm}^2$) especially for CFT through the data from the real size mock-up.

  • PDF

A Study of the Environmentally Friendly Design Indicators of Building Landscape in Coastal Area (환경친화적 해안지역 건축물 경관계획 지표개발에 관한 연구)

  • Lee, Gwang-Young
    • Journal of the Korean Institute of Rural Architecture
    • /
    • 제8권1호
    • /
    • pp.62-69
    • /
    • 2006
  • This study is based on the ecological design method related with the Building Landscape in Coastal Area, basically Building Landscape design theories are affected the visual distance and visual area. The results derived of this study are as follows. First, We established design method of Building Landscape in Coastal Area in consideration of Ecological Environment that is purposed by means of the Normative theory study analysis and contents analysis related with Landscape and Architecture planning theory. Second, We can define 'Micro Landscape', 'Urban Landscape', and 'Wide Landscape'. 'Micro Landscape' are 'Near view'. 'Urban Landscape' are related 'Middle-distance view' and 'Long-distance view'. 'Wide Landscape' are related 'High & Long-distance view'. Third, We can also define 'Ecological Mode', 'Formal Aesthetic Mode', 'Psychological Mode', and 'Semiotical Mode' by the dimensions of macro scale. finally, we define 48 detailed factors types of 3 visual Area of Building Landscape in Coastal Area by the dimensions of micro scale.

  • PDF

A Study on Integrated Utilization of Urban Spatial Data and Building Data for CO2 Reduction (도시단위 건축물 CO2 저감을 위한 데이터 통합 활용 기반기술에 관한 연구)

  • Choi, Hyemi;Park, Chang-Han;Kim, Ju-Hyung;Kim, Jae-Jun
    • Journal of KIBIM
    • /
    • 제5권3호
    • /
    • pp.1-10
    • /
    • 2015
  • We have researched a character of BIM(Building Information Modeling) and GIS(Geographic Information System) data for integrated utilization of urban spatial data and building data for $CO_2$ reduction. We consider literature on integrated utilization of BIM and GIS and measure method of $CO_2$ in urban spatial unit. Among them without distortion of standard data structure, derive method how to install between BIM and GIS standard data. Rhino & Grasshopper is utilization tools of DB platform. The compatibility with existing BIM and GIS data format, graphic and numeric results can be output at the same time. And using the existing ARCHSIM, it can be easily combined for building energy analysis program. Based on BIM and GIS data to run an energy analysis target on Majang-dong, it could be poly synthetically derived the value information and graphic information.

Application of meta-model based parameter identification of a seismically retrofitted reinforced concrete building

  • Yu, Eunjong
    • Computers and Concrete
    • /
    • 제21권4호
    • /
    • pp.441-449
    • /
    • 2018
  • FE models for complex or large-scaled structures that need detailed modeling of structural components are usually constructed using commercial analysis softwares. Updating of such FE model by conventional sensitivity-based methods is difficult since repeated computation for perturbed parameters and manual calculations are needed to obtain sensitivity matrix in each iteration. In this study, an FE model updating procedure avoiding such difficulties by using response surface (RS) method and a Pareto-based multiobjective optimization (MOO) was formulated and applied to FE models constructed with a commercial analysis package. The test building is a low-rise reinforced concrete building that has been seismically retrofitted. Dynamic properties of the building were extracted from vibration tests performed before and after the seismic retrofits, respectively. The elastic modulus of concrete and masonry, and spring constants for the expansion joint were updated. Two RS functions representing the errors in the natural frequencies and mode shape, respectively, were obtained and used as the objective functions for MOO. Among the Pareto solutions, the best compromise solution was determined using the TOPSIS (Technique for Order of Preference by Similarity to Ideal Solution) procedure. A similar task was performed for retrofitted building by taking the updating parameters as the stiffness of modified or added members. Obtained parameters of the existing building were reasonably comparable with the current code provisions. However, the stiffness of added concrete shear walls and steel section jacketed members were considerably lower than expectation. Such low values are seemingly because the bond between new and existing concrete was not as good as the monolithically casted members, even though they were connected by the anchoring bars.

Building Code Typology and Application for Open BIM based Code Checking (개방형BIM기반의 건축법규검토를 위한 법규유형화 및 적용방안)

  • Kim, Inhan;Kim, Yongha;Choi, Jungsik
    • Korean Journal of Computational Design and Engineering
    • /
    • 제19권3호
    • /
    • pp.224-235
    • /
    • 2014
  • Recently, Productivity of the construction industry has been decreasing than other industries. Because of this, BIM is being spread in the construction industry. However, quality criteria for BIM data is insufficient. Regulation information is an important factor for initial architectural design evaluations. However, building code and related regulation are numerous. National building code structure in Korea is much more complex than other countries. The purpose of this study is to suggest the typology method of building code and apply to real regulations. To achieve this purpose, the authors have extracted required information to from original regulation for code checking and suggested mapping methods between extracted information and information of IFC scheme. In addition, the authors have represented EXPRESS-G diagram for extracting information from IFC scheme and suggested code checking method through stair case. Output of this study can be used as a base line data for automated code checking system based on open BIM. Automated code checking system will be utilized in architectural design evaluations and supported to increase design quality. It can be used to mount in SEUMTER that is the construction administration system of Ministry of Land, Infrastructure and Transport (MOLIT).

Analysis of Electromagnetic Effect Inside Large Buildings by External Electromagnetic Waves Using Performance-Enhanced PWB Method (성능이 보완된 PWB 방법을 사용한 외부 전자기파에 의한 대형 건물 내부의 전자기파 영향 해석)

  • Lee, Han-Hee;Lee, Jae-Wook
    • The Journal of Korean Institute of Electromagnetic Engineering and Science
    • /
    • 제30권1호
    • /
    • pp.12-22
    • /
    • 2019
  • This paper presents a method to perform a more efficient electromagnetic wave analysis inside a large building by external electromagnetic waves. Topological analysis and the PWB method are introduced for electromagnetic wave analysis. In addition, a Performance-Enhanced PWB method, which complements the performance of the PWB method is proposed. A large virtual structure was selected and an analysis environment was set up to perform the electromagnetic wave analysis inside a large building from external electromagnetic waves. A commercially available software, Wireless Insite, was used to verify the accuracy of the the Performance- Enhanced PWB method. As a result of comparing the two results in terms of accuracy, time, and memory, We conclude that the Performance-Enhanced PWB method proposed in this paper is a more efficient method in a large bulding.

Developing a Method for Estimating Urban Environmental Impact Using an Integrated Land Use-Transport Model (토지이용-교통 통합 모형을 활용한 도시 환경 영향 예측 방법론 개발)

  • HU, Hyejung;YANG, Choongheon;YOON, Chunjoo;KIM, Insu;SUNG, Junggon
    • Journal of Korean Society of Transportation
    • /
    • 제33권3호
    • /
    • pp.294-303
    • /
    • 2015
  • This paper describes a method that can be used for estimating future carbon emissions and environmental effects. To forecast future land use and transportation changes under various low carbon policies, a DELTA and OmniTRANS combination (a land use-transport integrated model) was applied. Appropriate emission estimation methods and dispersion models were selected and applied in the method. It was designed that the estimated emissions from land use and transportation activity as well as the estimated concentrations of air pollutants and comprehensive air quality index (CAI) are presented on a GIS-based map. The prototype was developed for the city of Suwon and the outcome examples were presented in this paper; it demonstrates what kinds of analysis results are presented in this method. It is expected that the developed method will be very useful for decision makers who want to know the effect of environmental policies in cities.

A Study on the Generation of the Production Material Information of a Building Block and the Simulation of the Block Erection (선체 블록의 물량 정보 생성 및 블록 탑재 시뮬레이션에 관한 연구)

  • Lee K.Y.;Roh M.I.
    • Korean Journal of Computational Design and Engineering
    • /
    • 제11권2호
    • /
    • pp.115-127
    • /
    • 2006
  • At the initial design stage, the generation process of the production material information of a building block and the simulation process of the block erection, which are required to perform the production planning and scheduling, have been manually performed by using 2D drawings, data of parent ships, and design experiences. To make these processes automatic, the accurate generation method of the production material information and the convenient simulation method of the block erection using the 3D CAD model, which was generated from the initial hull structural design system early developed by us, were proposed in this study. For this, a 3D CAD model for a whole hull structure was generated first, and the block division method for dividing the 3D CAD model into several building blocks was proposed. The generation method of the production material information for calculating the weight, center of gravity, painting area, joint length, etc. of a building block was proposed as well. Moreover, the simulation method of the block erection was proposed. Finally, to evaluate the efficiency of the proposed methods for the generation of the production material information and the simulation of the block erection, these methods were applied to corresponding processes of a deadweight 300,000 ton VLCC (Very Large Crude oil Carrier). As a result, it was shown that the production material information of a building block can be accurately generated and the block erection can be conveniently simulated in the initial design stage.

Seismic Performance Evaluation of Building Structures Based on the Adaptive Lateral Load Distribution (적응적 횡하중 분배방법을 이용한 건축구조물의 내진성능평가)

  • 이동근;최원호;정명채
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • 제8권1호
    • /
    • pp.39-58
    • /
    • 2004
  • It is very important that predict the inelastic seismic behavior exactly for seismic performance evaluation of a building in the performance based seismic design. Evaluation method of seismic performance based on the pushover analysis reflected in PBSE was developed by some researchers. For the evaluation of inelastic global and local seismic responses by pushover analysis exactly. lateral load distribution should be adjusted and reflected the dynamic characteristics of structural system and various seismic ground motions. And performance point should be determined based on the evaluation of reasonable deformation capacity of a building more exactly. An effective method based on the improved the adaptive lateral load distribution and the equivalent responses of a multistory building is proposed in this study to efficiently estimate the accurate inelastic seismic responses. The proposed method can be used to evaluate the seismic performance for the global inelastic behavior of a building and to accurately estimate its local inelastic seismic responses. In order to demonstrate the accuracy and validity of this method, inelastic seismic responses estimated by the proposed method are compared with those obtained from other analytical methods.

A Case Study on Public Building Construction Method by Public-Private Partnership in Japan (일본의 민관협력에 의한 공공건축 조성방식 사례 연구)

  • Youm, Chirl-Ho
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • 제34권12호
    • /
    • pp.3-12
    • /
    • 2018
  • The purpose of this study is to draw implications for revitalizing public-private partnership system that can reduce the financial burden of the government and utilize the creative know-how of the private sector by analyzing the cases of public building construction projects by public-private partnership method in Japan. In this study, first of all, I looked at the current state of public-private partnership policy in Japan and then selected 8 representative projects as an analysis target. Next, in order to grasp the specific situation that is aimed at securing publicity and revitalizing private participation, I analyzed the role sharing between public and private sectors in the maintenance and management of public buildings, and examined the conditions for private revenue facilities. As a result of the analysis, the following implications were drawn. First, the methods of public building construction by public-private partnership in Japan are largely divided into BTO method based on the PFI method, and the method of installing public facilities and private revenue facilities based on the term leasehold rights system. Second, measures were taken to mitigate the burden of the state and local governments in establishing public facilities. Third, the public has delegated to the private sector actively about the role that the private sector can play, expanding the role of private sector widely from design to operation in the public building construction projects. Fourth, in order to actively participate in private sectors and promote regional revitalization, private profit-making projects are widely accepted, but consideration has been given to guarantee a certain level of publicity.