• Title/Summary/Keyword: Building Information

Search Result 6,970, Processing Time 0.036 seconds

A Study on Evaluation of the Priority Order about Framework Data Building (기본지리정보 구축 우선순위 평가에 관한 연구)

  • 김건수;최윤수;조성길;이상미
    • Proceedings of the Korean Society of Surveying, Geodesy, Photogrammetry, and Cartography Conference
    • /
    • 2004.11a
    • /
    • pp.361-366
    • /
    • 2004
  • Geographic Information has been used widely for landuse and management, city plan, and environment and disaster management, etc., But geographic information has been built for individual cases using various methods. Therefore, the discordancy in data, double investment, confusion of use and difficulty of decision supporting system have been occurred. In order to solve these problems, national government is need to framework database. This framework database was enacted for building and use of National Geographic Information System and focused on basic plan of the second national geographic information system. Also, the framework database was selected of eight fields by NGIS laws and 19 detailed items through meeting of framework committee since 2002. In this research, The 19 detailed items( road, railroad, coastline, surveying control point etc.,) of framework database consider a Priority order, In the result of this research, the framework database is obtain to a priority order for building and the national government will carry effectively out a budget for the framework database building. Each of 19 detailed items is grouping into using the priority order of the framework database by AHP analysis method and verified items by decision tree analysis method. The one of the highest priority order items is a road, which is important for building, continuous renovation, and maintain management for use.

  • PDF

Development of Property Mapping Contents between Open BIM Data and Automated Code Checking System (개방형BIM 데이터와 법규 자동화 검토 시스템 간 속성 매핑 체계 개발)

  • Kim, Inhan;Bae, Jongyeon;Choi, Jungsik
    • Korean Journal of Computational Design and Engineering
    • /
    • v.22 no.2
    • /
    • pp.118-128
    • /
    • 2017
  • Many countries have been developing BIM-based building code checking system and studies in the utilization of Industry Foundation Classes (IFC) in building code checking. IFC is the open standard of BIM format. Currently, there is a disadvantage that could not include all of the attribute for the regulations of each country and there is the problem with the interoperability of the different defined IFC approach between BIM software. This study focus on developing, derived object and property by comparing through domestic regulation and IFC2x3 specification provided by the buildingSMART and classified review type depending on the interoperability of derived information. According to classified review type, the IFC data structure was established and property mapping contents were developed by including BIM software compatible information and creating a type of review plan. When the developed property mapping contents are applied into BIM-based building code checking system, checking of the BIM data generated from various fields is made effective and thus improving the interoperability of information.

The Potential of Building Information Modeling in Application Process of G-SEED

  • Chen, De Jian;Yoon, Heakyung
    • Architectural research
    • /
    • v.20 no.4
    • /
    • pp.121-128
    • /
    • 2018
  • Given the barriers to implement green building rating systems, Building Information Modeling (BIM) was suggested as an effective solution integrating information into one model and saving substantial time to facilitate certification process. Synergies between BIM and Leadership in Energy and Environment Design (LEED), the most widely used rating system, have been researched for a few decades. This paper demonstrates literature review about the development of integration between BIM and LEED. The research focuses on synergies between BIM and Green Standard for Energy & Environmental Design (G-SEED) in Korea, as one of important strategies to mitigate greenhouse gas emission. The research compares LEED and G-SEED related items based on evaluation contents. The result manifests G-SEED and LEED share many common items in different degrees. Therefore, it is entirely possible for G-SEED and BIM to adapt same developing mode of LEED and BIM. Moreover, the study measures the potential of BIM in application process of G-SEED certification by investigation of credits in LEED and G-SEED can be earned by BIM. The results of paper indicate the documentation support LEED and G-SEED may be prepared directly, semi-directly and indirectly via sustainability analyses software in BIM.

A Study on Score Comparison between Preliminary and Main Certification of Green Building Certification Criteria for Educational Facilities (국내 친환경건축물 인증제도의 예비인증과 본인증의 변화 연구-학교시설 중심으로)

  • Lee, Hyun-Woo;Choi, Chang-Ho
    • Journal of the Korean Solar Energy Society
    • /
    • v.31 no.1
    • /
    • pp.68-77
    • /
    • 2011
  • The concern of green building has been increased with an environmental problem or a rising oil price by industrialization. Therefore offices, schools and some buildings are expected to acquire the green building certification increasingly, but the information such as a process of green building certification, the state of certificated buildings, a score as specific clauses on green building certification is to seek. For not only school facilities make an effect to an student's learning achievement, but is the place where adolescents in a period of growth almost spend their life, eco-friendly school facilities is absolutely required. For this reason, systematizing the information related with the green building certification is to be needed in school field as well Therefore the effort to systematize certification management of eco-friendly school and provide information of certificated building, certification application procedure and sources related with certification for convenience is needed. Also reference material to decrease an inefficient time and expenses and to systematize certification evaluation is be able to beneficial. On the study, for such as the purpose above-mentioned, as the appraisal standard with 12 selected schools randomly is arranged. Based on the assessed scores table, features or something in common as a cause of the score change between preliminary and main certification is to be classified and anaylized.

READINESS OF NIGERIAN BUILDING DESIGN FIRMS TO ADOPT BUILDING INFORMATION MODELLING (BIM) TECHNOLOGIES

  • Mu'awiya Abubakar;Yahaya Makarfi Ibrahim;Kabir Bala
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.640-647
    • /
    • 2013
  • Building Information Modelling (BIM) has become the new international benchmark for efficiency in design, construction and maintenance of buildings. It is the platform that brings about collaboration between project stakeholders and improvement of project outcomes. With all its potentials, not much of the impact of BIM technologies has been felt in the Nigerian construction industry. This research aimed at assessing the readiness of the Nigerian building design firms to adopt BIM technologies. The research was exploratory in nature. A field survey was conducted with the use of structured questionnaire, self administered to a sample of building design consultancy firms (architectural, structural, M&E, quantity surveying, and multi-disciplinary design firms) within Abuja and Kaduna. The questionnaire sought the perception of the responding firms on the factors affecting BIM adoption in the Nigerian construction industry, and their level of readiness to adopt BIM technologies in their practices based on the four categories of readiness-management, people, process and technology. 42.26% response rate was achieved and used for analysis. ANOVA and DUNCAN post-hoc tests were used to establish the differences between the responses of the groups of firms, while means and standard deviations were obtained to establish the important factors affecting BIM adoption in Nigeria. The survey revealed that all the groups of Nigerian design firms are appreciably ready for the adoption of BIM technologies in their practice, with slight variations in their respective levels of readiness. 'Lack of awareness of BIM technology among professionals' and clients and 'lack of knowledgeable and experienced partners' were identified as the most important barriers of BIM adoption in Nigeria; while the most significant drivers are 'availability of well trained professionals' and 'cooperation and commitment of professional bodies to the adoption'. Education and training of building design professionals and cooperation of all stakeholders in the design and construction supply chain were recommended as part of measures to ensure successful adoption of BIM in the Nigerian construction industry.

  • PDF

Influence of Site Organization's Communication on Performance of Building Construction Projects (건축프로젝트 현장 조직 커뮤니케이션이 성과에 미치는 영향)

  • An, Sung-Hoon;Lee, Ung-Kyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.17 no.4
    • /
    • pp.361-367
    • /
    • 2017
  • The success of building construction projects is dependent on the cooperative ability of site organization members, which related with an organizational communication level. Therefore, the purpose of this study is to study the influence of site organization's communication on the performance of building construction projects. The results of this research are revealed that the communication quality has positive influence on the performance of building construction projects, and the information sharing has negative influence based on the results of the multiple regression analysis. So it needed to improve the performance in building construction projects that the information is shared with a normal level. the communication quality should be also raised in the project site organization. This study is expected to help to structure the site organizational management system in the building construction projects.

A Development of the On-line Maintenance and Management System for the HVAC system Using IT (IT를 활용한 공조설비의 온라인 유지관리시스템 개발)

  • Lee, Tae-Won;Kim, Yong-Ki;Kang, Sung-Ju;Woo, Nam-Sub
    • Proceedings of the SAREK Conference
    • /
    • 2008.06a
    • /
    • pp.48-53
    • /
    • 2008
  • The performances of the building service equipment relay on the individual superintendent's share for the assessment of performance, fault detection, deterioration diagnosis of the building service equipment. A major use of building energy management system(BEMS) is for monitoring plant and building's energy consumption. National building management system (N-BMS) presented in this study links buildings into a network group in order to monitor and control the buildings. How to construct the N-BMS was considered to save energy resource and to conserve performance of building service equipment. The FEMIS, facility, energy/environmental management & information system, for building service offer management process integrated with BAS, FMS and EMS and so on.

  • PDF

A Study on Grounding Technology for the Reduction of Electric Surge in IBS Building (IBS 빌딩에서의 서어지 저감을 위한 접지방안 연구)

  • 박중양;김학련;최규형
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2003.11a
    • /
    • pp.87-92
    • /
    • 2003
  • According to the realization of highly information dependent society, the recent building system is developed into the concept of suitable for management of intellegent work, which is demanded to unify of IBS(Intelligent Building System), IC(information communication), OA(office automation), BA(building automation) system and computer technology. However inspite of the presence arrester, cable shielding, insulated TR, filter, earth etc., in the IBS building for the cope with several surge and noise has several problems from the wrong operation of the equipment which caused from several surge, damage of equipment, and noise etc. And the miss operation caused by wrong earth works, which must be considered at first during the building construction. In order to minimize these problems, it's necessary that various earth project are performed effectively, and bonding methods between the mutual wiring of earth system and the equipments in the building should be improved sucessively. So in this paper, we analyze present domestic conditions of the earth technology in IBS building, and propose minimization method for the various surge and noise problem, and examine and analyze through the applied works.

  • PDF

HAZARD EVALUATION OF WORK TYPES FOR BUILDING CONSTRUCTION

  • Seong-Seok Go;Hyuk Song;Han-Min Lee;Hyun-Chul Lee
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.786-790
    • /
    • 2005
  • As the scale of building construction is larger and more complex and the adaptation of new technology is increasing, the tendency of the risk serious accident cases is increasing now. Especially, the accident rate is below 10% at the building construction workers in Korea but among the total industrial accidents it exceeded by 35%. To prevent a construction accident, it is essential that not only to have a through grasp of the characteristic of safety problem but also to establish of efficient safety counter plan are required. According to the type and situation of building construction, the acquirement of necessary information is useful to prevent the hazard of work and establish the counter plan. Among the safety information it is a thing of especial importance that to estimate the hazard of work types for building construction to prepare the counter plan of safety. This study will analyze all of the1600 accidents of the building construction works from the data of KOSHA(Korea Occupational Safety &Health Agency) which were collected during 11 years(1992~2002) data relating to serious accidents of the building construction works, and suggest the counter plan according to the each work type in building construction works.

  • PDF

A Process for Replacing BIM Property Information about Internal Finishing of Office Building in Design Phase (업무시설 설계단계 BIM 내부마감 속성정보 교체 프로세스)

  • Han, Ji-Ho;Nam, Dong-Hee;Park, Sang-Hun;Koo, Kyo-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.207-208
    • /
    • 2023
  • The procedure of predicting the construction cost and selecting the best alternative is performed based on comparative review of each building case. In the case of office building, it is required continuously until design is complete, since the owner requirements are various and likely to change during the design process compared to a standardized apartment. However, since the comparison work for each alternative in practice uses only the unit construction cost, there is no correlation between the alternative and the final result, and it is difficult to quantitatively determine the effect of the determined design factor on the total construction cost. It is needed that a means to support the generation of design alternatives using similar building cases during the design phase. This paper proposes a BIM-based data replacing process to support creating and comparison of design alternatives of internal finishing for office building. When design alternatives are created through the proposed process, it is possible to compare several similar cases with current project under equivalent design circumstance. Because only some finishing properties are replaced while maintaining the shape information such as the length, height, and base constraint of the object to be replaced.

  • PDF