• Title/Summary/Keyword: Building Infrastructure

Search Result 1,205, Processing Time 0.026 seconds

Performance Evaluation of Smart Intersections for Emergency Response Time based on Integration of Geospatial and Incident Data

  • Oh, Heung Jin;Ashuri, Baabak
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.945-951
    • /
    • 2022
  • The major objective of this research is to evaluate performance of improved intersections for response time to emergency vehicle preemption. Smart technologies have been introduced to civil infrastructure systems for resilient communities. The technologies need to evaluate their effectiveness and feasibility to confirm their introduction. This research focuses on the performance of emergency vehicle preemption, represented by response time, when smart intersections are introduced in a community. The response time is determined by not only intersections but also a number of factors such as traffic, distance, road conditions, and incident types. However, the evaluation of emergency response has often ignored factors related to emergency vehicle routes. In this respect, this research synthetically analyzes geospatial and incident data using each route of emergency vehicle and conducts before-and-after evaluations. The changes in performance are analyzed by the impact of smart intersections on response time through Bayesian regression models. The result provides measures of the project's performance. This study will contribute to the body of knowledge on modeling the impacts of technology application and integrating heterogeneous data sets. It will provide a way to confirm and prove the effectiveness of introducing smart technologies to our communities.

  • PDF

Lifting Load Recording and Management Method of the Lift for Construction Based Sensing Information

  • Taekyu Ko;Joonghwan Shin;Kyuhyup Lee;Soonwook Kwon;Chung-Suk Cho;Suwan Chung;Goeun ,Choi
    • International Journal of High-Rise Buildings
    • /
    • v.11 no.2
    • /
    • pp.125-135
    • /
    • 2022
  • While buildings in recent days become taller and larger, many problems occur during the management of construction. Particularly, as the vertical movement of manpower and materials during construction has become longer while the lifting frequency and load increase, the need for a good lifting management practice is also increasing. Therefore, this study presents a real-time lifting performance monitoring system that can store and manage lifting records for construction management. Through review of literature and preceding studies related to construction lift, the concept of lift planning and operation management was understood, leading to the development of a system to monitor lifting operation and performance information. This system enabled quick measurement of the lifting performance during construction phase while responding to changes in the project schedule. To verify this system, a case study was conducted in which the current status and characteristics of the sensing-based lifting performance were derived.

Improvement of Defect Checklists for the Quality Inspection of Apartment Houses (공동주택 품질점검 하자 체크리스트 개선방안)

  • Yu, Byong-Jae;Bang, Hong-Soon;Kim, Ok-Kyue
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.33-34
    • /
    • 2022
  • The Apartment Defect Dispute Mediation Committee of the Ministry of Land, Infrastructure, and Transport received as many as 7,686 complaints regarding defects in 2021, and the conflict caused by these disputes on the defects is worsening. A quality inspection team system was established in January 2021 to address the deepening conflict, and this system prevented the emergence of defects in apartment houses before the residents moved in. Quality inspections were conducted based on the Housing Act standards, but the reality is that the standards for the ordinances are not systematic. Based on the analysis of the ordinances by the apartment quality inspection team, 23 out of 226 local governments utilized the quality inspection teams, and they had different standards for the quality inspection subjects and inspection periods. In addition, the inspection standards for the defect checklists used by the apartment quality inspection teams operated by local governments varied. A survey was conducted by apartment quality experts to tackle this problem and proposed improvement plans for the defect checklists used for the quality inspection of apartment houses.

  • PDF

Evaluation of the Adhesion Stability According to the Backfilling Area of the Tile back of the Bathroom of an Apartment House (공동주택 욕실의 타일배면 뒤채움 피착면적에 따른 부착안정성 평가)

  • Kim, Bum Soo;Song, Je Young;Oh, Sang Keun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.14-15
    • /
    • 2021
  • Recently, the size of tiles used for bathroom walls in apartment houses is gradually increasing in size. The problem is that when these large-sized tiles are attached by the sticking method, due to the nature of the method, there is a concern about the stability of the attachment to the part (pupil) where the tile and the adhesive are not attached. The problem is serious as it leads to lawsuits in the outbreak court. In addition, it is urgent to verify the adhesion stability of the sticking method because secondary damage occurs due to a safety accident caused by the falling of the tile. Ministry of Land, Infrastructure and Transport [Investigation of defects in apartment houses, calculation of repair cost and defect determination criteria] ① The tile adhesion strength is 0.39N/mm2 or more and ② It is specified to fill 80% or more of the base area of the tile backside, but this is currently trendy. It is considered that large-sized tiles need to be verified from multiple angles, and as part of that, we intend to verify the adhesion stability according to the area to be attached to large-sized tiles.

  • PDF

A Preliminary Study for Development of the Advanced Eye Inspection Method Using Eye-tracking Technology (시선추적기술을 활용한 건설분야 육안점검 고도화 기술 개발을 위한 기초연구)

  • Nam, Jihyun;Lim, Jonglok;Park, Chan Young;Yun, Sungmin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.275-276
    • /
    • 2021
  • In the construction industry, many of the inspection activities have been conducted by experts' eyes. The inspection performance of this kind of method is highly influenced by experience and knowledge of the expert. The experts who have fluent experience may show better inspection performance than the novice. The problem is the deficiency of experts in the near future due to the acceleration of retirement of the aging expert. Eye-tracking technology can be a solution to effectively educate the novice through transferring the knowledge of an expert and to advance the inspection activities using experts' eyes. This study, as an initial step to suggest the solution, (1) figured out the state of the art of eye-tracking technology, (2) reviewed the previous research to improve the inspection in construction using experts' eye, (3) explored the potential of the application area of eye-tracking technology, and (4) established the framework to develop the advanced inspection method in two application area which are construction site safety management and infrastructure performance measurement.

  • PDF

Analysis of Problems and Improvement of Inter-layer Joints in Apartment Houses (공동주택 층간이음부의 문제점 분석 및 개선안)

  • Bang, Hong-Soon;Kim, Ok-Kyue
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.11a
    • /
    • pp.200-201
    • /
    • 2021
  • According to the dispute cases filed for claiming the collective defect repair fees, inter-layer concrete joints turned out to be the most frequently disputed item. For this reason, this study selects the inter-layer concrete joints to further analyze the primary causes and details of each dispute case. From the results of this study, three primary causes of the disputes are found, which are 1) the absence of standard specifications for construction quality control and management after construction; 2) the absence of established standards for repair when construction defects are found. In order to prevent construction defects in inter-layer concrete joints, this study provides three suggestions including 1) the current standard specifications for inter-layer concrete joints should be further specified by the Ministry of Land, Infrastructure and Transport; 2) a construction defect should be judged according to the compliance to the standard specifications; and 3) a clear and institutional protocol needs to be established for defect repair in cases that new public apartment houses have been judged to have defects.

  • PDF

KNOTWORKING - A NOVEL BIM-BASED COLLABORATION PRACTICE IN BUILDING DESIGN PROJECTS

  • Hannele Kerosuo;Tarja Maki;Jenni Korpela
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.80-86
    • /
    • 2013
  • Knotworking represents a distributed collaborative expertise in pursuit of a task that is organized among designers from different design disciplines. Construction processes involve phases and tasks that cannot be solved in one organization only, as integration of expert knowledge from various sources is needed. Through knotworking, groups of people, tasks and tools are set to work intensively for a short period of time to solve a problem or accomplish a task. Knotworking requires intensive collaboration across organizational boundaries and hierarchies. The practice of knotworking has been developed and applied in the development of healthcare organizations, libraries and school-university relationships, but it has not previously been applied in the construction industry. In this paper, we describe the concept of knotworking and the findings of a case study that we completed in the Finnish construction industry. We will also compare the similarities and differences of the Big Room and knotworking in terms of participants, duration, target, space/infrastructure, benefits and challenges. Finally, we present some suggestions for further research and experimentation on knotworking in construction projects.

  • PDF

Development of Chatbot Self-Inspection Scenario for Structural Safety of Existing Reinforced Concrete Buildings (챗봇 활용 철근콘크리트 건축물 구조안전 자가점검 시나리오 개발에 관한 연구)

  • Yang, Jaekwang;Kang, Taewook;Shin, Jiuk
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.27 no.6
    • /
    • pp.331-337
    • /
    • 2023
  • Due to the aging of a building, 38.8% (about 2.82 million buildings) of the total buildings are old for more than 30 years after completion and are located in a blind spot for an inspection, except for buildings subject to regular legal inspection (about 3%). Such existing buildings require users to self-inspect themselves and make efforts to take preemptive risks. The scope of this study was defined as the general public's visual self-inspection of buildings and was limited to structural members that affect the structural stability of old buildings. This study categorized possible damage to reinforced concrete to check the structural safety of buildings and proposed a checklist to prevent the damage. A damage assessment methodology was presented during the inspection, and a self-inspection scenario was tested through a chatbot connection. It is believed that it can increase the accessibility and convenience of non-experts and induce equalized results when performing inspections, according to the chatbot guide.

Case study of Civil Engineering BIM Projects: Perspective of Korean Public Owners (토목분야 BIM 적용 사례 분석을 통한 발주자 관점에서의 BIM 발전 전략)

  • Kim, Changyoon;Moon, Hyoun-Seok;Nah, Heu-Suk;Kim, Jin-Uk
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.15 no.12
    • /
    • pp.7430-7437
    • /
    • 2014
  • Owing to the increase in large and complex construction projects, the design paradigm of architecture and civil engineering projects has changed from 2D CAD to 3D CAD. For this reason, to meet the strong requirements of project contractors, various efforts have been made to adopt a Building Information Modeling (BIM) technology for effective construction management. On the other hand, compared to architectural projects, only a few civil engineering project cases have been conducted in the perspective of public contractors. This is because the characteristics of civil project contractors and the negative pursuit of adopting BIM technology due to the lack of a current BIM system and technologies. Recently, positive changes in adopting BIM technology for public projects were anticipated by public owners, such as the Public Procurement Service and the Ministry of Land, Infrastructure and Transport. In this regard, this study analyzed the current BIM technology status of public owners in Korea to adopt the BIM policies and guidelines of the Korean government. Strategies for adopting BIM technologies for Korean public owners are also discussed based on an analysis of civil engineering BIM project cases.

Problems and Suggestions for Improvement Derived from an Analysis of the Work of the Urban & Residence Environment Improvement Project -Focused on the Establishment of Preparation Committee and Association Committee- (도시 및 주거환경정비사업의 업무분석을 통한 문제점과 개선 사항 -조합설립추진위원회와 조합설립 업무를 중심으로-)

  • Ryu, Han-Guk;Son, Bo-Sik
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.3
    • /
    • pp.39-47
    • /
    • 2010
  • The government has routinely made efforts to improve the living environment and infrastructure of less-developed areas through large area urban remodeling projects, which are in themselves attempts to overcome the disadvantages of piecemeal local area development. Such projects are very complex, and various stakeholders are involved. However, the data on such projects has not been well managed, and has not lent itself to being easily adopted to similar projects. In addition, there are numerous fragmented mega-projects that seem to be performed based on "rules of thumb" To address this issue, the work process of many urban and residence project types should be standardized otherwise the participants will be confused to work properly. In particular, typical residents who lack knowledge about building redevelopment, building remodeling, urban environment improvement projects, and the like think that it is difficult to establish the preparation committees and association committees for the projects. Therefore, we examined previous researches related to the urban and building renovation to solve the prescribed present problems. This paper presents the three necessary research performances: first, we analyzed the administrative work process in the related laws; second, we examined the practical work process of the preparation committee and association committee stages; and finally we deduced the problem and presented the required improvements.