• 제목/요약/키워드: Building Factors

검색결과 3,082건 처리시간 0.034초

REVOLUTIONS OF CONSTRUCTION ORGANIZATIONS TOWARDS GREEN BUILDING PRJECTS

  • Po-Han Chen;Yuan-Yuan Li
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.558-565
    • /
    • 2009
  • In recent years, the demand for green buildings is growing fast due to legislative and social pressures. Construction organizations, which play an important role in promoting building industry growth, are facing with challenges on how to adapt themselves to enhance sustainability of the buildings. In this paper, the green value chain and system frameworks, an extend application of Porter's value chain and system models, are introduced. Based on deep analysis of the green value chain and system frameworks, a revolution model for construction organizations towards green building is created. Management factors critical for a successful green building project, at the firm and project organization level, are extracted. Furthermore, external critical relationships are also identified. Fully understanding of these management factors and the model can help and enable practitioner to know what new capabilities should be deployed and developed in the long run for maximizing sustainability.

  • PDF

BIM을 이용한 건설리스크 해결 가능성 도출 (Identifying Potential Opportunities of BIM for Construction Risk Management)

  • 원종성
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2019년도 추계 학술논문 발표대회
    • /
    • pp.201-202
    • /
    • 2019
  • This paper aimed to identify potential opportunities of building information modeling (BIM) utilization for construction risk management. Construction risk factors and BIM functions were derived through conducting in-depth literature review. Nineteen construction risk factors could be resolved by various BIM functions. Phase planning, site analysis, design authoring, and 3D design coordination were identified as the most efficient BIM functions for construction risk management.

  • PDF

Quantified Impact Analysis of Construction Delay Factors on Steel Staircase Systems

  • Kim, Hyun-Mi;Kim, Tae-Hyung;Shin, Young-Keun;Kim, Young-Suk;Han, Seungwoo
    • 한국건축시공학회지
    • /
    • 제12권6호
    • /
    • pp.636-647
    • /
    • 2012
  • Construction projects have become so large, complicated and incredibly high-tech that process management is currently considered one of the most important issues. Unlike typical manufacturing industries, most major construction activities are performed in the open air and thus are exposed to various environmental factors. Many studies have been conducted with the goal of establishing efficient techniques and tools for overcoming these limitations. Productivity analysis and prediction, one of the related research subjects, must be considered when evaluating approaches to reducing construction duration and costs. The aim of this research is to present a quantified impact analysis of construction delay factors on construction productivity of a steel staircase system, which has been widely applied to high rise building construction. It is also expected to improve the process by managing the factors, ultimately achieving an improvement in construction productivity. To achieve the research objectives, this paper analyzed different delay factors affecting construction duration by means of multiple regression analysis focusing on steel staircase systems, which have critical effects on the preceding and subsequent processes in structure construction. Statistical analysis on the multiple linear regression model indicated that the environment, labor and material delay factors were statistically significant, with 0.293, 0.491, and 0.203 as the respective quantified impacts on productivity.

RLS-90 및 CRTN 모델에 의한 도로 인접건물에서의 도로소음 영향 예측 및 고찰 (Prediction and Evaluation of the Road Traffic Noise according to the Conditions of Road-side Building Using RLS-90 and CRTN Model)

  • 이장욱;김명준
    • 한국소음진동공학회논문집
    • /
    • 제19권4호
    • /
    • pp.425-432
    • /
    • 2009
  • Recently, reduction of road traffic noise in residential buildings has become one of the most important subjects. To reduce the road traffic noise, noise impact assessment by the road traffic prediction model is required before building construction. For reasonable road traffic noise prediction, it is required to analysis of various factors in road traffic prediction models. This paper was studied the road traffic noise propagation factors such as distance from road to building, receiver height, alignment angle of building and reflection coefficient of the building facade by two calculation models, RLS-90 and CRTN. The result showed that noise reduction was generally higher at bottom stories by ground absorption effect. The reflection coefficient of the building facade was affect of additional sound pressure level by facade reflecting. And alignment angle of building at $90^{\circ}$ was performed effective noise reduction better than $0^{\circ}$.

한국과 중국의 건축물 전과정 탄소배출량 평가 비교분석에 관한 연구 (A Study on the Comparative Analysis of Building Life Cycle Carbon Emission Assessment in Korea and China)

  • 정붕비;태성호;임효진;김현숙
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.155-156
    • /
    • 2023
  • This study aims to analyze the factors that cause differences in the evaluation results of the life cycle carbon emissions assessment of buildings in both Korea and China as part of the methodology research of building life cycle assessment for Chinese buildings to promote building life cycle assessment in China. Specifically, it examines the building LCA standards of Korea and the standard for building carbon emission calculation in China as mentioned in the green building certification systems of both countries. Based on the investigation of the two standards, the life cycle carbon emissions of the evaluation target building were evaluated using the building life cycle assessment methods of both countries, and the influencing factors that cause differences in the life cycle carbon emission assessment results of the two countries were analyzed.

  • PDF

시설물 환경개선 예산편성을 위한 항목분석 - 경상남도 학교시설물 중심으로 - (Factor Analysis for Environment Improving Budget of Facilities - Focused On School Facility In Gyeongsangnamdo -)

  • 홍강민;유현주;류한국
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2015년도 춘계 학술논문 발표대회
    • /
    • pp.255-256
    • /
    • 2015
  • House supplying rate of building facilities is over 100% in 2008. In modern society, many people are thus interested in maintenance phase of building facilities by environment improvement budget because 20 years or more of building facilities are increasing rapidly. Maintenance of building facilities is depending on various factors that impact on the environment improvement budget of building facilities. However, Various methods and factors are made up complex relationships. I will analyze that environment improvement budget associated with floor, gross area, local, school type, service life and other elements.

  • PDF

건축물 골조공사용 먹매김 자동화 시스템 개발방향 연구 (Development Directions for Automated Layout System of Building Structures)

  • 임현수;조규만;김태훈
    • 한국건축시공학회지
    • /
    • 제21권5호
    • /
    • pp.387-396
    • /
    • 2021
  • 건축공사에서 먹매김 공정은 건물의 구성요소를 계획된 위치에 정확히 형성하기 위한 기준이 되므로 높은 정밀도가 요구된다. 최근의 건축물 규모 증가 및 숙련공 부족 추세에서 먹매김 공사는 로봇 기반의 자동화 기술 도입을 통한 생산성 및 품질 향상 요구가 크게 나타나고 있으며, 특히 가장 선행되는 골조공사 먹매김 작업의 중요도 및 자동화 필요성은 더욱 크다고 할 수 있다. 이러한 배경에서 본 연구는 건축물 골조공사용 먹매김에 적합한 시공 자동화 시스템 개발 방향을 제시하고자 한다. 기존 유사 기술 고찰을 토대로 하여 5가지 구성기술과 17개의 세부 기술요소를 도출하였으며, 전문가 설문을 통한 중요도 평가를 수행하였다. 설문 결과, 열악한 주행 및 작업 환경에 대응하기 위한 주행부 및 마킹부 기술이 가장 중요한 구성기술로 파악되었으며, 이러한 환경에서 정밀도를 확보하기 위한 제어기술과 전반적인 프로세스의 자동화기술의 중요성이 높게 나타났다. 본 연구 결과는 향후 보다 실용적이고 효율적인 자동화 시스템 개발에 기여할 것이다.

사무소 리모델링의 실내환경요소에 대한 선호도 분석 -수요자와 공급자 측면 비교를 중심으로- (An Analysis for Recognizing the priority of Indoor Environmental Factors in office Remodeling)

  • 최진혁;박태은;이정복;김소연;이경회
    • KIEAE Journal
    • /
    • 제2권4호
    • /
    • pp.57-64
    • /
    • 2002
  • Nowadays the importance of Building Remodeling as a means to create an architectural environment capable of responding to the social, economic changes has increased more than before. After long time pass, the aged building have faced the need for the overall repair of the structure and function. Remodeling is much more saving the time and cost than new construction in the office building. This study was focused in functional and efficient evaluation. Based on these points, we developed the evaluation factors, and verified a validity of evaluation factors through a survey. The purpose of this study was focused on the Analysis for Recognizing the priority of Indoor Environmental Factors in office Remodeling. This study provides us the competitive guidance of remodeling. The owners and tenants take the maximum efficiency with the minimum cost.

건축물 모듈러 공법 적용을 위한 단계별 관리요인 기초적 분석 (A Basic Analysis of the Management Factors the Application of Modular Construction Method in Buildings)

  • 김성은;이신자;임형철
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.373-374
    • /
    • 2023
  • Modular construction is a cost-effective and time-saving method of building that involves prefabricating modules in a factory and assembling them on-site. However, effective management factors must be considered at each stage of the process to ensure quality and stability. This study analyzes these management factors and proposes systematic ways to manage them, including construction planning, data management, and quality assurance. Proper management can improve construction quality, shorten construction time, and reduce costs. These stage-specific management factors are crucial for the success of modular construction projects, and further research and efforts are needed to promote its widespread use in the construction market.

  • PDF

PCM mold 측면에서 FCP 생산-설치 레이아웃 영향요인 분석 (Analysis on the factors influencing layout for production-installation work of Free-form Concrete Panels in PCM mold)

  • 임지영;이동훈;김선국
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2015년도 춘계 학술논문 발표대회
    • /
    • pp.121-122
    • /
    • 2015
  • The demand on free-form buildings is gradually increasing, but there are several problems such as increased cost and construction duration, and decreased constructability at the construction phase upon construction of a building owing to the difficulty of member production-installation. To solve these problems, a technology to produce FCP using a CNC machine was developed. Basically, it delivers the information on a free-form building designed to the CNC machine, the shapes of RTM and PCM are created using the information delivered and FCP are produced with the RTM and PCM which act as forms. Since the construction duration and project cost are limited on site, the efficiency of FCP production-installation is significant for application of the technology. For it is almost impossible to change the production-installation layout and process once they are set in the construction phase, they should be carefully determined. Before the production-installation layout are established, it is necessary to analyze the factors that influence the duration. Thus, the study intends to analyze influence factors in PCM mold on estimation of the production-installation duration for FCP. According to the analysis of influence factors, a simulation model for estimation of the duration that changes depending on the constraint conditions can be built.

  • PDF