• 제목/요약/키워드: Building Integrated design

Search Result 469, Processing Time 0.026 seconds

A Study on the Adaptability of BIM-based Integrated Building Design Process in Domestic Architectural Design Firms (BIM기반 통합설계프로세스의 국내 적용 가능성에 관한 연구)

  • Lee, Jin-Hee;Jun, Han-Jong
    • Korean Institute of Interior Design Journal
    • /
    • v.16 no.6
    • /
    • pp.19-27
    • /
    • 2007
  • As AEC(architecture, engineering and construction) industry becomes larger and more complex, much information is going into each part and phase. Therefore, the existing building design process has to change and collaboration is emphasized among participants in various fields. The purpose of this study is to compare and analyze existing building design process and integrated building design process based on BIM using a IDEF0 methodology. And then, it establishes a desirable domestic integrated building design process application plan focusing on the design phase of domestic cases. As a result of analysis, flowing conclusions are included ; Firstly, problems occur on the existing building design process that are accomplished with focusing on the outcome. It makes much errors because of 2D-based information. Another problems is that collaboration doesn't go on smoothly. But, integrated building design process is accomplished with the collaboration and the coordination which pursues change and perfects cooperation. Secondly, BIM is a process of effecting optimum integrating, re-using information, and expense reduction throughout the life-cycle of a building. Moreover, it establishes a basis for the integrated building design process to build a collaboration system.

A Review on Building-Integrated Wind Turbine Design (건물 일체형 풍력시스템 디자인 고찰)

  • Kim, Yong-Yee
    • The KSFM Journal of Fluid Machinery
    • /
    • v.14 no.4
    • /
    • pp.64-69
    • /
    • 2011
  • Integrating wind energy systems into building design is a small but growing trend, and high riese with their elevated wind speeds seem particularly suited to the technology. This paper deal with building-integrated wind turbine design. It thus contains two topics: wind energy and building design. Several building-integerated wind turbine design have been categorized and reviewed.

A Study on the Evaluation Method for the Degree of Integration towards Office Towers in Different Climate Zones

  • Han, Seung-Hoon;Moon, Jin Woo;Kim, Kyoung-Hee
    • Architectural research
    • /
    • v.14 no.4
    • /
    • pp.117-124
    • /
    • 2012
  • High rise office buildings represent one of the most energy-intensive architectural typologies. The growth of urban population necessitates sustainable high rise towers that lessen environmental impacts and energy consumption. Among various sustainable strategies, the integrated design is long known to be an important process that has great impact on building's sustainability. The framework for this paper is based on the case study of integrated towers that are located in different climate zones. The paper specifically addresses to what extent climate conditions influence the design of a high rise building and what kinds of the climate integrated design has been implemented. Qualitative case studies were carried out using published data and architectural drawing set. The technical work presented in the paper is based on computer simulation that examines the insolation analysis using hourly recorded weather data. The analysis results revealed that the site and building envelope integration and the site and building service systems have shown the most frequently employed in the integrated towers through the implementation of renewable resource integration, high performance envelopes and sustainable building service systems. Internal comfort and further energy saving in the integrated towers are offered through an automatic building management system. Due to the dynamic climate conditions, integration of building systems requires a sophisticated approach to building sustainability.

A Study on the Optimization of Color Module BIPV Architectural Design Using BIM - Based on the data of Seoul surveyed solar radiation - (BIM을 활용한 컬러모듈 BIPV 건축 설계 최적화 방안 연구 - 서울 지역 실증 일사량 데이터 중심으로 -)

  • Jeon, Hyun-Woo;Yoon, Hea-Kyung;Park, Suh-Jun
    • Journal of KIBIM
    • /
    • v.9 no.3
    • /
    • pp.19-29
    • /
    • 2019
  • Currently, BIPV (Building Integrated Photovoltaic) design technology lacks analysis function at the planning stage, and there is a lack of understanding and reliability of BIPV design method and system for building designers. To design and consider various building integrated solar design alternatives, the color of building integrated solar is often monotonous or does not match the design direction of the building. In this study, architectural designers can select various color modules in the planning and design process of the building and analyze the characteristics of color module solar cells and compare and analyze the actual solar radiation and predicted solar radiation in Republic ofKorea Seoul to reduce the confusion of design methods. By building a BIM design integrated system that can prove the quality of the building and analyze the shading analysis and power generation performance architecturally, it can improve the reliability of color module solar cell applicability that can express aesthetics in buildings and the predicted solar power generation capacity of each region. In the initial design stage, based on the empirical data of the BIPV system, it is possible to analyze the power generation performance for each installation angle and installation direction by analyzing the surrounding environment and the installation area, and accurately determine the appropriateness of the design accordingly.

Integrated Architectural Engineering Design Process Using BIM Tools (BIM 도구 활용을 통한 건축공학설계의 프로세스)

  • Kang, Da-Young;Shin, Kyoo-Chul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.175-178
    • /
    • 2010
  • Public institutions and owners have been introduced to use Building Information Modeling (BIM) tools. Learning BIM becomes an important factor in design process of undergrad program. The purpose of this study is to demonstrate an integrated architectural engineering design process using BIM tools. BIM education programs are analyzed to compare the level of detail in BIM education. An architectural engineering design class needs to involve BIM to introduce integrated process. An architectural engineering design process needs be based on understanding design, building structure, construction and building services. 3D Modeling helps understanding a building structure and checking environment-friendly element analysis. As a result of this research, new process of design education is proposed under four issues.

  • PDF

Application of BIM-Based Integrated Building Design Process at the Design Phase (설계단계에서의 BIM기반 통합설계 프로세스 적용 방안에 대한 연구)

  • Seo, Chang-Seok;Ham, Nam-Hyuk;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.195-199
    • /
    • 2010
  • Today, as construction industry grows rapidly, technology has advanced throughout the whole industrial world. Architectural design phase has gone digital from the traditional method of drawing which was an important means in the past, and Building Information Modeling(BIM), an emerging new paradigm, changed architectural design process. So this paper studies the difference between a 2D-based and a BIM-based design process which are currently applied to domestic, and proposes a BIM-based integrated design process in order to help establish BIM to domestic efficiently.

  • PDF

Meeting the Energy Reduction Goal on a High Rise Building thru IPD Framework

  • Jeong, Pyung Oh;Lee, Peter;Kim, Sang-jin
    • International Journal of High-Rise Buildings
    • /
    • v.2 no.2
    • /
    • pp.93-96
    • /
    • 2013
  • Greenhouse gas emissions and excessive energy consumption have been an on-going world issue nowadays. We can find that the majority portion is caused by high-rise office buildings. In order to resolve these problems, it is extremely important to implement various active or passive strategies in a building design. To successfully meet these design goals and energy reduction approaches, a project building must utilize an efficient design process from the early start. One of the most effective project delivery process called Integrated Project Delivery (IPD) will be implemented in a case study project building (KEPCO) during design phase and show how important it is to plan a project's green environmental performance goal together through an early collaboration from all key project participants, which helps to construct an successful green building design without any critical construction pitfalls.

The Layout Design of Structured Building Block Integrated Circuit (조립된 Building Block IC의 설계디자인의 문제)

  • Yi, Cheon-Hee
    • Journal of the Korean Institute of Telematics and Electronics
    • /
    • v.24 no.6
    • /
    • pp.1056-1067
    • /
    • 1987
  • This paper presents a design procedure for building block integrated circuits that is based on the digraph relaxation model. A set of optimization procedure is prosented for a minimum area and routing-fecsible placement of IC building blocks. Chip area optimization is subject to perimeter and area constraints on the component rectangles in the dissection.

  • PDF

Developing a Prototype of Green BIM -based Integrated Design Systems for Small Architectural Design Firms

  • Woo, Sae Jin
    • International Journal of Contents
    • /
    • v.12 no.1
    • /
    • pp.6-13
    • /
    • 2016
  • Since the importance of eco-friendly architecture is rapidly increasing, BIM receives significant attention as an alternative that would derive the practical results and apply the design values of eco-friendly design elements to the architectural design process. Therefore, this study establishes an Integrated Design System based on Green BIM by applying the eco-friendly design values logically and systemically. The study also proposes practical case studies to examine the possibility of application. As a result, the framework of Green based Integrated Design System(gbIDS) and a prototype of Web-based gbIDS were developed to improve the working environment of small architectural firms.

Exploring Integrated Design Strategies for the Optimal Use of BIM

  • Park, Hyoung-June;Lee, Ji-Hyun
    • Architectural research
    • /
    • v.12 no.2
    • /
    • pp.9-14
    • /
    • 2010
  • This paper introduces an experimental design studio that explores the optimal use of current digital technologies in order to employ Building Information Modeling at the early phase of design process. Based upon the outcomes from the aforementioned studio, the paper discusses the integrated design strategies for BIM in the design process. In this paper, BIM is proposed as a design tool that increases an overal design productivity more effectively and efficiently compared to BIM as a construction tool with encouraging a design communication among different partakers in the design process.